This study aims to analyze the cost of improvement works for green buildings in Indonesia based on factors that influence the implementation of government regulations. The author conducted case studies and statistical analysis and found correlations between influential factors and cost components. There were limitations in applying the Blockchain and BIM modeling approach. Based on reviewer feedback, the author refined descriptions of the research aim, methodology, and conclusions to provide more clarity. Editorial errors in the paper were also addressed.
This study aims to analyze the cost of improvement works for green buildings in Indonesia based on factors that influence the implementation of government regulations. The author conducted case studies and statistical analysis and found correlations between influential factors and cost components. There were limitations in applying the Blockchain and BIM modeling approach. Based on reviewer feedback, the author refined descriptions of the research aim, methodology, and conclusions to provide more clarity. Editorial errors in the paper were also addressed.
This study aims to analyze the cost of improvement works for green buildings in Indonesia based on factors that influence the implementation of government regulations. The author conducted case studies and statistical analysis and found correlations between influential factors and cost components. There were limitations in applying the Blockchain and BIM modeling approach. Based on reviewer feedback, the author refined descriptions of the research aim, methodology, and conclusions to provide more clarity. Editorial errors in the paper were also addressed.
o 1 The aim of the research could be more Has been refined in writing, so that it is accurate: "This research aims to analyze the more accurate in research purposes with cost of improvement work based on GB "This study aims to analyze the cost of assessment is an influencing factor in the improvement works based on the GB application of the regulation from the assessment, where those improvement Minister of Public Works...". works are factors that influence the implementation of regulations by the Indonesian government's Minister of Public Works and Public Housing (PUPR)", This sentences has been refined in paper. 2 improvement work - maybe "upgrading with Please more explained " upgrading with RES" RES" meaning.
But, for improvement work on this research
is applying Blockchain-BIM to increase the cost performance of Green building in modern shopping centre buildings. The improvement work item on the research explained on table 8. 3 The influencing factor could be separated It can be explained that there is a from the aim significant correlation between the results of the SEM-PLS test on the factors that influence the components of the cost of repairing green buildings. Influential factors on table 7, item number 1, 2, 3, 4, 8 and 10 are very closely related to the repair cost components in table 8, item number 2, 3, 4, 5, 6, 10, 12 and 13. This shows that there is a similarity in the results between statistical test and implementation of the case studies in this study. So, the influential factors need to be mentioned in the purpose of this study. 4 Some of the criteria, e.g. WWR in Table 1, are There was a typo error, when setting the not fully clear. Is it a ratio of quantities or table width, so the unit size was lost. areas? It would be better to provide Regulation from the Minister of Public measurements on each criterion where Works and Public Housing (PUPR) possible Indonesian governance requires that the size of the total area of windows in a building relative to the total area of the N Reviewer Comment Author Feedback o exterior walls is around 30%. This WWR unit has been refined in paper. 5 In the conclusion is stated, "In this study, In the same paragraph, it has been researchers experience difficulty to start explained that in the future, studies need making smart application contracts on the to be done and work the same with Blockchain network because of the limitations practitioners in Blockchain so that this will affect researcher technology. Researchers method can be easily assembled and have several times experienced failure in applied. This can be interpreted such as making applications based on "collaboration in creating network Blockchains." However, it's not entirely clear, configurations with Blockchain what kind of future research is proposed. Just practitioners to simplify simulation". And mentioning failure this sentences has been added on paper. 6 In the conclusion is stated, "The research It can be explained that research updates novelty of this study depends on the are found when research is conducted. contribution of a set strategy that combines Apart from Blockchain-BIM on the Blockchain-BIM deep increase practice for GB application of green buildings that have with renewable energy by the stakeholders.". never been done by previous researchers, The research novelty should have been researcher conducted an investigation into established before or during the the selection of renewable energy investigation, but the conclusion seems to technologies in the implementation of describe only the factors influencing apparent green buildings where case studies were research novelty. applied, this can be categorized as research development, which is not commonly use by previous research. Researchers provide choices in the application of renewable energy, so that it can meet the green building criteria by the government, and the required cost options. Some sentence sentences has been added on paper. 7 I missed a clearer analysis of the importance This study uses BIM 5D, so the limitations and impact of the BIM model and its needed for research are following the information requirements (BIM attributes) on method of research implementation on the quality of the research and the definition the Blockchain-BIM network as described in of boundary conditions. The quality of a BIM Figure 5, while for the application approach model and the variety of information it of the Blockchain network itself using the contains can be very diverse, but approach of Figure 4. The blockchain unfortunately, this is not the focus of this network is significant tool in this research study because the output as a green building cost improvement. 8 I lacked clarity as to why BIM, which is In addition to accurate 5 dimensional announced in the title, is needed at all in this modeling, BIM has features that support case. Perhaps typical CAD drawings and quantity take-off (QTO) and cost N Reviewer Comment Author Feedback o textual information would have been information, and are different from existing sufficient to convey the necessary data and CAD drawings. This is the main ingredient even to use Blockchain technology for smart in the practice of improving the cost of contracting. implementing green buildings with blockchain implementation. Because it is the QTO data that will be included in the Blockchain network on this research. In the literature review, the advantages of BIM have been mentioned, where it is more relevant for commercial and public sub- sectors as it increases construction productivity (Olanrewaju et al., 2020). 9 There are some editorial mistakes: The researcher has carried out refining a A. kilowatts - kW written, numbering and for editorial unit errors has been updated in the revised paper.
