Detailed Procurement Plan - Procurement of Goods & Works

Country / Executing Agency UGANDA / UGANDA NATIONAL ROADS AUTHORITY (UNRA)


Name of Project/Program NAMAGUMBA-BUDADIRI-NALUGUGU ROAD UPGRADING PROJECT
Loan No.

Basic Data Bidding Document Bidding Period Bid Evaluation Contract Finalization
Date Bid Contract
Issue No. Lump Sum Estimated Prior Review Plan Date Bid Date Bid Date Date Date
Procurement Package Lot Procurement Pre-or-Post Date Date No Evaluation Date No- Amount
Package Descritption Lot No. Invitation or Bill of Cost (USD or Proc Revised Invitation Closing/ Contract Contract Contract
System No. Description Method Qualification Submitted Objection Report Objection (Millions)
for Bids Quantities million) Audit Actual (SPN) Opening Award Signature Completion
Submitted (Currency)
OCB
NA NA 14/04/2023 Lump Sum 1 Post Prior Plan 3/17/23 3/31/23 4/14/23 6/13/23 7/28/23 8/11/23 9/25/23 1 USD 10/9/23 4/6/24
Supply of Emergency Equipment at Post-Crash (International)
Bank PMPs 1.1 Revised
Care and Injury Recovery Centre l
Actual

NA NA 18/03/2023 Lump Sum 0.2 OCB (National) Post Proc. Audit Plan 2/18/23 3/4/23 3/18/23 5/17/23 7/1/23 7/15/23 8/29/23 0.2 USD 9/12/23 3/10/24
BPS 1.2 Supply of Two (2) Ambulances
Revised
Actual

Supply of Two (2) Vehicles to Mount Elgon Labour NA NA 18/03/2023 Lump Sum 0.15 OCB (National) Post Proc. Audit Plan 2/18/23 3/4/23 3/18/23 5/17/23 7/1/23 7/15/23 8/29/23 0.15 USD 9/12/23 3/10/24
BPS 1.3 Based Training Centre (MELTC) - Pickups Double Revised
Cabins Actual
OCB
NA NA 16/04/2023 Lump Sum 44.71 Post Prior Plan 12/19/22 1/2/23 1/16/23 4/16/23 5/21/23 6/4/23 7/19/23 44.71 USD 8/2/23 8/1/26
Construction of Namagumba - Budadiri - Nalugugu (International)
Bank PMPs 2.1
(37km) Revised
Actual 12/20/22 1/17/23 1/19/23
NA NA 08/07/2023 Lump Sum 13.25 Restricted Post Proc. Audit Plan 5/11/23 5/25/23 6/8/23 7/8/23 8/7/23 8/21/23 10/5/23 13.25 USD 10/19/23 10/18/24
Feeder Roads Rehabilitation using Labour-Based
BPS 2.2 Revised
Technology (60 km)
Actual
NA NA 01/08/2023 Lump Sum 1.48 Restricted Post Proc. Audit Plan 6/4/23 6/18/23 7/2/23 8/1/23 8/31/23 9/14/23 10/29/23 1.48 USD 11/12/23 5/10/24
BPS 2.3 Construction of Village Footbridges (10 No.) Revised
Actual
Total Cost