Roof tile of last floor

Sr.No. Quantity
Length Bridth
30 x 50 = 1500.00 Sft

Total = 1500.00 Sft


1500 x 0.125 = 187.50 Cft

2 If Ratio (1:3)

i. Tiles
1500 x 3.55 = 5325 Nos.

Wet Quantity
188 x 0.3 = 56.3 Cft

ii. Cement 0.25 x 56 = 14 Cft


Cement Bags 14 / 1.25 = 11 Bags

iii. Sand 0.75 x 56 = 42 Cft


roof steel
Cft Pounds
steel 1000 x 4.5 x
0.454 2043 Kg
CEMENT CONCRETE
Sr.No. Quantity
Lenght Thickness Height
81.5 x 30 x .41 = 1002.45 Cft
79 x 30 x .167 = 395.79 Cft
0 x 10 x 0.5 = 0
0 x 10 x 0.5 = 0
0 x 10 x 0.5 = 0
0 x 10 x 0.5 = 0
0 x 10 x 0.5 = 0
0 x 10 x 0.5 = 0

Total = 1398 Cft

1 If Ratio (1:1.5:3)

Dry Quantity
1398 x 1.54 = 2153 Cft

i. Cement 0.18 x 2153.3 = 392 Cft

Cement Bags 392 / 1.25 = 313 Bags

ii. Sand 0.545 x 2153.3 = 1175 Cft

iii. Aggregates 0.273 x 2153.3 = 587.2608 Cft

2 If Ratio (1:2:4)

Dry Quantity
1398 x 1.54 = 2153.3 Cft
i. Cement 0.14 x 2153.3 = 308 Cft

Cement Bags 308 / 1.25 = 246 Bags

ii. Sand 0.286 x 2153.3 = 615 Cft

iii. Aggregates 0.571 x 2153.3 = 1230.451 Cft

3 If Ratio (1:3:6)

Dry Quantity
1398 x 1.54 = 2153.3 Cft

i. Cement 0.10 x 2153.3 = 215 Cft


Cement Bags 215 / 1.25 = 172 Bags

ii. Sand 0.300 x 2153.3 = 646 Cft

iii. Aggregates 0.600 x 2153.3 = 1291.974 Cft

4 If Ratio (1:4:8)

Dry Quantity
1398 x 1.54 = 2153.3 Cft

i. Cement 0.077 x 2153.3 = 166 Cft


Cement Bags 166 / 1.25 = 133 Bags
ii. Sand 0.308 x 2153.3 = 663 Cft

iii. Aggregates 0.615 x 2153.3 = 1325 Cft

5 If Ratio (1:5:10)

Dry Quantity
1398 x 1.54 = 2153.3 Cft

i. Cement 0.063 x 2153.3 = 135 Cft


Cement Bags 135 / 1.25 = 108 Bags

ii. Sand 0.313 x 2153.3 = 673 Cft

iii. Aggregates 0.625 x 2153.3 = 1346 Cft

6 If Ratio (1:6:12)

Dry Quantity
1398 x 1.54 = 2153.3 Cft

i. Cement 0.053 x 2153.3 = 113 Cft


Cement Bags 113 / 1.25 = 91 Bags

ii. Sand 0.316 x 2153.3 = 680 Cft

iii. Aggregates 0.632 x 2153.3 = 1360 Cft


7 If Ratio (1:6:18)

Dry Quantity
1398 x 1.54 = 2153.3 Cft

i. Cement 0.040 x 2153.3 = 86 Cft


Cement Bags 86 / 1.25 = 69 Bags

ii. Sand 0.240 x 2153.3 = 517 Cft

iii. Aggregates 0.720 x 2153.3 = 1550 Cft

8 If Ratio (1:7:20)

Dry Quantity
1398 x 1.54 = 2153.3 Cft

i.
Cement 0.036 x 2153.3 = 77 Cft
Cement Bags 77 / 1.25 = 62 Bags

