1.International Experts
Yuichi NK Overall Project A.1 Overall Project Management Key Japanese Full-time M.Sc., 28.5 years by other
FUKASAKA management, Team Leader ・ Prepare plan of consulting service activities, supervise, Expert Agricultural
management monitor and assess the project activities according to the Economics:
infrastructure ・ Coordinate with PIO, PIUs and UEOs on project planning, Development
and ・ Assist PMU, DPCO, PIO, PIUs and UEOs to collect progress of Osaka
execution ・ Assist PMU to prepare request for disbursement and its Agriculture
Project activities
database Establishment
Compensation
compensation works
personnel
Katsufumi NK Management A.2 Implementation of Road and Bridge Subprojects Key Japanese Full-time M.Eng., 32.4 years by other
MATSUZAWA of road and Road and ・ Arrange and implement baseline and end-line surveys under Expert Faculty of Civil
subprojects, Engineer ・ Prepare definite planning and conduct detailed design (1972, Shinshu
planning, - Prepare scope of works for surveys (traffic count survey, Nagano
design, tender, investigation, subsoil investigation and material tests, etc.) Japan)
process
supervision
database
・ O&M guidance
and reports
sectors
Engineer of Upazila.
activities
Subprojects
subcontractor
Soichiro NK Management A.3-1 Implementation of Drainage, Flood Protection and Water Key Japanese Other B.Sc. Irrigation 27.4 year by other
YUMOTO of drainage Drainage/ Supply Subprojects (Similar manner as A.2) Expert and Drainage
and flood Flood ・ Arrange and implement baseline and end-line surveys under Engineering
protection Protection and coordination with IEE, EIA surveys (1977, Tokyo
subprojects, Water Supply ・ Prepare Definite planning and conduct Detailed design University of
・ O&M guidance
and reports
trainees for CD
activities
Sectors
M&E
manner as A.2)
Do Xuan NK Assessment of A.3-2 Implementation of Drainage and Flood Protection Non- Vietnamese Full-time Ph.D. Hydraulics 14.0 years by other
and
KHANH hydrology for Hydrological Subprojects (Same as A.3-1) Key Environmental
(2016,
drainage and Engineer ・ Preparation and implementation of the hydrological survey Expert Chungnam
National
flood activities University,
Korea)
protection ・ Prepare definite planning and conduct hydrological M.Sc., and B.Sc.
River and
subprojects assessment and detailed design underground
hydraulics
・ Assist replacement of subprojects with necessary assessment engineering
constructions
and reports, if necessary (M.Sc.: 2008,
B.Sc.: 2006,
・ Tasks assigned by PMU Saint Petersburg
State Polytechnic
Capacity Development in Drainage and Flood Protection University,
Russia)
Sectors (Same manner as A.3-1)
A.3-1)
Akio NK Management A.4 Implementation of Solid Waste Management Subprojects Key Japanese Full time M.Eng., Radio 22.9 years by other
ISHII of solid waste Solid Waste (Similar manner as A.2) Expert Engineering and
management Management ・ Arrange and implement baseline and end-line surveys under Operation
planning, - Prepare scope of works for necessary surveys (soil survey, National
detailed water quality survey, others same as A.2) and Assess the University,
O&M quantity, collection rate, waste collection quantity, waste (1992, University
development detailed cost estimates, iii) necessary documents, iv) OG, Japan)
SWM Operation
・ O&M guidance
and reports
Beneficiaries
activities
manner as A.2)
Hiroshi GOTO NK Management A.5 Implementation of Other Public Facilities and Training Key Japanese other M.Sc. Architect 35 years by other
of building and Architect Center (Building and Park Subprojects, etc.) Expert (1982,
park ・ Arrange and implement baseline and end-line surveys under Architectural
construction investigation and material tests, etc.) and Assess the B.Sc. Architect
・ O&M guidance
and reports
Sectors)
activities
manner as A.2)
Atsushi NK Management A.6 Implementation of Township Subprojects Key Japanese Full-time B.Sc. Faculty of 36 years by other
KISHI of township Township ・ Arrange and implement baseline and end-line surveys under Expert Agriculture,
supply Engineer ・ Prepare Definite planning and conduct Detailed design Engineering
detailed investigation and material tests, etc.) and Assess the (1978, Tokyo
and reports
activities
manner as A.2)
contract, Expert ・ Confirm necessary administrative process at LGD, LGED and (2019, Kyoto
draft contracts, organizations concerned for the private contracts required M.Sc., Institute
contract ・ Prepare contents of private contracts required for the (2009, University
trainees for CD of private contracts and prepare detailed plans (1999, Kyoto
of CD program University,
activities
Execution
manner as A.2)
Kei NK Preparation A.8 Operation Guideline (OG) Preparation, Approval and Non- Japanese Full-time M.A., 13.3 years by other
of Operation Expert ・ Prepare OG (Draft) of SCRDP at Paurashava and Upazila Expert Management and
