Chain Rule

1) If 35 men can finish a piece of a day; in how many days will 16


work in 8 days then the number of pumps raise 1736 tonnes of water
men who can do the same work in 10 working 9 hours a day?
days is
a) 6
a) 38 b) 7
b) 28 c) 8
c) 19 d) 9
d) 17

6) 21 binders can bind 1400 books in


2) If 40 men working 12 hours a day 15 days. How many binders will be
can complete a work in 8 days, then required to bind 800 books in 20
how many men working 4 hours a days?
day can complete the same work in
a) 7
16 days ?
b) 9
a) 50 c) 12
b) 60 d) 14
c) 54
d) 45
7) Running at the same constant rate,
6 identical machines can produce a
3) In a dairy farm 40 cow eat 40 bags total of 270 bottles per minute. At
of husk in 40 days. In how many days this rate, how many bottles could 10
one cow will eat one bag of husk? such machines produce in 4 minutes?
a) 1 a) 648
1
b) 40 b) 1800
c) 2700
c) 40 d) 10800
d) 80
8) 39 persons can repair a road in 12
days, working 5 hours a day. In how
4) 5 person can prepare an many days will 30 persons, working 6
admission list in 8 days working 7 hours a day, complete the work?
hours a day. If two persons join them a) 10
so as to complete the work in 4 days b) 13
they need to work per day for c) 14
d) 15
a) 8 hours
b) 9 hours 9) A man completes of a job in 10
c) 10 hours days. At this rate, how many more
d) 12 hours days will it takes him to finish the
job?
a) 5
5) If 18 pumps can raise 2170 tonnes b) 6
of water in 10 days, working 7 hours c) 7
Chain Rule
d) 7 2
1
a) 25
b) 50
c) 75
10) If 7 spiders make 7 webs in 7 d) Cannot be determined
days, then 1 spider will make 1 web
in how many days?
a) 1
b) 7
7
c) 2
d) 49

11) An industrial loom weaves 0.128


metres of cloth every second.
Approximately, how many seconds
will it take for the loom to weave 25
metres of cloth?
a) 178
b) 195
c) 204
d) 488

12) 36 men can complete a piece of


work in 18 days. In how many days
will 27 men complete the same work?
a) 12
b) 18
c) 22
d) 24
e) None of these

13) 4 mat-weavers can weave 4 mats


in 4 days. At the same rate, how many
mats would be woven by 8 mat-
weavers in 8 days?
a) 4
b) 8
c) 12
d) 16

14) A contract under took a work to


complete in 60 days but just after 20
days we observe that only 1/5th of
the project had been completed. To
complete the work in time, minimum
how many workers he had to
increase, if there were initially 75
workers deployed for the task?