ii. Sand 0.250 x 2153.3 = 538 Cft

iii. Aggregates 0.714 x 2153.3 = 1538 Cft


Brick work
Sr.No. Quantity
Lenght Thickness Height
28.83 x 1.125 x 11.25 = ### Cft
28.83 x 0.75 x 11.25 = ###
11 x 0.75 x 11.25 = 92.8125
28.83 x 1.5 x .75 = 32.43375 Cft
28.83 x 1.125 x .75 = ###
11 x 1.125 x .75 = 9.28125
28.83 x 1.875 x .25 = ###
28.83 x 1.5 x .25 = 10.81125
11 x 1.5 x .25 = 4.125
-6 x 0.75 x 7 = -31.5
-5 x 1.125 x 7 = -39.375
-7 x 1.125 x 7 = -55.125
###
Total = 669.44 Cft 8595.55744

1 If Ratio (1:2)

i. Bricks
669 x 13.50 = 9037 Nos.

Wet Quantity
669 x 0.3 = 200.8 Cft

ii. Cement 0.33 x 201 = 66 Cft


Cement Bags 66 / 1.25 = 53 Bags

iii. Sand 0.66 x 201 = 133 Cft

2 If Ratio (1:3)
i. Bricks
669 x 13.50 = 9037 Nos.

Wet Quantity
669 x 0.3 = 200.8 Cft

Dry Quantity
201 x 1.27 = 255 Cft

ii. Cement 0.25 x 255 = 64 Cft


Cement Bags 64 / 1.25 = 51 Bags

iii. Sand 0.75 x 255 = 191 Cft

3 If Ratio (1:4)

i. Bricks
669 x 13.50 = 9037 Nos.

Wet Quantity
669 x 0.3 = 200.8 Cft

ii. Cement 1/5 x 669 = 134 Cft


Cement Bags 134 / 1.25 = 107 Bags

iii. Sand 4/5 x 669 = 536 Cft

4 If Ratio (1:5)

i. Bricks
669 x 13.50 = 9037 Nos.
Wet Quantity
669 x 0.3 = 200.8 Cft

ii. Cement 1/6 x 669 = 112 Cft


Cement Bags 112 / 1.25 = 89 Bags

iii. Sand 5/6 x 201 = 167 Cft

5 If Ratio (1:6)

i. Bricks
669 x 13.50 = 9037 Nos.

Wet Quantity
669 x 0.3 = 200.8 Cft

ii. Cement 1/7 x 669 = 96 Cft


Cement Bags 96 / 1.25 = 77 Bags

iii. Sand 6/7 x 201 = 172 Cft

4 If Ratio (1:7)

i. Bricks
669 x 13.50 = 9037 Nos.

Wet Quantity
669 x 0.3 = 200.8 Cft

Dry Quantity
201 x 1.27 = 255 Cft
ii. Cement 1/8 x 255 = 32 Cft
Cement Bags 32 / 1.25 = 26 Bags

iii. Sand 7/8 x 255 = 223 Cft

4 If Ratio (1:8)

i. Bricks
669 x 13.50 = 9037 Nos.

Wet Quantity
669 x 0.3 = 200.8 Cft

Dry Quantity
201 x 1.27 = 255 Cft

ii. Cement 1/9 x 255 = 28 Cft


Cement Bags 28 / 1.25 = 23 Bags

iii. Sand 8/9 x 255 = 227 Cft


### ###
cement pointing
Sr.No. Quantity
Lenght Thickness Height
160 x 0.0625 x 10 = 100.00 Cft
160 x 0.0625 x 10 = 100.00
160 x 0.0625 x 10 = 100.00
160 x 0.0625 x 10 = 100.00
160 x 0.0625 x 10 = 100.00
160 x 0.0625 x 10 = 100.00
160 x 0.0625 x 10 = 100.00
Total 700 Cft

