You are on page 1of 4

3- Pile Cap Estimated

1.Lenth 8.33 ft ভু মি 2.33 ft


2.Width 7.66 ft উচচতা 4.66 ft
3. Thikness 3.58 ft

volume 1 228.431924 cft


volume 2 38.870924 cft
volume 189.561 cft

Ratio 1-1.5-3
Sum Ratio 5.5

Dry Volume 284.3415 cft

Cement 41.358763636 bag


sand 77.547681818 cft
stone 155.09536364 cft
Rectangular a*b
Tapigum= 1/2*a+b*h
33.087010909 Volume 183.972
Dry Volume 275.958

cement 40.1394
1.3637

1ঘনমিটার =30 bag

2-pile cap estimated

length 8.33 ft
width 3.33 ft
thikness 3.166 ft

volume 87.8213574 cft

Dry volume 131.7320361 cft

Cement 19.161023433 bag


Sand 20.757775385 cft
stone 71.853837873 cft
Column Num 2 1 2
5 pile cap total Column C1=12*24C2=(12*27) C3=(12*24)
Hight 30 in
Cement 95.805117164 bag
Sand 103.78887693 cft
stone 359.26918936 cft No Description Number Length wide
1 C1 2 2 1.25
2 C2 3 2.25 1.25
3 C3 2 2.5 1.25
4 SW1 1 0.833333333 3.333333333

saptik tank 156*160 #10@6c/c


hight=4ft
SW1= 10*40

Hight Quantity Unit


2.5 12.5 cft
2.5 21.09375 cft
2.5 15.625 cft
2.5 6.9444444444 cft

volume 49.21875 cft


Dry Volume 73.828125 cft
Ratio 5.5

Cement 11.409801136 bag


sand 20.134943182 cft
Stone 40.269886364 cft