Department of Land Resources


Ministry of Rural Development, Government of India
Digital India Land Records Modernization Programme (DILRMP)

Map Digitization - Physical Progress

State Name: GUJARAT


District Name: Bharuch
Tehsil Name: Bharuch
Execution mode of Digitization work: Government

S Village Total No Total No Of Output Spatial Are Are Are Bhu- Status Other Remark
. of No of Mapshe Format Data Cadast Cadastr Cadastr Naksha Entry Softwar
N Mapshe Mapsh ets/ Of verified ral al Maps al Maps used for Date e used
o ets/ eets/ FMBs/ Digitize Maps linked simulta Cadastr for
. FMBs/ FMBs/ Tippans d Data Geo- With neously al Maps Cadastr
Tippans Tippan Digitize Refere ROR updated al Maps
s in d nced with
good ROR
conditi
on
( (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
1
)
1 Adol 1 1 1 DWG, Done Done 13/05/22 739
SHP
2 Amdada 1 1 1 DWG, Done Done Done Not Done 13/05/22 1282
SHP
3 Amlesh 3 3 3 DWG, Done Done Not Done Not Done 26/09/20
war SHP
4 Angares DWG, Done 13/05/22 619
hwar SHP
5 Asuria 1 1 1 DWG, Done Done 13/05/22 246
SHP
6 Bambus 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 274
ar SHP
7 Bhadbh 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 716
ut SHP
8 Bhartha 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 420
na SHP
9 Bholav 1 1 1 DWG, Done Done Not Done Not Done 26/09/20
(CT) SHP
1 Bhuva 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 694
0 SHP
1 Borbhat DWG, Done 13/05/22 694
1 ha Bet SHP
1 Bori 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 433
2 SHP
1 Chavaj 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 3518
3 SHP
1 Cholad 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 328
4 SHP
1 Dabhali 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 438
5 SHP
1 Dahega 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 2095
6 m SHP
1 Dashan 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 342
7 SHP
1 Dayadra 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 1777
8 SHP
1 Derol 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 1004
9 SHP
2 Detral 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 391
0 SHP
2 Eksal 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 758
1 SHP
2 Ghodi 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 431
2 SHP
2 Haldar 1 1 1 DWG, Done Done Done Not Done Done 21/04/22 904
3 SHP

Page 1 of 4
S Village Total No Total No Of Output Spatial Are Are Are Bhu- Status Other Remark
. of No of Mapshe Format Data Cadast Cadastr Cadastr Naksha Entry Softwar
N Mapshe Mapsh ets/ Of verified ral al Maps al Maps used for Date e used
o ets/ eets/ FMBs/ Digitize Maps linked simulta Cadastr for
. FMBs/ FMBs/ Tippans d Data Geo- With neously al Maps Cadastr
Tippans Tippan Digitize Refere ROR updated al Maps
s in d nced with
good ROR
conditi
on
( (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
1
)
2 Haldarw DWG, Done Done 13/05/22 431
4 a SHP
2 Hingalla 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 962
5 SHP
2 Hinglot 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 1729
6 SHP
2 Jhadesh 2 2 2 DWG, Done Done Not Done Not Done 26/09/20
7 war SHP
(CT)
2 Jhangha 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 1465
8 r SHP
2 Jhanor 4 4 4 DWG, Done Done Done Not Done Done 13/05/22 2312
9 SHP
3 Kahan 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 1217
0 SHP
3 Kamboli 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 966
1 SHP
3 Kanthari 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 2033
2 ya SHP
3 Karela 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 949
3 SHP
3 Kargat 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 325
4 SHP
3 Karjan 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 480
5 SHP
3 Karmad 3 3 3 DWG, Done Done Done Not Done Done 13/05/22 1206
6 SHP
3 Karmali 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 317
7 SHP
3 Kasad 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 924
8 SHP
3 Kasva 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 573
9 SHP
4 Kavitha 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 853
0 SHP
4 Kelod 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 822
1 SHP
4 Kesrol 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 442
2 SHP
4 Kishnad 1 1 1 DWG, Done Done Not Done Not Done 26/09/20
3 SHP
4 Kothi 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 960
4 SHP
4 Kukarw 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 734
5 ada SHP
4 Kurala 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 412
6 SHP
4 Kuvadar 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 159
7 SHP
4 Luwara 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 286
8 SHP
4 Mahega 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 576
9 m SHP
5 Mahudh 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 683
0 ala SHP
5 Maktam 2 2 2 DWG, Done Done Not Done Not Done 26/09/20
1 pur (CT) SHP
5 Manad 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 849
2 SHP
5 Manch 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 535
3 SHP
5 Mangles 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 909
4 hwar SHP

