Professional Documents
Culture Documents
This checklist should be used in accordance with the Maintenance execution Procedure
Project Details
E.g. Project Title JLN Fertilizers Plants Year2 LS E.g. Customer OCP
E.g. Project Number Q1110311.4 E.g. Project Manager BASSIR HAKIM
[3] Are all the documents required to performing the work prepared and
☒ ☐
conform?
[7] Are the human resources qualified according to the requirements of the
☒ ☐
job?
[8] Are the tasks as indicated in the method statement carried out according
to the measurements and the requirements indicated? If not, indicate the ☒ ☐
gabs with more details in the comments section.
Rework
Does this work need to be redone as Rework? If yes, the rework must be ☐ Yes ☒ No
reported for record, for monitoring, and analysis.
Comments
Approval