Appendix 3 - Cost Breakdown
Appendix 3 - Cost Breakdown
Principal Investigator SALARIES, The research team PI and Co-Investigator will 6000.00
Co-Principal Investigator STIPENDS AND be engaged in dismantling, documenting,
Co-Investigators SCHOLARSHIPS developing guideline and supervising and
statistical analysis and data interpretation or
period of 8 months
1. Principal Investigator
(120 hrs. (@20 OMR/hrs.):2400 OMR
2. Co-Principal Investigator 1
(25 hrs. (@20 OMR/hrs.):500 OMR
3. Co-Principal Investigator 2
(25 hrs. (@20 OMR/hrs.):500 OMR
4. Co-Principal Investigator 3
(40 hrs. (@20 OMR/hrs.):800 OMR
5. Co-Investigator 1
(60 hrs. (@18 OMR/hrs.):1080 OMR
6. Co-Investigator 2
(40 hrs. (@18 OMR/hrs.):720 OMR)
Master’s Students SALARIES, Three master’s students who are currently 10,600.00
Undergraduate STIPENDS AND doing their Master in Environmental
SCHOLARSHIPS Engineering will be working on the project
during their second year. 10 students from
Sohar University and /or other HEIS in Oman
will be engaged in survey data collection and
project activities within the duration of the
project. (2 OMR/hr)
(3 Students (Master in Environmental
Engineering)
(Omani Nationals)
(1800 hrs@2 OMR/hr)
10 students Sohar University and /or other
HEIS in Oman
(350 hrs@2 OMR/hr)
Purchases EQUIPMENT AND Questionnaire designing, printing and 3000.00
FACILITIES translation cost Three different survey
questionnaire Statistical software Software’s
will be procured for data visualization and
modelling, data preparation, statistical
analysis and predictive analysis. Addition
studies will be also conducted on WEEE
waste management software’s.
(3 Survey Questioners:
design and validation
800 OMR
SmartPls Enterprise package. SPSS:
1600 OMR
reVESTED
:600 OMR)
Operation and Operation and 2-Specialized Technician and support staff 6000.00
Maintenance costs maintenance costs which are a will be employed to conduct
dismantling of the sample WEEE which will be
documented and recorded (Estimated
workhours 240 hrs.) as SOP for dismantling of
the WEEE.
(1-Electricical Sr. Technician 2400 OMR
1-Mechanical Sr Technician:2400 OMR
1- Chemical Technician: 1200 OMR )
Project-related travels TRAVEL AND The households and commercial entities in 23000.00
Fields work CONSULTATION the eight governatte and their respective
Wilayat will be will be surveyed to generate
realistic data during the span of the project.
This requires travel of the project team to
these locations to collect realistic and
meaningful data.
Al Batinah: 1400 OMR
Al Buraimi: 700 OMR
Ad Dakhliyah 2400 OMR
Al Wusta: 3800 OMR
Muscat:2000 OMR
Musandam: 4800
Ash Sharqiyah: 3600
Dhofar: 5200 OMR
Other ADMINISTRATIVE These will be required to cover up for the 2,000.00
COST administrative cost printing, consultation,
hospitality etc. during the complete phase of
the project.
a. Two full time support staff for assistance
and up keeping the project facilities for a
period of 6 months. 720 OMR
b. External Composition analysis.500 OMR
c. Licensing fees :300 PMR
d. Equipment and tool repairs and
maintenance.
e. Hospitality charges: 300 OMR
f. Selected WEE generating importers,
household representative’s workshop
administrative charges. 600 OMR
Budget Summary
Year 1 Total
Salaries and Stipends 16600.00 16600.00
Equipment and facilities 6000.00 6000.00
Travel and consultation 26000.00 26000.00
Administrative costs 2000.00 2000.00
Total 50600.00 50600.00
Appendix 3.a1 Survey Cost Breakdown
Amount
Sample Surveys
Region Population OMR
Household Commercial Industries Total
Ad Dakhliyah 186081 4608
Wilayat Nizwa 46121 384
Wilayat Bahla 36053 384
Wilayat Manah 9477 384
Wilayat Al Hamra 12486 384
Wilayat Adam 9893 384
Wilayat Izki 24030 384 384 50 5042 2400.00
Wilayat Samail 32704 384
Wilayat Bidbid 15317 384
Adh Dhahirah 82786 384
Wilayat Ibri 62336 384
Wilayat Yanqul 10715 384
Wilayat Dank 9735 384
Appendix 3.b Dismantling Cost Breakdown