Document with Specification of Requirements

APPRENTICE

Luis Angel Echeverry Ricardo

INSTRUCTOR

Sergio Ignacio Meneses Cudriz

National Learning Service SENA


Trade and Services Center
Virtual Mode
April 2022
Formulation of the Development Project
Software for Scheduling Medical Appointments
EPS COMPREHENSIVE HEALTH

Tech. Luis Angel Echeverry Ricardo

2470409

Technologist in Software Analysis and


Development
National Learning Service SENA
Barranquilla / Atlantic
April 2022
GENERAL INDEX
1. PROBLEM STATEMENT.................................. 4

2. JUSTIFICATION................................................. ................
4/5

3. GENERAL OBJECTIVE................................................ .............


5

4. SPECIFIC GOAL................................................ ......... 6

5. SCOPE................................................. .................................. 6

6. PROJECT BENEFICIARIES................................................... 7

7. IMPACT................................................. ..................................
7

8. RESTRICTIONS................................................ ............... 8/9


 TIME RESTRICTIONS.............................................. 8
 COST RESTRICTIONS.......................................... 8
 SCOPE RESTRICTIONS.............................................. 9

9. RISKS.............................................. .................................. 10

RESULTS................................................. .......................... eleven


PROBLEM STATEMENT

The non-profit EPS SALUD INTEGRAL, operated by


the Atlantic Government, has been providing
hospital care to low-income families for more than
3 years.
So that the quality of life of these people can
improve, the Hospital Center is increasingly
increasing the number of affiliated people. Due to
the large flow of patients, they have chosen to
obtain an appointment scheduling system that
allows them to improve the development of the
hospital center.

JUSTIFICATION

By launching the use of the Appointment


Scheduling System, the risk of loss of information
of people linked to the EPS will be reduced since
currently this information is handled manually and
there is a risk that information already registered
will possibly be duplicated, which is a problem. .
Currently the EPS Presta The health service
provider does not have an appointment
scheduling system, which presents several
difficulties:
 Duplication of information already registered.
 Delay in scheduling medical appointments.
 Crowd of People in the Billing Area.
 Loss of Information.

GENERAL OBJECTIVE

The Implementation of a Medical Appointment


Scheduling system would be a very useful tool,
both for the administrative staff of the EPS SALUD
INTEGRAL, and for the Patients Registered in said
EPS.
since it would keep control of the planning of
Medical Appointments and the data provided by
the Patients would be stored correctly and
securely.

In this way, productivity will improve since the


scheduling of medical appointments will be faster
and more effective. It will also reduce waiting time
congestion per consultation.

SPECIFIC GOAL

1. Expedite the scheduling of medical


appointments.

2. Manage medical appointments through patient


registration.

3. Manage Medical Prescription Consultation.

4. Manage Medical Prescriptions.

SCOPE

The Scope of this Project Has the Purpose of


Realizing the Software for Scheduling
Medical Appointments, Complying with the
Requirements Specified Above, To be Used
by the Administrators of the Hospital Center
and the Patients, taking into account the
objective, the purpose is to analyze and
develop a product that is of quality so that
the system meets the expectations for which
it is made.
PROJECT BENEFICIARIES

The Project Has Several Beneficiaries, we can say


that they are divided into two groups. On the one
hand, there are the administrators of the health
center, which includes Doctors, Billing Personnel,
among others.
On the other hand, there are those affiliated with
the Health Center, which include the elderly,
children, young people and low-income adults
who do not have the resources to be cared for in a
private EPS.

IMPACT

The Impact that is intended to be carried out


with this project is positive and positively
impacts both parties:

SOCIAL
The Social Impact that will be achieved with the
Implementation of this Project will greatly benefit
patients since by having a medical appointment
scheduling system they will not have the
obligation to go to the health center to schedule
their appointment since from their Houses can
schedule the appointment virtually.

ECONOMIC
The Economic Impact sought with the
Implementation of the Project seeks that patients
who do not have the financial resources to pay the
cost of transportation to travel in person to the
Health Center to schedule appointments do so in
the comfort of their homes. In this way, the
Quality of Life of Patients is being improved even
more.

RESTRICTIONS

TIME RESTRICTION
The estimated time to complete this project is 696
hours since during this time everything about the
software will be analyzed, programmed and
documented.

COST RESTRICTIONS
Costs vary depending on staff

PROGRAMMER................ 410 Hours - 5,000,000


ANALYST............................. 148 Hours - 3,800,000
DOCUMENTATION..............138 Hours - 3,700,000

RANGE RESTRICTION
At this point, several tools are needed to prepare
the project. This space includes the development
and management of the project.

MANAGEMENT AND DOCUMENTATION TOOLS

• Microsoft Office Professional 2016: office suite


for creating this document.

• Sumatra PDF: PDF file reader

• Draw.io: online tool for creating UML diagrams.

• ProjectGantt: online tool for managing project


development. Development tools

DEVELOPMENT TOOLS

• MySQL
• XAMPP
• SUBLIME TEXT
Web browsers used for testing and access to
the Software : Google Chrome, Mozilla Firefox
and Internet Explorer: access to the application.
RISKS

The Possible Risks that May Present in the Project.

1. LIMITATION ON QUALITY CONTROL.

2. INAPPROPRIATE PROJECT DESIGN.

3. WEAK PRODUCTION OF THE PROJECT.

4. ADD MORE STAFF TO A POINT OF THE


PROJECT.

5. BAD ESTIMATION OF THE PROJECT TIME.

6. INSUFFICIENT PROJECT RISK MANAGEMENT.

RESULTS
Upon completion of the development of this
project, it can be stated that all the
requirements raised from the beginning have
been included.
This makes the final product completely
functional, which does not imply that it
cannot and should be improved, since the
features to be implemented were limited by
the delivery times of a project of these
characteristics; however, the development of
this project was a success. and all the
requirements requested by the administrative
staff of the
EPS COMPREHENSIVE HEALTH.