1. MAST
1) REMOVAL
(1) Backrest
Backrest
Η Remove bolts securing backrest to fork
carriage. Lift backrest straight up and Bolt
remove it from carriage.
Carriage
Fork
BRP7MS121
(2) Forks
Backrest
Η Remove shaft cover and bolt. Pin
Θ Remove fork set pin and then draw out Knob
Spring
the shaft.
Ι Carefully remove forks one by one.
Carriage
Fork
Center notch
BRP7RE03
(3) Carriage
Η With the mast vertical, raise the carriage
high enough to place blocks under the
load forks. This is done to create slack in
the load chains when the carriage is
lowered. Lower the carriage all the way
down to the floor. Make sure the carriage
is level, this will prevent any binding when
the mast is raised. BRP7RE04
2-2
Θ While supporting lift chains, remove the
split pins and nuts from anchor bolts of
Lift chain
stationary upright.
Outer mast
Nut
Split pin
BRP7RE05
15/23BRP-7
Reach
support
Lift
chain
18/20BRP-7
BRP7RE06
Carriage
Block
BRP7RE07
2-3
(4) PIPING
Η Remove the return hoses and clamps
attached to the cylinder.
Θ Remove the return hoses from the
connector. To
Inner
mast control
Ι Remove hose assembly, connector, valve
down safety valve from the lift cylinder.
Κ Disconnect hose assembly from the flow
regulator.
Middle
mast
Lift
cylinder
Outer
mast
BRP7RE08
2-4
(6) MAST REMOVAL
Η Pass wire rope around the inner and
outer masts to allow lifting them out with
a hoist.
Crane
Θ Remove the stopper pin at the end of
reach cylinder and then remove the
stopper bolt at the end of guide rail.
Ι Draw out the mast from the guide rail with
Mast
lifting up.
Κ Lower the mast and place it on stand.
Wire rope
BRP7RE10
Inner mast
Middle mast
Outer mast
BRP7RE11
2-5
2) INSTALLATION
After assembling mast components totally without piping connections, install mast assembly to the
equipment.
ö Installation procedure for each of mast component is the reverse of the removal procedure.
(1) LIFT CYLINDER INSTALLATION AND ADJUSTMENT
Η Assemble the lift cylinder inside the outer
mast, then tighten the stopper bolt. If the
cylinder assembly has been replaced, Inner
mast
adjust as follows so that the left and right
cylinders are synchronized at the Shim
maximum lifting height. Cylinder
Θ Assemble the cylinder rod to the inner rod
mast, and check the left-to-right play of
the mast at the maximum lifting height.
ö If play is to LEFT, install adjustment
shim to LEFT cylinder. Outer
mast
ö If play is to RIGHT, install adjustment
BRP7RE12
shim to RIGHT cylinder.
ÂShim thickness : 1.0mm(0.04in)
2-6
2. POWER TRAIN ASSEMBLY
1) REMOVAL
Side door
BRJ7RE001
EMERGENCY
SWITCH
r
ecto
nn
co
ble
ca
ry
tte
Ba TRACTION
INVERTER
PUMP
INVERTER
15BRP7OM121
Side door
BRP7RE13
(3) Disconnect the hose, pipe and wiring from To control valve
pump & motor assembly. Mounting bolt
Loosen mounting nuts from frame and
then take out the assembly. Wiring
Pump
Pump motor
assembly
Hose
Mounting nut
2-7
(4) Disconnect the wiring.
Η Drive motor wiring
Θ EPS motor wiring.
(5) Loosen mounting bolts from frame and
Drive motor
then take out drive unit assembly.
EPS
motor
Mounting
bolt BRP7RE17
Jack up
Wood block
BRP7RE18
BRP7RE19
2-8
2) INSTALLATION
Installation is in the reverse order to
removal, but be careful of following points.
(1) Drive unit mounting bolts : 6EA
Drive motor
ÂTightening torque : 13.3~15.3kgfÂm
EPS
(96.2~110.6lbfÂft) motor
2-9
3. ELECTRICAL COMPONENTS
Before removing each component, disconnect cables and earth lines attached to the component.
1) REMOVAL
Side door
BRJ7RE002
r
ecto
nn
co
le
cab
ery
Batt
TRACTION
INVERTER
PUMP
INVERTER
15BRP7OM121
Side door
BRP7RE13
2-10
Ι Disconnect the hose, pipe and wiring To control valve
from pump & motor assembly. Mounting bolt
r
ecto
nn
co
le
cab
ery
Batt
TRACTION
INVERTER
PUMP
INVERTER
15BRP7OM121
Side door
BRP7RE13
Ι Disconnect wirings.
a. Drive motor wiring
b. EPS motor wiring
Drive motor
EPS
motor
BRP7RE17A
2-11
Κ Remove bolts connecting the motor and
drive unit.
Mounting
bolt
Mounting
bolt
BRP7RE22
Drive motor
Drive unit
BRP7RE23
BRP7RE24
2-12
(3) EPS MOTOR LINE
CONTACTOR
r
ecto
nn
co
ble
ca
ttery
Ba TRACTION
INVERTER
PUMP
INVERTER
15BRP7OM121
Side door
BRP7RE13
Ι Disconnect wirings.
EPS
motor
BRP7RE25
EPS
motor
Mounting
bolt
BRP7RE26
2-13
(4) BATTERY REMOVAL LINE
CONTACTOR
15BRP7OM122
2-14
2) INSTALLATION
Installation is in the reverse order to
removal, but be careful of following points.
BRP7RE22
Mounting
bolt
BRP7RE26
2-15
(4) BATTERY INSTALLATION
Η Using a battery hanger, carefully put the
battery assembly compartment push the
battery assembly to the frame.
Θ Adjust the lock screw of side support in
frame.
Ι Connect the battery connector.
Κ Complete installation.
15BRP7OM122
LINE
CONTACTOR
EMERGENCY
SWITCH
tor
nec
con
able
r yc
tte
Ba TRACTION
INVERTER
PUMP
INVERTER
15BRP7OM87
2-16
4. TIRE & WHEEL ASSEMBLY
1) REMOVAL
(1) DRIVE TIRE & WHEEL ASSEMBLY
Η Lift up the frame
ö Lift up until the tire clear off the
ground.
Jack up
Wood block
BRP7RE18
Wheel nut
BRP7RE33
Jack up
Block Block
BRP7RE37
2-17
2) INSTALLATION
Installation is in the reverse order to removal,
but be careful of the following points.
(1) Drive wheel nuts
ÂTightening torque : 13.5~15.5kgfÂm
(98~112lbfÂft)
Wheel nut
BRP7RE34
Block Block
BRP7RE43
2-18