1 If Ratio (1:2)

Wet Quantity
700 x 0.3 = 210.0 Cft

Dry Quantity
210 x 1.27 = 267 Cft

Cement 0.33 x 267 = 89 Cft


Cement Bags 89 / 1.25 = 71 Bags

Sand 0.66 x 267 = 176 Cft

2 If Ratio (1:3)

Wet Quantity
700 x 0.3 = 210.0 Cft

Dry Quantity
210 x 1.27 = 267 Cft
Cement 0.25 x 267 = 67 Cft
Cement Bags 67 / 1.25 = 53 Bags

Sand 0.75 x 267 = 200 Cft

3 If Ratio (1:4)

Wet Quantity
700 x 0.3 = 210.0 Cft

Dry Quantity
210 x 1.27 = 267 Cft

Cement 1/5 x 267 = 53 Cft


Cement Bags 53 / 1.25 = 43 Bags

Sand 4/5 x 267 = 213 Cft

4 If Ratio (1:5)

Wet Quantity
700 x 0.3 = 210.0 Cft

Dry Quantity
210 x 1.27 = 267 Cft

Cement 1/6 x 267 = 44 Cft


Cement Bags 44 / 1.25 = 36 Bags
Sand 5/6 x 267 = 222 Cft

5 If Ratio (1:6)

Wet Quantity
700 x 0.3 = 210.0 Cft

Dry Quantity
210 x 1.27 = 267 Cft

Cement 1/7 x 267 = 38 Cft


Cement Bags 38 / 1.25 = 30 Bags

Sand 6/7 x 267 = 229 Cft


cement sand plaster 1/2" thick
Sr.No. Quantity 1/2" thick
Lenght Thickness Height
58 x 0.041667 x 12 = 29.00 Cft
57 x 0.041667 x 12 = 28.50
37 x 0.041667 x 10 = 15.42
64.67 x 0.041667 x 10 = 26.95
22 x 0.041667 x 10 = 9.17
52 x 0.041667 x 10 = 21.67
54 x 0.041667 x 10 = 22.50
22 x 0.041667 x 10 = 9.17
25 x 0.041667 x 10 = 10.42
62 x 0.041667 x 10 = 25.83
50 x 0.041667 x 10 = 20.83
52 x 0.041667 x 10 = 21.67
50 x 0.041667 x 10 = 20.83

Total 261.95 Cft

1 If Ratio (1:2)

Area x Thickness
Wet Quantity
262 x 0.041667 = 10.9 Cft

Dry Quantity
11 x 1.27 = 14 Cft

i Cement 0.33 x 14 = 5 Cft


Cement Bags 5 / 1.25 = 4 Bags

ii Sand 0.66 x 14 = 9 Cft

2 If Ratio (1:3)
Wet Quantity
262 x 0.041667 = 10.9 Cft

Dry Quantity
11 x 1.27 = 14 Cft

i Cement 0.25 x 14 = 3 Cft


Cement Bags 3 / 1.25 = 3 Bags

ii Sand 0.75 x 14 = 10 Cft

3 If Ratio (1:4)

Wet Quantity
262 x 0.004167 = 1.1 Cft

Dry Quantity
262 x 1.27 = 333 Cft

i Cement 1/5 x 333 = 67 Cft


Cement Bags 67 / 1.25 = 53 Bags

ii Sand 4/5 x 333 = 266 Cft

4 If Ratio (1:5)

Wet Quantity
262 x 0.041667 = 10.9 Cft
Dry Quantity
11 x 1.27 = 14 Cft

i Cement 1/6 x 14 = 2 Cft


Cement Bags 2 / 1.25 = 2 Bags

ii Sand 5/6 x 14 = 12 Cft


designing of stair in auto cad.
If height is 12 feet

Tread size = 10 inch

Riser size = 7 inch


No of step = Height / riser

12 / 0.583333 = 20.57143
d.

6.5 0.583333
11.14286