Professional Documents
Culture Documents
Country/Organisation: NIGERIA
Project/Programme: ABAKALIKI RING ROAD PROJECT Draft Bid Documents, If Post-Review, No-objection Dates are not needed
including specs and
Loan #: GOODS PROCUREMENT PLAN 2019 quantities, draft SPN Spec Proc Notice Bidding Period Bid Evaluation Contract Finalization Contract Implementation
Advert
Ref. No. Description* Package Lot Estimated Amount in Procurement Pre-or Post Prior or Post Plan vs. Prep & Submission No-objection On-line UNDB Bid Invitation Date Bid Closing-Opening Submission No-objection Plan vs. Actual Contract Amount in Date Date Date Opening Mobilization Advanced Arrival Inspection Final Cost
Number Number US $ Method Qualification Review Actual by Ex Agency Date Gateway Bid Eval Rpt Date US$'000 Contract Contract Contract of Payment of Final
Nat Press Award Advert Signature Let of Credit Goods Acceptance
Norm Duration of Proc Steps If Prequalification Plan 4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to 12 wks 1.5 - 3 wks 1 - 1.5 wks Plan 1 wk 1.5-3 wks
add 7-13 wks Actual Actual
Procurement of Office Equipment, Stationery and Cleaning Materials EBSRRP/GD/ 1 79,365.08 RFQ POST POST Plan NA NA NA 25-Mar-19 8-Apr-19 N/A N/A Plan 79,365.08 15-Apr-19 N/A 6-May-19 NA NA 27-May-19 3-Jun-19
1.A.1 RFQ/19/01 POST Actual Actual
Contract Preparation Short Consultant Proposal Evaluation and Negotiation for Projects after May 2002 Draft Contract Contract
Type Request for Proposals List Proposals Technical (T) & Financial (F) and Negotions (N) Implementatio
n
Ref. No. Description* Package Number Selection Lumpsum Estimated Prior/Post Plan vs. Prep & No-objection On-line UNDB Lead-time Submission No-objection Plan vs. Invitation Submission/ Submission No-objection Opening Preparation Negotiations Plan vs. Submission No-objection Contract Contract Date Contract Plan vs. Mobilization Draft Final Final
Method or Amount Review Actual Submission Date Gateway before shortlist Date Date Actual Date Opening Evaluation Evaluation Financial Eval Report (N) Actual Date Date Amount in Award Contract Signature Actual Advance Report Report Cost
Time-Based in US$ by Ex Ag Nat Press Date Report (T) Report (T) Proposals (T) (F) US$ '000 Advert Payment
Norm Duration of Proc Steps Plan 3 - 6 wks 1 - 2 wks 1 - 1.5 wks 2 wks 1 - 2 wks Plan 4 to 12 wks 2 - 3 wks 0.5 - 2 wks 2 wks 1 - 2 wks 2 wks Plan 1 - 2 wks 1 - 2 wks
1.A.6 Procurement of a firm for the Consultancy Services for the EBRRP/CS/QCBS/ QCBS TS 412,698.41 Prior Plan 18-Mar-19 1-Apr-19 15-Apr-19 13-May-19 27-May-19 10-Jun-19 Plan 17-Jun-19 15-Jul-19 05-Aug-19 19-Aug-19 26-Aug-19 09-Sep-19 16-Sep-19 Plan 23-Sep-19 7-Oct-19 412,698.41 14-Oct-19 17-Oct-19 28-Oct-19 Plan 18-Nov-19 1-Apr-21 29-Apr-21
Supervision of the Abakaliki Ring Road Project. 19/01
1.A.7 Procurement of a Consultant for the Environmental and EBRRP/CS/QCBS/ CQS LS 126,984.13 Post PLAN NA NA 25-Mar-19 8-Apr-19 NA NA Plan 22-Apr-19 3-Jun-19 NA NA NA 10-Jun-19 17-Jun-19 Plan NA NA 126,984.13 24-Jun-19 NA 1-Jul-19 Plan 8-Jul-19 30-Aug-19 29-Sep-19
Safety Services 19/01
Actual Actual Actual