Name of Project: SPACE RENOVATION

Location: BGRY.POBLACION,APO SANDAWA PHASE 3, KIDAPAWAN CITY


Owner: FUSION GAS STATION

Sub-Total
ITEM 01 WALLS
A. WALLS- SMOOTH FINISHED 70,719.25 70,719.25
B. DRY WALLS 16,469.80 16,469.80
87,189.05
ITEM 02 CEILING 19,530.75 19,530.75
ITEM 03 ARCHITECTURAL FINISHES
A. ROLL UP DOORS 35,700.00 35,700.00
B. PAINTING 33105.00 33105.00
68,805.00
Total Material Cost: 136,294.00
Total Labor Cost: 58,430.80

Supervision 5% 9,736.24
Total Project Cost 204,461.04

PREPARED BY: CONFORME:


JUSHA CHRIST L. BUGAS FUSION GAS STATION
CONTRACTOR OWNER