Professional Documents
Culture Documents
PALM TREE TO BE
TRANSPLANTED
CLIENT
PALM
GROUND COVERS
SCOPE OF WORK
CONSULTANTS
3:1
1.3%
1.2%
1.2%
1.2%
1.2%
1.2%
1.2%
1.2%
1.5% 1.5%
+4.30 +4.30 +4.30
1.7%
1.7%
1.7%
1.7%
1.7%
1.7%
4 P/PHOE.D5 11 G/AGAP.A
11 G/AGAP.A 10 GR/EQUI.H
5 G/AGAP.A
PLANTING SCHEDULE
SYMBOL BOTANICAL NAME SPACING
QTY
HEIGHT
PALMS
PHOE.D5 PHOENIX DACTYLIFERA AS SHOWN A DETAIL DESIGN SUBMISSION 06.08.20 CD MV
4
5.0M BROWN TRUNK HEIGHT
IR DESCRIPTION DATE CHK APP
GROUNDCOVERS
AGAP.A AGAPANTHUS AFRICANUS 6/m²
54
0.40-0.50M HEIGHT
PRELIMINARY DESIGN
GRASS
EQUI.H EQUISETUM HYEMALE 9/m² PROJECT
10
0.40-0.50M HEIGHT TANJA WATERFRONT
NOTES TANGIER,MOROCCO
DRAWING TO BE READ IN CONJUNCTION WITH THE
SPECIFICATION
DRAWING TITLE
ALL DIMENSIONS IN MILLIMETRES UNLESS OTHERWISE
STATED
ZONE A
DRAWING NOT TO BE SCALED
PLANTING PLAN
CONSTRUCTION BUILD UP TO ENGINEERS DETAIL AND
APPROVAL SHEET 1
FOR GENERAL NOTES, REFER TO DRAWING
10787.000-CLL-LSC-XRF-P103-SW-00-0001
DRAWING NUMBER
CLL-LSC-DWG-P103-SW-00-1801
PROJECT NUMBER SCALE SHEET SIZE REV
0 2500 5000 10000 15000 20000
10787.000 1:250 A1 A
SCALE 1:250 @ A1 © 2020 CRACKNELL, ALL RIGHTS RESERVED