PTO - Demolition of Site Establishment

CHECKPOINTS CHECK

1. Proper methodology determined?


2. Required PPE: hard hat, safety boots, PVC/leather gloves, ear protection, eye/face protection &
harnesses (when req)?
3. Safe scaffolding erected as per SANS 10085 code when required?

4. Services identified i.e. water, AC, electricity and required precautions taken?

5. Demolition area(s) suitably identified and demarcated?

6. Equipment and material properly moved and stacked safely?

7. Demolition equipment being used in good condition?

8. Plant being used – safe and trained operators etc?

9. Demolition being conducted as per method statement and risk assessment?

OK All in order.
X A fault was found.
N/A Not applicable.

Person(s) Being Observed

Comments

Recommendations

Worker(s): Sign Date

Observer: Sign Date