This document contains a concrete footing estimate for two footings (F1 and F2) that provides dimensions, volumes, quantities of materials needed, and other details. It lists the number, top and bottom lengths and widths, heights, areas, and volumes for two sections of each footing. It then calculates the total volume, dry volume, sum ratio, quantities of cement, sand, and stone needed for each footing.
This document contains a concrete footing estimate for two footings (F1 and F2) that provides dimensions, volumes, quantities of materials needed, and other details. It lists the number, top and bottom lengths and widths, heights, areas, and volumes for two sections of each footing. It then calculates the total volume, dry volume, sum ratio, quantities of cement, sand, and stone needed for each footing.
This document contains a concrete footing estimate for two footings (F1 and F2) that provides dimensions, volumes, quantities of materials needed, and other details. It lists the number, top and bottom lengths and widths, heights, areas, and volumes for two sections of each footing. It then calculates the total volume, dry volume, sum ratio, quantities of cement, sand, and stone needed for each footing.