You are on page 1of 6

RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order Curies :17 Ci Density : 2-4 Sheet No.
Cost Centre Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 10 OKTOBER 2023
Job Location SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : 4710000113 mA :- Screen - Front : 0.125 mm
Drawing No. S/N of Camera : D.6189 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 F / L SPU B HELIOS J1R W 3" S 40 0-4 1 ACC


REROUTE SANGA SANGA 4-8 1 ACC
RC 3 8 -0 1 ACC

2 J4R W 3" S 40 0-4 1 ACC


4-8 1 ACC
8-0 1 ACC

INTERPRETER AUTHORIZED INSPECTOR


LEGEND Total Weld 2 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 2 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 6 Shts Kaco hartono Dolly .M
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Harun . S Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1
RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order Curies :17 Ci Density : 2-4 Sheet No.
Cost Centre Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 10 OKTOBER 2023
Job Location SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : 4710000113 mA :- Screen - Front : 0.125 mm
Drawing No. S/N of Camera : D.6189 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 TRUNK LINE HELIOS J 12 W 6" S 40 0-7 1 ACC


REROUTE SANGA SANGA ADD 7 - 14 1 ACC
14 - 0 1 ACC

2 J 16 W 6" S 40 0-7 1 ACC


ADD 7 - 14 1 V ACC
14 - 0 1 ACC

3 J 19 W 6" S 40 0-7 1 ACC


ADD 7 - 14 1 ACC
14 - 0 1 ACC

4 J 21 W 6" S 40 0-7 1 ACC


ADD 7 - 14 1 ACC
14 - 0 1 ACC
INTERPRETER AUTHORIZED INSPECTOR
LEGEND Total Weld 4 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 4 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 12 Shts Kaco hartono Dolly .M
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Harun . S Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1
RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order Curies :17 Ci Density : 2-4 Sheet No.
Cost Centre Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 10 OKTOBER 2023
Job Location SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : 4710000113 mA :- Screen - Front : 0.125 mm
Drawing No. S/N of Camera : D.6189 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 TRUNK LINE HELIOS J4 W 6" S 40 0-7 1 ACC


REROUTE SANGA SANGA ADD 7 - 14 1 ACC
14 - 0 1 ACC

2 J6 W 6" S 40 0-7 1 V REPAIR Loc 2" - 3"


ADD 7 - 14 1 ACC
14 - 0 1 ACC

3 J8 W 6" S 40 0-7 1 ACC


ADD 7 - 14 1 ACC
14 - 0 1 ACC

4 J 10 W 6" S 40 0-7 1 ACC


ADD 7 - 14 1 ACC
14 - 0 1 ACC
INTERPRETER AUTHORIZED INSPECTOR
LEGEND Total Weld 4 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 3 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair 1 Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 12 Shts Kaco hartono Dolly .M
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Harun . S Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1
RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order Curies :17 Ci Density : 2-4 Sheet No.
Cost Centre Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 10 OKTOBER 2023
Job Location SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : 4710000113 mA :- Screen - Front : 0.125 mm
Drawing No. S/N of Camera : D.6189 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 GAS LINE HELIOS J4 W 4" S 40 0-5 1 ACC


REROUTE SANGA SANGA ADD 5 - 10 1 ACC
10 - 0 1 ACC

2 J6 W 4" S 40 0-5 1 ACC


ADD 5 - 10 1 ACC
10 - 0 1 ACC

3 J8 W 4" S 40 0-5 1 ACC


ADD 5 - 10 1 ACC
10 - 0 1 ACC

4 J 10 W 4" S 40 0-5 1 ACC


ADD 5 - 10 1 ACC
10 - 0 1 ACC
INTERPRETER AUTHORIZED INSPECTOR
LEGEND Total Weld 4 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 4 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 12 Shts Kaco hartono Dolly .M
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Harun . S Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1
RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order Curies :17 Ci Density : 2-4 Sheet No.
Cost Centre Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 10 OKTOBER 2023
Job Location SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : 4710000113 mA :- Screen - Front : 0.125 mm
Drawing No. S/N of Camera : D.6189 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 F / L LSE 1108 HELIOS J4 W 4" S 40 0-5 1 ACC


REROUTE SANGA SANGA ADD 5 - 10 1 ACC
10 - 0 1 ACC

2 J6 W 4" S 40 0-5 1 ACC


ADD 5 - 10 1 ACC
10 - 0 1 ACC

INTERPRETER AUTHORIZED INSPECTOR


LEGEND Total Weld 2 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 2 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 6 Shts Kaco hartono Dolly .M
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Harun . S Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1
RADIOGRAPHIC EXAMINATION REPORT

USER : PT. PERTAMINA Radiation Source : Ir. 192 SFD 0D Report No. : /SGA/PRI/RT/23
Work Order Curies :17 Ci Density : 2-4 Sheet No.
Cost Centre Focal Spot : 3 x 3 mm Penetrameter : ASTM 1A Date of Insp' : 10 OKTOBER 2023
Job Location SANGA SANGA Kvp :- Sensitivity : 2%
IPAS No. : 4710000113 mA :- Screen - Front : 0.125 mm
Drawing No. S/N of Camera : D.6189 Screen - Back : 0.125 mm
Procedure No. : PO /AE.MIG-OPS/29.1 S/N Survey Meter 24386 Technique : DWSI
Acceptance Criteria : API 1104 Expire Date : 20 NOVEMBER 2023 Material : Carbon Steel
Material Film Size RESULT
Weld WELD INDICATION
Welder Film 4" x 10 4" x 15"
No. IDENTIFICATION No.or REMARKS
Stamp Dia Thick. Position 14" x 17" ACC REPAIR
Part No. Por CP WH HB IC BT ISI ESI TI IF IP EP UC CR

1 F / L LSE 834 HELIOS J5 W 3" S 40 0-4 1 ACC


REROUTE SANGA SANGA ADD 4-8 1 ACC
8 -0 1 ACC

2 J6 W 3" S 40 0-4 1 ACC


ADD 4-8 1 ACC
8-0 1 ACC

INTERPRETER AUTHORIZED INSPECTOR


LEGEND Total Weld 2 Jts
- Por : Porosity - ESI : Elongated Slag Inclusion Total Accepted 2 Jts
- CP : Cluster Porosity - TI : Tungsten Inclusion Total Repair Jts
- WH : Worm Hole - IF : Incomplete Fusion Total Film 4" x 10" 6 Shts Kaco hartono Dolly .M
- HB : Hollow Bead - IP : Incomplete Penetration 4" x 15" Shts REVIEWED CLIENT REPRESENTATIVE
- IC : Internal Concavity - EP : Excessive Penetration 14" x 17" Shts
- BT : Burn Through - UC : Undercut PERSONNELS
- ISI : Isolated Slag Inclusion - CR : Crack Rad. Insp. LVL. II (AR) Kaco hartono
Rad. Oprt. LVL. I (OR) Harun . S Hadi S Frans E Ginting
FOR/SMR-AE.MIG/009 Rev.00 Tgl. Berlaku : 01/08/2019 Hal . 1 dari 1