A. Some of writing mistake editorial already
changed follow International Standard.
B. Table 2, numbering
B. It seems like when the editor omitted the
information about Author, the layout configuration is change. But, for paper R1 already changed, which allows configuration according to the original paper.
2nd Reviewer
N Reviewer Comment Author Feedback
o 1 The reviewed paper is relevant and the Noted. Researchers chose to use SEM-PLS analysis of the cost of improvement work because this program is suitable for analysing based on the evaluation of green building multi-variables in this study which reached (GB) is an influencing factor in the 304 variables. application of the regulation of the Indonesian Minister of Public Works and Public Housing (PUPR). As a research methodology, the Structural Equation N Reviewer Comment Author Feedback o Modelling – Partial Least Square (SEM-PLS) method was used. 2 The reference article mainly uses new According some of reference not include yet literature sources (2018-2023), with the on the bibliography, because the reference is exception of a few older sources (2010, in the image frame which results in not being 2014) that are relevant for the study. I linked to the Mendeley application. For those believe that the literature listed in Figure 3 references mention as below : should also have clear links to the - Convergen Validity : Hair, J. F., Jr., R. E. reference. The sources of literature (Hair, Anderson, R. L. Tatham, and W. C. Black 1998; Wong KK, 2013; Sarstedt et al., 2017; (1998). Multivariate Data Analysis with Hair, 2013; Ghozali, 2012; Ghozali, 2017) Readings, 5th Edition. Englewood Cliffs, NJ: are not included in the reference list. The Prentice Hall. same uncertainty remains in Figure 5 (Ni et - Average Variance Extracted : Wong, K.K. al., 2021). (2013) Partial Least Squares Structural Equation Modeling (PLS-SEM) Techniques Using SmartPLS. Marketing Bulletin, 24, 1- 32. Sarstedt, M., Hair, J., & Ringle, C. M. 2017. Partial Least Squares Structural Equation Modeling, https://www.researchgate.net/publication/3 19669432_Partial_Least_Squares_Structural_ Equatio_Modeling. DOI:10.1007/978-3-319- 05542-8_15-1 - Conbrach Alpha&Composite Reability : Hair, J.F., Hult, G.T.M., Ringle, C.M., Sarstedt, M., 2013. A Primer on Partial Least Squares Structural Equation Modeling (PLS-SEM). Sage, Thousand Oaks - Path Cooffisien : Ghozali, I. (2017). Structural Equation Modeling, Metode Alternatif dengan Partial Least Square (PLS). 4th Edition. Semarang: Diponegoro University Publishing Agency. - T-Statistik dan P-Value : Ghozali, I. Latan, H. 2012. Partial Least Square : Konsep, Teknik dan Aplikasi Smart PLS 2.0 M3. Semarang: Diponegoro University Publishing Agency. - Blockchain BIM Network (Figure 5 ) : Ni, Y., Sun, B., Wang, Y., & et al. (2021). Blockchain- Based BIM Digital Project Management Mechanism Research. IEEE Access, 9, 161342–161351. N Reviewer Comment Author Feedback o https://doi.org/10.1109/ACCESS.2021.313027
All reference above already add on
bibliography list. 3 Describing the methodology, the authors It can be explained that the purpose of write: 'Figure 3 is the research flow used in previous research is research conducted by this study, with reference to previous Hair (Test Validation and Test Reability), Wong research for SEM-PLS tested'. It is not clear KK and Sarstedt (Average Variance Extracted), to which previous SEM-PLS test this article Ghozali (T-Statistics and P-Value), which is refers. mentioned in chart figure 3, in their research mentioned about testing techniques with SEM PLS, with test value criteria. 4 In Table 7 of the article, it is not clear what There was an error in writing or typo, while the difference is between the last three setting the table width, so that the items that columns of the table. should be there were missing from the correspondence in table 7 (Table 8 revised version). The author has fixed this error. 5 Conclusions are written in more the form Researchers have added information in the of considerations than in evaluating the conclusion, that there is a significant results obtained using the Structural relationship between the results of the SEM- Equation Modeling – Partial Least Square PLS testing and the green building (SEM-PLS) method. assessment result items. Which means that there is a close relationship between the influential factors and the green building improvement work items. Where there are similarities between the influential factors and the repair work carried out. 6 The article is of practical significance and Noted. shows that new technologies provide This research is the latest to take guidance opportunities to achieve sustainable from the latest Indonesian government solutions that are in accordance with regulations for green buildings. Based on national requirements research results, that Blockchain-BIM is able to improve the cost performance of green buildings.