Pipe Ø33,7mm/Ø28,5mm 3 Units

Gusset h=650mm , b=5mm 4 Units

0
Pipe

𝟑, 𝟑𝟕𝒄𝒎𝟒 − 𝟐, 𝟖𝟓𝒄𝒎𝟒
J= = 𝟑, 𝟏𝟓𝒄𝒎𝟒 3 Units --> 𝟗, 𝟒𝟓𝒄𝒎𝟒
𝟐𝟎

Gusset

𝒃. 𝒉³ 𝟎, 𝟓𝒄𝒎 ∗ 𝟔𝟓𝒄𝒎³
J= = = 𝟑𝟖𝟏𝟒𝒄𝒎𝟒 4 Units --> 𝟏𝟓𝟐𝟓𝟔𝒄𝒎𝟒
𝟑𝟔 𝟑𝟔
𝟒 𝟒
ƩJ= Jpipe + Jgusset = 𝟗, 𝟒𝟓𝒄𝒎 + 𝟏𝟓𝟐𝟓𝟔𝒄𝒎 = 𝟏𝟓𝟐𝟔𝟓𝒄𝒎𝟒

𝑭. 𝒍³ 𝟖∗𝑬∗𝑱
f= f= 𝟏 ÷ 𝟕𝟓𝟎 --> F=
𝟖∗𝑬∗𝑱 𝟕𝟓𝟎∗𝒍³

Normal Fill Level 400mm=40cm

𝟖 ∗ 𝟐 ∗ 𝒍 ∗ 𝑬𝟔 ∗ 𝟏𝟓𝟐𝟔𝟓 = 3561kg per meter


𝑭= = F=5342kg Per 1.5m
𝟕𝟓𝟎 ∗ 𝟒𝟎³

Overfill Level 650mm=65cm

=
F=1259kg/Per 1.5m 839 kg per meter

Material Load for 650mm

Fm=0,65*1m*1m*1,1 ton/m³ = 715kg

Normal Fill Level is Sufficient

Overfill level is around the height of the gussets. This level is sufficient. If higher leves is observed, additional gussets may be applied