You are on page 1of 3

Page: 1

SID-10-VDB-MDD-IDM-001
Of: 3
ELECTRICITY GENERATION COMPANY OF BANGLADESH
CLIENT:
LTD.

PROJECT: SIDDHIRGANJ 335 MW COMBINED CYCLE POWER PLANT

WATER BALANCE

WATER BALANCE

5 25/04/2014 FOR DESIGN MPS EAA ACM


4 18/11/2013 FOR DESIGN MPS JCM ACM
3 31/08/2013 FOR DESIGN MPS JCM ACM
2 12/02/2013 FOR DESIGN MPS CMO ACM
1 14/01/2013 FOR DESIGN FPV CMO ACM
0A 22/11/2012 FOR APPROVAL FPV CMO ACM
REV DATE DESCRIPTION AUTHOR REVISED APPROVED
Page: 2
SID-10-VDB-MDD-IDM-001
Of: 3

CLIENT: ELECTRICITY GENERATION COMPANY OF BANGLADESH LTD.

PROJECT: SIDDHIRGANJ 335 MW COMBINED CYCLE POWER PLANT

WATER BALANCE

CONTROL OF MODIFICATIONS

Issue Date Modifications

0A 22-11-12 For Approval (OC)

1 14-01-13 For Design (OC)

2 12-02-13 For Design (OC)

3 31-08-13 For Design (OC)

4 18-11-13 For Design (OC)

5 23-04-14 For Design (OC)

5 25/04/2014 FOR DESIGN MPS EAA ACM


4 18/11/2013 FOR DESIGN MPS JCM ACM
3 31/08/2013 FOR DESIGN MPS JCM ACM
2 12/02/2013 FOR DESIGN MPS CMO ACM
1 14/01/2013 FOR DESIGN FPV CMO ACM
0A 22/11/2012 FOR APPROVAL FPV CMO ACM
REV DATE DESCRIPTION AUTHOR REVISED APPROVED
SID-10-VDB-MDD-IDM-001

CLIENT: ELECTRICITY GENERATION COMPANY OF BANGLADESH LTD.

PROJECT: SIDDHIRGANJ 335 MW COMBINED CYCLE POWER PLANT

WATER BALANCE Rev 5

WATER FOR COOLING


BLOWDOWN TANK 2,76
5,50 VENT TO
ATMOSPHERE

5,20
Note 2 SLUDGE
DEHYDRATION
5,80 BACKWASHING 1,68
TANK WASH WATER Note 4
GT COMPRESSOR
COLLECTION (BY
1,40 0,15 WATER WASH SKID 0,15 AUTORIZED AGENT)
FIRE
4,40 THICKENER 1,40 PROTECTION
THICKENER SYSTEM
SLUDGE TANK 6,90
BLOWDOWN
CONDENSER HRSG
TANK
3,74 3,74
0,03
COAGULATION
FLOCCULATION
ABOVEGROUND ABOVEGROUND 4,82
DAF (UF + RO + MB) ABOVEGROUND
PRE-TREATED CLARIFIED CHEMICAL DOSING
SITALAKHYA WATER STORAGE
SAND
WATER STORAGE
DEMI WATER 3,57 SAMPLING SYSTEM
FILTERS UF TANK: 1x4 m3 TANK
RIVER 579,32 559,3 570,0 TANK 565,6 TANK 14,9 RO Permeate TANK: 1x7 m3 7,49 7,46 AND OTHER
1 x 590 m3
1x50 m3 1 x 7500 m3
COAGULATION
Note 1 FLOCCULATION
DAF 7,40
MIXED BED REJECT PIT STORM WASTE
6,9 UF + RO REJECT WATER
20,00 Note 3 ABOVEGROUND
NEUTRALIZATION CHEMICAL DOSING DRAINS 7,43
TANK AREAS
EXISTING 1x20 m3 0,03
CONSUMPTION
FINAL CLEAN
LEGEND: DRAINAGE BASIN SITALAKHYA 248,05 Note 6
Red line: Recirculation flow (m3/h) SERVICE WATER SERVICE WATER
MANTEINANCE AND UNDERGROUND
(MONITORING
BASIN)
RIVER

CLEANING TURBINE CHEMICAL TANK


Blue line: Operation Flow (m3/h) 2,24 HALL, ERM,... OIL AND WATER 10 m3 32,25
SEPARATOR
Green line: Drain flow (m3/h) 32,91
Black numbers: design conditions 20,00
Note 7
Pumps
WTP= Water Treatment Plant EVAPORATION
AND DRIFT
WWP=Waste Water Plant

323,30

538,83 MAKE-UP WATER No. Cycles: 2,50 SEWAGE TREATMENT


COOLING TOWER PLANT
Note 8

0,27
215,53
NOTES:
DRINKING WATER TREATMENT
Note 1 Water quality used for design is defined in SID-10-GA_MID-IDM-001-01 TS document. PLANT
POTABLE WATER
CONSUMPTIONS
(RAW WATER FROM WELL)
Note 2 Average flow. It has been considered recovery of water from thickener's overflow and centrifuge, which will be recicled to the pretreatmet inlet.
Note 3 Average flow. It has been considered recovery of water from backwash sand filters, which will be recicled to the pretreatmet inlet. Note 5
Note 4 To be evacuated by an autorized agent only.
Note 5 Drinking water plant is sized to supply water 130 people, as indicated in “Contract Document No. F34-EGBC/2012”, volume 3 of 3, page 580.
Note 6 This water accomplish with the limits of maximum discharge limits defined in Contract Document No. F34-EGBC/2012, volumes 3 of 3, page 580. In this flow is not included the storm water.
Note 7 It is included the rain water that can contain oil
Note 8 The number of cycles has been estimated for the cooling water requirements in design conditions with combined cycle operation at full load, as indicated in the Combined Cycle Systems Heat Balance from GE (named CCA17349NG).