Summary
Investigation Report:
Isolated and grounding position to the other feeder that not included in the Online PD Test and
proper LOTO is applied.
It identify where the PD measurement position will position the Acoustic emission sensor for PD
measurement. See Fig.01
First step is energized only the bus bar and Isolate the disconnector and CB of H003A Line 1,2
and 3 and conduct the PD measurement. The vibration sound like is not present in this
measurement. See test results on Fig.02
Second step is closing the disconnector and CB of H003A Line 1,2 and 3 and conduct the PD
measurement. The vibration sound like was heard after closing the CB. See test results on
Fig.03
Recommendations:
Try to bypass first the secondary side of the CT and observe if the vibration sound like will
disappear.
Need to open the cable compartment of H003 Line 2 and Line 3 to investigate the contact
assemblies or electric shield.
BB Line 2 H003A