You are on page 1of 3

INDIVIDUAL EVALUATION

PROJECT MANAGEMENT CONSULTANT (PMC) CSRRP


Position : Monev Specialist Junior 1

Assesment

Minimum General Adequacy for Experience in


Name Status
Score Qualification the project The Region Total Score Remarks
(30%) (60%) (10%)

MOHAMMAD IQBAL, ST. Proposed 70,00 30,00 60,00 10,00 100,00 Comply
Project Management Consultant (PMC) Central Sulawesi Rehabilitation and Reconstruction Project (CSRRP)

IDB - NSUP PROJECT

II. Non Key professional staff qualifications and competence for the assignment

Consultant Name : PT. Adhicipta Engineering Consultant JV. PT. Lenggogeni, PT. LPPSLH Konsultan

Adequacy for the project (education, training, and Experiece in regoin


experience in the specific sector, field, subject, and (knowledge of the local
so forth, relevant to the particular assignment) language, culture,
(Score 60 points) administrative system,
General Qualification General qualifications (general
education and training, length of experience, positions
Fluent in Weighted
held, previous assignments as team expert, experience Total Score Weight
NO POSITION NAME Experience English both Score
in developing countries, and so forth) [30] working experience with
SKA in Region of writing
strong technical roles
and
speaking.

R W S R W S R W S R W S R W S
% % % % %

I PROFESIONAL STAFF

NON KEY EXPERT

2 Monev Specialist Junior 1 MOHAMMAD IQBAL, ST. 1 30 0,30 4,42 60 0,60 1 0 0,00 1 5 0,05 1 5 0,05 1,00 8 8,000
Project Management Consultant (PMC) Central Sulawesi Rehabilitation and Reconstruction Project (CSRRP)

PT. Adhicipta Engineering Consultant JV. PT. Lenggogeni, PT. LPPSLH


PERUSAHAAN :
Konsultan

NON KEY EXPERT


1 POSITION: Monev Specialist Junior 1

NAME: MOHAMMAD IQBAL, ST.

EXPERIENCE IN REGIONAL AND


ADEQUACY FOR THE PROJECT (Score 60 points) Reference
LANGUAGE (Score 10 points)

GENERAL QUALIFICATION
Duration of Experience
(Score 30 points)
Having minimum 4 years working experience (as a Tenaga
Has a Certificate of Expertise (SKA) Ahli Utama strong Experience in
Ahli Madya (SKA) or equivalent to required qualification) with Fluent in English both of
technical roles in building or infrastructure construction and Region Available = 1
strong technical roles in designing, supervising or writing and speaking.
planning (Y=1;T=0) N/A = 0
No Name of Assignment Position Location Employer/Client construction for Buildings

Lingkup Pekerjaan Kesesuaian Posisi


Duration Bachelor Degree (S1) in Civil Score
Start End (sesuai=1;menunj (sesuai=1; tdk (Y=1;T=0) (Y=1;T=0) (vg ; g ; f)
(month) Engineering (month)
ang/terkait=0,5) sesuai=0,25)

1 1 34,00 1 1 g

PTAdhicipta / Dectorate of
Project Management Consultant (PMC), Central Sulawesi Rehabilitation and
Settlement Development- S-1 grade of Civil Engineering,
Reconstruction Project (CSRRP), Palu
1 Oct-20 Jul-23 34,00 Monev Housing Assistant Palu, Central Sulawesi Project Implementation Technique Faculty of Sintuwu Maroso 0
Unit, DGHS, Ministry of University, Poso, 2015.
Public Works and Housing

1 1 6,00

Houses Rehabilitation and Reconstruction of Post-Natural Disaster


Disaster Management
2 May-19 Oct-19 6,00 Technical Facilitator Palu, Central Sulawesi 1 1
Agency, Sigi Regency.

0,5 1 -4,00

Construction Management Consultancy Services (Planning and Supervision) in Earthquake and Tsunami
Temporary Residential Development (HUNTARA) Palu City, Donggala Regency, Disaster Management in
3 Nov-18 Mar-18 -8,00 Field Inspector 1
and Sigi Regency Central Sulawesi Province,
DitGen. Human Settlement

1 1 6,00
DAK Supervision of Road Building Activities.
Palu City, Donggala Regency, Public Works Agency of
4 May-18 Nov-18 6,00 Inspector 0
and Sigi Regency Palu City

1 1 5,00

Central Sulawesi Water


Rehabilitation of Sombe Lewara River Groundsill. Supply Network
5 Apr-17 Sep-17 5,00 Inspector Palu, Central Sulawesi Implementation Work Unit, 0
DGWR, Ministry of Public
Works and Public Housing

1 1 4,00

Supervision of the Development of Clean Water Supply System (Check Dam) of Regional Public Hospital of
6 Sep-16 Dec-16 4,00 Field Inspector Parigi City, Central Sulawesi 1
Anuntaloko Regional Hospital. Anuntaloko

1 1 2,00

Technical Planning for the Making of Sewer-bank and Road-bank of Tulandengi,


Sibatang and North Moutong Villages Parigi Moutong Regency, Public Works Agency of
7 Jan-16 Mar-16 2,00 Field Inspector 1
Central Sulawesi Parigi Moutong Regency

JUMLAH TOTAL 1,00 53 1 1 g

You might also like