You are on page 1of 6

CERTIFICATE OF PRODUCT CONFORMITY

Concrete Production and Delivery Facilities


Dubai Central Laboratory Department (DCLD) of Dubai Municipality
hereby attests that:
GOLDEN READY MIX LLC - Plant #1 (Mixer 1 and 2), #2 and #3
P.O. Box 171929, Jebel Ali Industrial Area 2, Dubai, UAE

(with production and delivery facilities as given in the attached Scope of Certification)

has been assessed and found in conformity with the requirements of Dubai Municipality Standard Specifications
DMS 026 "Technical Requirements for the Operation of Ready Mixed Concrete Plants" and the relevant Specific Rules.

Accordingly, DCLD hereby authorizes the above company to use the DCL Conformity Mark
to indicate conformance with the requirements of the certification scheme.

for / ENGR. AMIN AHMED AMIN


Director, Dubai Central Laboratory Department
Dubai Municipality

Certificate No: CL16020340 Current Issue Date: 05/11/2021


Valid Until: 04/11/2022 Original Issue Date: 07/03/2016

The attached Scope of Certification bearing the same Certificate Number forms an integral part of this Certificate.
This Certificate is an electronic document subject to the Terms and Conditions of the Product Certification System and shall not be reproduced except in full.

DM-DCLD-F-IC-2050 Rev 11
DUBAI CENTRAL LABORATORY DEPARTMENT
CONCRETE PRODUCTION AND DELIVERY CERTIFICATION SCHEME
SCOPE OF CERTIFICATION
FOR CERTIFICATE NO. CL16020340

Certificate Issued To: GOLDEN READYMIX LLC – Plant #1 (Mixer 1 & 2),
#2 & #3 ,
P.O. Box 171929, Jebel Ali Industrial Area 2, Dubai,
UAE
Applicable Standard Specification: DMS 026 – Technical Requirements for the Operation
of Ready Mix Concrete Plants
Applicable Specific Rules: RD-DP21-2177 (IC) - Specific Rules for Certification of
Ready-Mixed Concrete Plants in Accordance with
Administrative Decision (316) 2012 and DMS 026.
RD-DP21-2086 (IC) – Factory Production Control
System for Ready-Mixed Concrete Plants and CBUs

SCOPE: This Certificate indicates that the plant implements a quality management system and
has the appropriate production and delivery facilities (as mentioned below) capable of
producing concrete according to the required specifications. Conformance of the final
product with the agreed concrete specifications shall be verified according to the usual
inspection methods and as agreed between the plant and its customer.

CERTIFIED BATCHING PLANTS

As required by the certification scheme, the plants listed below are central mixing with automatic
batching of concrete components including cementitious materials, aggregates, water and admixtures:

S/N Plant Identification Plant Details


Readymix Concrete
1 Manufacturer: LINTEC
Batching Plant #1
Control System: LINTRONICS
(Mixer 1 & 2)

2 Readymix Concrete Manufacturer: SIMEM


Batching Plant #2 Control System: GPE

3 Readymix Concrete Manufacturer: LINTEC


Batching Plant #3 Control System: LINTRONICS

Page 1 of 5 DM-DCLD-F-IC-2051 R8
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
OPEN DATA / ‫بيانات مفتوحة‬
CERTIFIED CONCRETE TRUCKS

Sr No. Truck No. Plate No. Manufacturer


1 31 A 87425 GORICA
2 33 G 48233 GORICA
3 34 H 80133 GORICA
4 35 G 52803 GORICA
5 36 H 19828 GORICA
6 37 H 16481 GORICA
7 38 H 80134 GORICA
8 39 H 80135 GORICA
9 41 A 92743 GORICA
10 42 G 51628 GORICA
11 45 G 54510 GORICA
12 46 H 19661 GORICA
13 48 G 54740 GORICA
14 49 A 91590 GORICA
15 50 A 92447 GORICA
16 51 Q 47956 GORICA
17 52 H 17980 GORICA
18 53 H 18061 GORICA
19 55 R 16462 GORICA
20 56 A 91896 GORICA
21 57 G 53110 GORICA

Page 2 of 5 DM-DCLD-F-IC-2051 R8
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
OPEN DATA / ‫بيانات مفتوحة‬
22 58 A 92978 GORICA
23 60 H 17951 GORICA
24 61 B 99721 GORICA
25 62 C 23365 GORICA
26 63 B 95015 GORICA
27 64 A 88483 GORICA
28 65 B 92461 GORICA
29 66 B 92815 GORICA
30 67 C 26693 GORICA
31 68 C 17062 GORICA
32 69 B 97230 GORICA
33 70 C 11783 GORICA
34 71 B 95438 GORICA
35 72 O 34417 GORICA
36 73 C 24203 GORICA
37 75 C 13508 GORICA
38 76 I 81384 GORICA
39 77 B 98792 GORICA
40 78 I 81346 GORICA
41 79 P 16835 GORICA
42 80 I 81343 GORICA

Page 3 of 5 DM-DCLD-F-IC-2051 R8
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
OPEN DATA / ‫بيانات مفتوحة‬
43 81 B 98083 GORICA
44 82 C 15460 GORICA
45 83 C 15049 GORICA
46 84 I 81380 GORICA
47 85 I 81379 GORICA
48 86 B 99581 GORICA
49 87 I 81341 GORICA
50 89 G 12559 GORICA
51 90 I 81342 GORICA
52 92 S 89554 GORICA
53 93 S 92516 GORICA
54 95 S 92536 GORICA
55 96 S 92537 GORICA
56 97 S 92538 GORICA
57 98 M 43911 GORICA
58 99 M 43903 GORICA
59 100 M 43916 GORICA
60 101 M 43910 GORICA
61 102 M 43912 GORICA
62 103 I 91799 SANY
63 104 I 94577 SANY

Page 4 of 5 DM-DCLD-F-IC-2051 R8
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
OPEN DATA / ‫بيانات مفتوحة‬
64 105 F 78860 SANY
65 106 F 78147 SANY
66 107 C 16077 CIFA
67 108 C 23564 CIFA
68 109 C 33026 CIFA
69 110 C 38532 CIFA
70 111 C 48599 CIFA

NOTE 1: This document forms part of the Certificate of Conformity bearing the same certificate number.
NOTE 2: The above certified batching plants and delivery trucks shall be identified by the DCL Conformity Mark

Original Issue Date : 07 March 2016


Current Issue Date : 05 Nov 2021
Valid Until : 04 Nov 2022

ARIF HUSAIN AL MARZOOQI


Products Conformity Assessment Section Manager
Dubai Central Laboratory Department

Page 5 of 5 DM-DCLD-F-IC-2051 R8
P.O. Box 67, DCL, Zabeel Road, Karama, Dubai, UAE
OPEN DATA / ‫بيانات مفتوحة‬

You might also like