reflect results ・ Periodic evaluation of LGIs’ activities with other relevant Peace, Costa
programs ・ ICT formulation and development for OG based M&E and Economics
activities
Junko NK Management A.9 Implementation of Environmental and Social Non- Japanese other M. Eng. 15.6 years by others
and social and Social ・ Update EMP as appropriate; incorporate necessary technical Expert Environment)
consideration Consideration specifications with design and contract documentation in (2000, Tokyo
Initial ・ Prepare/update of IEE, EIA, EMP and EMoP for the required Technology,
(IEE), Review Framework. The TOR of local firms is based on the B.Sc.,
Impact Act 1995, Environmental Conservation Rules 1997, and JICA Urban Sociology
Assessment Guidelines for Environmental and Social Consideration 2010 (1993, Osaka
evaluations documents
plans, if necessary
ARAP, if necessary
development projects
activities
2. National Experts
Mohammed NKB Project B.1 Overall Project Management Key Bangladeshi other M.Sc. Commerce 21 years by other
Hasan HAIDER Management Deputy Team ・ Prepare plan of consulting service activities, supervise, Expert Management
covering Leader monitor and assess the project activities according to the (1997, National
development, ・ Coordinate with PIO, PIUs and UEOs on project planning, Bangladesh
development, ・ Assist PMU, DPCO, PIO, PIUs and UEOs to collect progress College,
O&M of countermeasures, and advise them for improvement when B.Sc., Commerce
Project activities
database Establishment
Compensation
compensation works
personnel
Md. Imrul NKB Planning, B.2 Implementation of Road and Bridge Subprojects Key Bangladeshi other M.Sc., 23.2 years by other
construction Design ・ Arrange and implement baseline and end-line surveys under Engineering
capacity (Road) ・ Prepare definite planning and detailed design including University of
activities
(Same as A.2)
Mohammad NKB Planning, B.3 Implementation of Road and Bridge Subprojects Key Bangladeshi other MBA 16.6 years by other
Serajul ISLAM design, tender, Structural (Same as A.2) Expert (2010, Daffodil
construction Design ・ Arrange and implement baseline and end-line surveys under International
capacity (Bridge) ・ Prepare definite planning and detailed design including Dhaka,
(Same as A.2)
activities
subprojects
(Same as A.2)
Md. Delwar RPMC Planning, B.4 Implementation of Drainage and Flood Protection Key Bangladeshi other M.Tech. 23.2 years by other
AKHAND construction Design ・ Arrange and implement baseline and end-line surveys under (2004, Indian
capacity (Drainage/ ・ Prepare definite planning and detailed design including Technology,
protection sectors
activities
protection sectors
(Same as A.3-1)
Md. Zahangir RPMC Planning, B.5 Implementation of Water Supply Subprojects Non Bangladeshi other M.Sc. Civil 36.4 years by other
supervision, Design ・ Arrange and implement baseline and end-line surveys under Expert (2007, Dhaka
development (Water Supply) ・ Prepare definite planning and detailed design including Engineering and
activities
(Same as A.3-1)
Md. Shoriful NKB Planning, B.6 Implementation of Solid Waste Management Subprojects Key Bangladeshi other M.Sc., 12 years by other
MONDAL supervision, Management ・ Arrange and implement baseline and end-line surveys under Engineering,
subprojects ・ Assist private contracts for SWM (collection and final Civil &
subprojects Bangladesh)
A.4)
Aminul NKB Planning, B.7 Implementation of Solid Waste Management Subprojects Non Bangladeshi other B.Sc. 10 years by other
supervision, Treatment ・ Arrange and implement baseline and end-line surveys under Expert Engineering,
sector
activities
subprojects
Md. Mahadhe NKB Planning, B.8 Implementation of Township Subprojects (Same as A.6) Non Bangladeshi other M.Sc., 12.6 years by other
HASAN design, Township ・ Arrange and implement baseline and end-line surveys under Key Urban &
institutional Specialist ・ Prepare definite planning and detailed design including Planning/ City
sector Bangladesh)
activities
Abu Saleh Md. NKB Planning, B.9 Implementation of Solid Waste Management Subprojects Non Bangladeshi other B.Sc., 10 years by other
supervision, Facility ・ Arrange and implement baseline and end-line surveys under Expert Engineering,
development, (Solid Waste ・ Prepare definite planning and detailed design including Chittagong
sector
activities
subprojects
Rashedul NKB Definite B.10 Implementation of Township Subprojects (Same as A.6) Non- Bangladeshi Other B.Sc., 16 Years by other
ALAM planning, Landfill ・ Arrange and implement baseline and end-line surveys under Key Civil &
design, Specialist ・ Prepare definite planning and detailed design including Engineering,
(Same as A.6)
activities
Kushal ROY NKB Initial B.11 Implementation of Environmental and Social Non Bangladeshi Other M. Res. Global 10 years by other.
