You are on page 1of 4

Value Engineering ME371

Assignment
Unit-1

Sonu Kumar 2K21/ME/268


Q1. Explain Value Analysis and its objective.
Q2. Write the key points of Value Engineering.
Q3. Why do we need Value Engineering?
Q4. Explain the Darsari method.
Q5. Write down the factors from which we find the cost of the product.

Himanshu Tiwari 2K21/ME/129


Q6. On which Basis we judge the performance of products?
Q7. What are the reasons for unnecessary cost?
Q8. Write down the importance of value Engineering.
Q9. Explain function-identity of value Engineering.
Q10. Write the steps used in the analysis of the product.

Keshav Nath 2K20/ME/123


Q11. What are the phases of Value Analysis?
Q12. Briefly explain the Matrix Method for Value Analysis.
Q13. What are the common objectives of Value Engineering?
Q14. What are some reasons for unnecessary costs?
Q15. What can be problems faced during Value Analysis?

Apoorv Ambavat 2K20/CO/094


Q16. Describe value analysis and its purpose.
Q17. Summarize the Value Engineering main points.
Q18. What causes a cost that is unnecessary?
Q19. List the variables that influence the product's price.
Q20. Write down the procedures followed during the product analysis.

Dishu 2K20/EE/096
Q21. What is the primary objective of value engineering?
Q22. What are the key steps in the value engineering process?
Q23. Why is cost-benefit analysis important in value engineering?
Q24. Briefly explain the difference between value analysis and value engineering.
Q25. List advantages of value engineering.

Sagar Kumar Sah 2K20/CO/385


Q26. What is the main goal of Value Engineering?
Q27. Explain the concept of function-identity in Value Engineering.
Q28. What are some reasons for unnecessary costs in a product?
Q29. Describe the importance of Value Engineering.
Q30. List the steps involved in the analysis of a product during the Value Engineering
process.

Akagra Gupta 2K21/EE/30


Q31. How does value engineering differ from cost cutting?
Q32. What role does collaboration play in value engineering initiatives?
Q33. Give an example of a successful value engineering project.
Q34. How does value engineering benefit construction projects?
Q35. What are the key steps in the value engineering process?

Tushar Gautam 2K21/ME/285


Q36. Explain Value Analysis and its objective.
Q37. What are the reasons for unnecessary cost?
Q38. Briefly explain the Matrix Method for Value Analysis.
Q39. Describe the importance of Value Engineering.
Q40. List advantages of value engineering.

Anand Jha (2K21/EE/42)


Q41. What are the common objectives of Value Engineering?
Q42. Why is cost-benefit analysis important in value engineering?
Q43. What is the primary goal of value engineering?
Q44. Describe value analysis and its purpose.
Q44. How cost-cutting measures differ from value engineering.
Q45. Explain the Darsari method.

Vaibhav Singh(2K20/MC/149)
Q46 How does value engineering differ from cost engineering?
Q47 What are the key principles of value engineering?
Q48 What are the benefits of using value engineering?
Q49 What are the different types of value engineering studies?
Q50 What is value engineering?

Pratham(2K21/ME/198)
Q51 What is the main objective of value engineering?
Q52 Describe main reasons for unnecessary cost?
Q53 Briefly explain the value engineering in your own words
Q54 Briefly explain the advantages of value engineering
Q55 Differentiate between value engineering and value analysis

Rishabh Jha (2K21/EE/237)


Q56 What are the benefits of using value engineering?
Q57 Differentiate between value analysis and value engineering.?
Q58 Summarize the Value Engineering main points.
Q59 What are the reasons for unnecessary cost?
Q60 Compare and contrast quaCompare and contrast quality control and quality
assurance in a manufacturing environment.

Gaurav Panghal(2K21/ME/111)
Q61. Give an example of a successful value engineering project
Q62. What are the key steps in the value engineering process?
Q63. What is the primary objective of value engineering?
Q64. Describe value analysis and its purpose.
Q65. List the variables that influence the product's price.

Samriddhi Kejriwal 2K21/ME/241


Q66.What is the primary objective of value engineering?
Q67. What are the key steps in the value engineering process?
Q68. Why is cost-benefit analysis important in value engineering?
Q69. Briefly explain the difference between value analysis and value engineering.
Q70. List advantages of value Engineering.

Ravi KUmar Rauniyar (2K20/CO/356)


Q71.Briefly explain the Matrix Method for Value Analysis.
Q72.Describe main reasons for unnecessary cost?
Q73. Briefly explain the advantages of value engineering
Q74.What is the primary objective of value engineering?
Q75.Write the steps used in the analysis of the product.
Aashish Bikram Gupta (2K20/CO/008)
Q76. Explain Value Analysis and its objective.
Q77. Differentiate between value analysis and value engineering.
Q78. Explain the Darsari method.
Q79. Explain the Matrix Method for Value Analysis.
Q80. Explain the concept of function-identity in Value Engineering.
Ujjwal Tomar (2K21/ME/287)
Q81. What do you mean by `Make or Buy Decisions?
Q82.What is mean by value analysis/value engineering?
Q83.What do you mean by value of a product?
Q84. List any four advantage of value engineering.
Q85. Write any four objectives of value analysis.
Hardik(2K21/ME/117)
Q86. What do you mean by value of a product?
Q87. What are the different functions of a product?
Q88. List any four advantages of Value engineering?
Q89. Is Value engineering different from other optimization methods?
Q90. How do we get started improving values?
Piyush Vishvakarma (2K21/ME/189)
Q91. What do you mean by Value Engineering ?
Q92. What is the importance of Value Engineering ?
Q93. Explain the approach of Value based analysis.
Q94. What is the main objective of Value Engineering ?
Q95. Describe the methodology of Value Engineering.

Harsh (2K20/ME/103)
Q96. Write a short note on : 1) Darci Method 2.) Matrix Method
Q97. Difference between Value Engineering and Value Analysis.
Q98. Explain in brief :1. Make or Buy Decisions 2. value of a product 3. Function-identity
Q99. Define Value Engineering and write its importance?
Q100. Write a short note on key milestones in Value Engineering history.

AMAN PAHADIA(2k21/ME/39)
Q101. What is the fundamental purpose of value engineering in a project ?
Q102. How does value engineering help in identifying essential functions ?
Q103. Why is it important to have clear understanding of project before initiating value
engineering?
Q104. Explain the concept of cost-justification.
Q105. How does value engineering helps in improving quality of production?

Anshul khandelwal 2K21/ME/56


Q106. What is the primary goal of value engineering?
Q107. What is dasari method explain it
Q108. Explain the approach of Value based analysis
Q109. List any four advantages of Value engineering?
Q110. Why is cost-benefit analysis important in value engineering?

You might also like