Professional Documents
Culture Documents
M.1kI
30.45 Ha
17.80 l/dt
13.80 Ha
BG.0
BG.1 BM.1
MM.1
BG.0 - BG.1 BG.1 - BM.1 45.00 Ha
37.41 l/dt
A = 825.80 Ha A = 42.80 Ha 29.00 Ha
Q = 1313.02 L/dt Q = 61.20 L/dt
L = 212.00 m L = 200.00 m
BG.1 - BG.2
A = 783.00 Ha
Q = 1244.97 L/dt
L = 680.00 m
LEGENDA
G.7ki
95.60 Ha 98.69 l/dt
BG.3 G.3ki 76.50 Ha
45.00 Ha
38.70 l/dt
30.00 Ha
A
G.8ka B D
BG.3 - BG.4 BG.7 BG.7 - BG.8 105.75 Ha 111.59 l/dt C
BG.8
A = 575.00 Ha A = 145.50 Ha 86.50 Ha
Q = 914.25 L/dt Q = 231.35 L/dt
L = 1400.00 m L = 1240.00 m
G.7ka
BG.4 BG.6 - BG.7
G.4ki 49.60 Ha 41.93 l/dt
17.50 Ha A = 254.50 Ha 32.50 Ha
15.00 l/dt Q = 404.66 L/dt
8.50 Ha L = 1200.00 m
G.5ki G.6ki G.6ka K.1 ki K.2ki K.3ki
94.60 Ha 44.00 Ha 70.50 Ha 71.50 Ha 43.00 Ha
97.40 l/dt 39.00 Ha 30.96 l/dt
36.12 l/dt 67.73 l/dt 67.73 l/dt 34.83 l/dt
75.50 Ha 24.00 Ha 28.00 Ha 52.50 Ha 52.50 Ha 27.00 Ha
BG.4 - BG.5 BG.5 - BG.6 BG.6 - BK.1 BK.1 - BK.2 BK.2 - BK.3
A = 566.50 Ha A = 491.00 Ha A = 184.00 Ha A = 132.00 Ha A = 79.50 Ha
Q = 900.74 L/dt Q = 780.69 L/dt Q = 263.12 L/dt Q = 188.76 L/dt Q = 113.69 L/dt
L = 500.00 m L = 480.00 m L = 260.00 m L = 1200.00 m L = 1300.00 m MK.3
71.70 Ha
BG.5 BG.6 BK.1 BK.2 BK.3 67.73 l/dt
52.50 Ha
Propinsi :
NUSA TENGGARA TIMUR
PPK :
Kegiatan Perencanaan dan Program
Balai Wilayah Sungai Nusa Tenggara II
Pekerjaan :
SKEMA JARINGAN IRIGASI Review Design D.I.Gising 1.150 Ha
di Kabupaten Manggarai
DI.GISING No. register :
Direncana Ir. Edy A. Soentoro No. lembar :
Diperiksa Ir.Tonny A. Hartono Tanggal No. kontrak