PTO - Erection/Dismantling of Formwork Shutters

CHECKPOINTS CHECK

1. Formwork supervisor appointed?


2. PPE for workers: hard hat, overalls, leather gloves, safety boots, harnesses (when required)?

3. Solid foundation for shutters?

4. Shutters erected in accordance with design/sketch etc?

5. Working at heights not to be a problem (Vertigo) – medical fitness or questionnaire completed?

6. Props plumb, aligned and spaced correctly?

7. Suitable signage displayed when erection taking place – exposure limited to other workers?

8. Any overloading on decks etc?

9. Formwork signed off as safe?

10. Stripping authorized and required signage in place – area cordoned off?

11. Safe stripping techniques being used?

12. All material safety stacked etc?

OK All in order.
X A fault was found.
N/A Not applicable.

Person(s) Being Observed

Comments

Recommendations

Worker(s): Sign Date

Observer: Sign Date