You are on page 1of 5

1st Reviewer

N Reviewer Comment Author Feedback


o
1 The aim of the research could be more Has been refined in writing, so that it is
accurate: "This research aims to analyze the more accurate in research purposes with
cost of improvement work based on GB "This study aims to analyze the cost of
assessment is an influencing factor in the improvement works based on the GB
application of the regulation from the assessment, where those improvement
Minister of Public Works...". works are factors that influence the
implementation of regulations by the
Indonesian government's Minister of Public
Works and Public Housing (PUPR)", This
sentences has been refined in paper.
2 improvement work - maybe "upgrading with Please more explained " upgrading with
RES" RES" meaning.

But, for improvement work on this research


is applying Blockchain-BIM to increase the
cost performance of Green building in
modern shopping centre buildings. The
improvement work item on the research
explained on table 8.
3 The influencing factor could be separated It can be explained that there is a
from the aim significant correlation between the results
of the SEM-PLS test on the factors that
influence the components of the cost of
repairing green buildings. Influential
factors on table 7, item number 1, 2, 3, 4, 8
and 10 are very closely related to the repair
cost components in table 8, item number 2,
3, 4, 5, 6, 10, 12 and 13. This shows that
there is a similarity in the results between
statistical test and implementation of the
case studies in this study. So, the influential
factors need to be mentioned in the
purpose of this study.
4 Some of the criteria, e.g. WWR in Table 1, are There was a typo error, when setting the
not fully clear. Is it a ratio of quantities or table width, so the unit size was lost.
areas? It would be better to provide Regulation from the Minister of Public
measurements on each criterion where Works and Public Housing (PUPR)
possible Indonesian governance requires that the
size of the total area of windows in a
building relative to the total area of the
N Reviewer Comment Author Feedback
o
exterior walls is around 30%. This WWR unit
has been refined in paper.
5 In the conclusion is stated, "In this study, In the same paragraph, it has been
researchers experience difficulty to start explained that in the future, studies need
making smart application contracts on the to be done and work the same with
Blockchain network because of the limitations practitioners in Blockchain so that this
will affect researcher technology. Researchers method can be easily assembled and
have several times experienced failure in applied. This can be interpreted such as
making applications based on "collaboration in creating network
Blockchains." However, it's not entirely clear, configurations with Blockchain
what kind of future research is proposed. Just practitioners to simplify simulation". And
mentioning failure this sentences has been added on paper.
6 In the conclusion is stated, "The research It can be explained that research updates
novelty of this study depends on the are found when research is conducted.
contribution of a set strategy that combines Apart from Blockchain-BIM on the
Blockchain-BIM deep increase practice for GB application of green buildings that have
with renewable energy by the stakeholders.". never been done by previous researchers,
The research novelty should have been researcher conducted an investigation into
established before or during the the selection of renewable energy
investigation, but the conclusion seems to technologies in the implementation of
describe only the factors influencing apparent green buildings where case studies were
research novelty. applied, this can be categorized as research
development, which is not commonly use
by previous research. Researchers provide
choices in the application of renewable
energy, so that it can meet the green
building criteria by the government, and
the required cost options. Some sentence
sentences has been added on paper.
7 I missed a clearer analysis of the importance This study uses BIM 5D, so the limitations
and impact of the BIM model and its needed for research are following the
information requirements (BIM attributes) on method of research implementation on
the quality of the research and the definition the Blockchain-BIM network as described in
of boundary conditions. The quality of a BIM Figure 5, while for the application approach
model and the variety of information it of the Blockchain network itself using the
contains can be very diverse, but approach of Figure 4. The blockchain
unfortunately, this is not the focus of this network is significant tool in this research
study because the output as a green building
cost improvement.
8 I lacked clarity as to why BIM, which is In addition to accurate 5 dimensional
announced in the title, is needed at all in this modeling, BIM has features that support
case. Perhaps typical CAD drawings and quantity take-off (QTO) and cost
N Reviewer Comment Author Feedback
o
textual information would have been information, and are different from existing
sufficient to convey the necessary data and CAD drawings. This is the main ingredient
even to use Blockchain technology for smart in the practice of improving the cost of
contracting. implementing green buildings with
blockchain implementation. Because it is
the QTO data that will be included in the
Blockchain network on this research. In the
literature review, the advantages of BIM
have been mentioned, where it is more
relevant for commercial and public sub-
sectors as it increases construction
productivity (Olanrewaju et al., 2020).
9 There are some editorial mistakes: The researcher has carried out refining a
A. kilowatts - kW written, numbering and for editorial unit
errors has been updated in the revised
paper.

A. Some of writing mistake editorial already


changed follow International Standard.