Page 2 of 4
S Village Total No Total No Of Output Spatial Are Are Are Bhu- Status Other Remark
. of No of Mapshe Format Data Cadast Cadastr Cadastr Naksha Entry Softwar
N Mapshe Mapsh ets/ Of verified ral al Maps al Maps used for Date e used
o ets/ eets/ FMBs/ Digitize Maps linked simulta Cadastr for
. FMBs/ FMBs/ Tippans d Data Geo- With neously al Maps Cadastr
Tippans Tippan Digitize Refere ROR updated al Maps
s in d nced with
good ROR
conditi
on
( (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
1
)
5 Manuba 2 2 2 DWG, Done Done Not Done Not Done 26/09/20
5 r SHP
5 Nabipur 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 2213
6 SHP
5 Nand 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 491
7 SHP
5 Nandela 1 1 1 DWG, Done Done Not Done Not Done 26/09/20
8 v (CT) SHP
5 Navetha 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 407
9 SHP
6 Nikora 3 3 3 DWG, Done Done Done Not Done Done 13/05/22 1961
0 SHP
6 Osara 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 193
1 SHP
6 Padariy 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 538
2 a SHP
6 Pagutha 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 983
3 n SHP
6 Palej 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 754
4 (CT) SHP
6 Pariej 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 1615
5 SHP
6 Parkhet 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 1910
6 SHP
6 Pipalia 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 673
7 SHP
6 Rahadp 1 1 1 DWG, Done Done Not Done Not Done 26/09/20
8 or SHP
6 Samlod 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 638
9 SHP
7 Sankhv 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 370
0 ad SHP
7 Sarnar 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 642
1 SHP
7 Segva 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 1193
2 SHP
7 Shahpur 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 760
3 a SHP
7 Sherpur 1 1 1 DWG, Done Done Not Done Not Done 26/09/20
4 a (CT) SHP
7 Shuklati 3 3 3 DWG, Done Done Done Not Done Done 13/05/22 1899
5 rth SHP
7 Simalia 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 1425
6 SHP
7 Sindhot 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 793
7 SHP
7 Sitpon 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 2328
8 SHP
7 Tankariy 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 4773
9 a SHP
8 Tavara 5 5 5 DWG, Done Done Not Done Not Done 26/09/20
0 SHP
8 Tham 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 878
1 SHP
8 Thikaria 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 679
2 SHP
8 Tralsa 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 1756
3 SHP
8 Tralsi 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 405
4 SHP
8 Umara 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 364
5 SHP
8 Umraj 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 2094
6 SHP

Page 3 of 4
S Village Total No Total No Of Output Spatial Are Are Are Bhu- Status Other Remark
. of No of Mapshe Format Data Cadast Cadastr Cadastr Naksha Entry Softwar
N Mapshe Mapsh ets/ Of verified ral al Maps al Maps used for Date e used
o ets/ eets/ FMBs/ Digitize Maps linked simulta Cadastr for
. FMBs/ FMBs/ Tippans d Data Geo- With neously al Maps Cadastr
Tippans Tippan Digitize Refere ROR updated al Maps
s in d nced with
good ROR
conditi
on
( (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12) (13) (14)
1
)
8 Uparali 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 312
7 SHP
8 Vadadla 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 1024
8 SHP
8 Vadva 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 223
9 SHP
9 Vagusa 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 405
0 na SHP
9 Vahalu 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 1165
1 SHP
9 Vansi 2 2 2 DWG, Done Done Done Not Done Done 13/05/22 1027
2 SHP
9 Varedia 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 1134
3 SHP
9 Verwad 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 123
4 a SHP
9 Vesdad 1 1 1 DWG, Done Done Done Not Done Done 13/05/22 1864
5 a SHP
Total 125 125 125 93 95 80 0 79 0 82224

The DILRMP-MIS is designed and hosted by National Informatics Centre Ministry of Electronics and Information Technolgy, Government of India.Content
provided and owned by the Department of Land Resources Ministry of Rural Developmennt, Government of India.Data entered and updated by different users of concerned
State Government / UT Administration.

Page 4 of 4