B. Table 2, numbering

B. It seems like when the editor omitted the


information about Author, the layout
configuration is change. But, for paper R1
already changed, which allows
configuration according to the original
paper.

2nd Reviewer

N Reviewer Comment Author Feedback


o
1 The reviewed paper is relevant and the Noted. Researchers chose to use SEM-PLS
analysis of the cost of improvement work because this program is suitable for analysing
based on the evaluation of green building multi-variables in this study which reached
(GB) is an influencing factor in the 304 variables.
application of the regulation of the
Indonesian Minister of Public Works and
Public Housing (PUPR). As a research
methodology, the Structural Equation
N Reviewer Comment Author Feedback
o
Modelling – Partial Least Square (SEM-PLS)
method was used.
2 The reference article mainly uses new According some of reference not include yet
literature sources (2018-2023), with the on the bibliography, because the reference is
exception of a few older sources (2010, in the image frame which results in not being
2014) that are relevant for the study. I linked to the Mendeley application. For those
believe that the literature listed in Figure 3 references mention as below :
should also have clear links to the - Convergen Validity : Hair, J. F., Jr., R. E.
reference. The sources of literature (Hair, Anderson, R. L. Tatham, and W. C. Black
1998; Wong KK, 2013; Sarstedt et al., 2017; (1998). Multivariate Data Analysis with
Hair, 2013; Ghozali, 2012; Ghozali, 2017) Readings, 5th Edition. Englewood Cliffs, NJ:
are not included in the reference list. The Prentice Hall.
same uncertainty remains in Figure 5 (Ni et - Average Variance Extracted : Wong, K.K.
al., 2021). (2013) Partial Least Squares Structural
Equation Modeling (PLS-SEM) Techniques
Using SmartPLS. Marketing Bulletin, 24, 1-
32. Sarstedt, M., Hair, J., & Ringle, C. M.
2017. Partial Least Squares Structural
Equation Modeling,
https://www.researchgate.net/publication/3
19669432_Partial_Least_Squares_Structural_
Equatio_Modeling. DOI:10.1007/978-3-319-
05542-8_15-1
- Conbrach Alpha&Composite Reability :
Hair, J.F., Hult, G.T.M., Ringle, C.M., Sarstedt,
M., 2013. A Primer on Partial Least Squares
Structural Equation Modeling (PLS-SEM).
Sage, Thousand Oaks
- Path Cooffisien : Ghozali, I. (2017).
Structural Equation Modeling, Metode
Alternatif dengan Partial Least Square
(PLS). 4th Edition. Semarang: Diponegoro
University Publishing Agency.
- T-Statistik dan P-Value : Ghozali, I. Latan, H.
2012. Partial Least Square : Konsep, Teknik
dan Aplikasi Smart PLS 2.0 M3. Semarang:
Diponegoro University Publishing Agency.
- Blockchain BIM Network (Figure 5 ) : Ni, Y.,
Sun, B., Wang, Y., & et al. (2021). Blockchain-
Based BIM Digital Project Management
Mechanism Research. IEEE Access, 9,
161342–161351.
N Reviewer Comment Author Feedback
o
https://doi.org/10.1109/ACCESS.2021.313027

All reference above already add on


bibliography list.
3 Describing the methodology, the authors It can be explained that the purpose of
write: 'Figure 3 is the research flow used in previous research is research conducted by
this study, with reference to previous Hair (Test Validation and Test Reability), Wong
research for SEM-PLS tested'. It is not clear KK and Sarstedt (Average Variance Extracted),
to which previous SEM-PLS test this article Ghozali (T-Statistics and P-Value), which is
refers. mentioned in chart figure 3, in their research
mentioned about testing techniques with SEM
PLS, with test value criteria.
4 In Table 7 of the article, it is not clear what There was an error in writing or typo, while
the difference is between the last three setting the table width, so that the items that
columns of the table. should be there were missing from the
correspondence in table 7 (Table 8 revised
version). The author has fixed this error.
5 Conclusions are written in more the form Researchers have added information in the
of considerations than in evaluating the conclusion, that there is a significant
results obtained using the Structural relationship between the results of the SEM-
Equation Modeling – Partial Least Square PLS testing and the green building
(SEM-PLS) method. assessment result items. Which means that
there is a close relationship between the
influential factors and the green building
improvement work items. Where there are
similarities between the influential factors and
the repair work carried out.
6 The article is of practical significance and Noted.
shows that new technologies provide This research is the latest to take guidance
opportunities to achieve sustainable from the latest Indonesian government
solutions that are in accordance with regulations for green buildings. Based on
national requirements research results, that Blockchain-BIM is able
to improve the cost performance of green
buildings.