Examination and Social ・ Update EMP as appropriate; incorporate necessary technical Expert Change,
(IEE), Consideration specifications with design and contract documentation in (2007, University
Impact ・ Assist LGED and LGUs in preparation of IEE, EIA, EMP and United
(RAP), socio- plans and JICA Environmental Guidelines and to make Science
economic recommendations regarding any necessary amendments for its (2003, Khulna
research, and ・ Assist LGED and LGUs to implement the measures identified Bangladesh)
fields
persons
plans if necessary
ARAP
Mamun Ar NKB Initial B.12 Implementation of Environmental and Social Non- Bangladeshi other M.Sc., 26 years by other
RASHID Environmental Resettlement Considerations Activities (Same as A.9) Key Political Science
Examination Specialist ・ Update EMP as appropriate; incorporate necessary technical Expert (1996, National
Impact ・ Assist LGED and LGUs in preparation of IEE, EIA, EMP and
Assessment ARAP for the required subprojects in respective fields B.Sc. (Honours)
Resettlement ・ Assist LGED and LGUs to review the Contractor's (1995, National
(RAP), socio- plans and JICA Environmental Guidelines and to make Bangladesh)
research, and ・ Assist LGED and LGUs to implement the measures identified Diploma in
with scientific ・ Monitor the effectiveness or EMP and negative impact on Management,
analysis environment caused by the construction works and provide (2013, Dhaka
fields
persons
plans if necessary
ARAP
Md. Abdun RPMC Planning, B.13 Implementation Assistance for Procurement Activities Non- Bangladeshi other MBA (Finance), 43 years by other
NOOR preparation of Procurement ・ Assist PMU/LGED to procure equipment Key (2005, University
plan and Specialist ・ Assist to prepare construction and procurement plan, pre- Expert of Dhaka,
schedule for qualification document, and tender document for tender Bangladesh)
capacity ・ Assist evaluation of pre-qualification for all relevant fields/ B.Sc., Civil
in procurement ・ Assist tender evaluation for all relevant fields/ sectors (1976, Rajshahi
Professional
Engineers
Registration
Board
Md. Sadat RPMC Preparation B.14 Operation Guideline (OG) Preparation, Approval and Non Bangladeshi other MSc., 13.1 years by other
of Operation Specialist ・ Prepare OG (Draft) of SCRDP at Paurashava and Upazila Expert Management and
development ・ ICT formulation and development for OG based M&E and Regional
activities (2008,
Management)
(2014,
Jahangirnagar
University Savar,
Bangladesh)
Shabbir NKB Transportation B.15 Implementation of Road and Bridge Subprojects Non Bangladeshi other M.Sc., 10.2 years by other
Traffic Engineer ・ Arrange and implement baseline and end-line surveys under Expert Science and
activities
Mohammad RPMC Various survey B.16-1 Implementation of All Infrastructure Subprojects Non Bangladeshi other B.Sc., Civil 33.6 years by other
Nuruzzaman works in Survey ・ Assist preparation and implementation of the survey activities Key Engineering
MIA infrastructure Engineer - 1 ・ Assist evaluation of outputs of survey activities Expert (2010,
Subprojects Polytechnic
Animesh RPMC Various survey B.16-2 Implementation of All Infrastructure Subprojects Non Bangladeshi other B.Sc., Civil 13 years by other
Kumar works in Survey ・ Assist preparation and implementation of the survey activities Key Engineering
post-training activities
Subprojects
infrastructure sectors
Nazmun Naher RPMC Geotechnical B.17 Implementation of All Infrastructure Subprojects Non Bangladeshi other M.Sc., 14.2 years by other
ISLAM Engineer Geotechnical ・ Assist preparation and implementation of the survey activities Key Engineering
Sudhir Kumar RPMC Hydrological B.18 Implementation of Drainage and Flood Protection Non Bangladeshi other B.Sc. Civil 21.8 years by other
activities
infrastructure sectors
Md. Shah Wali RPMC Hydro- B.19 Implementation of Water Supply Subprojects Non Bangladeshi other M Sc. Geology 20 years by other
Masud Phah geological Hydro- ・ Assist on definite planning, hydrogeological assessment and Key and Mining,
LOVI Engineer geological detailed design including necessary surveys Expert (1994, Rashahi
and reports
activities
Subprojects
sector
Khalid NKB Management B.20 Implementation of Other Public Facilities (Building and Non Bangladeshi other B. Architecture 8.5 years by other
Mahmud of building and Architect Park) Subprojects (Same as A.5) Key (Design and
SHAHEEN park ・ Arrange and implement baseline and end-line surveys under Expert analysis)
activities
Mirza Motiar RPMC Electrical B.21-1 Implementation of Other Public Facilities (Building and Non Bangladeshi other B.Sc. Electrical 26.7 years by other
RAHMAN Engineering Electrical Park) Subprojects (Same as A.5) and Township Key and Electronic
・ Arrange and implement baseline and end-line surveys under (EEE), (1995,
・ O&M guidance
and reports
activities
township sectors
Md. Fazle RPMC Electrical B.21-2 Implementation of Other Public Facilities (Building and Non Bangladeshi other B.Sc. Electrical 18.6 years by other
ELAHI Engineering Electrical Park) Subprojects (Same as A.5) and Township Key and Electronic
and reports
as A.6) Sectors
activities
township sectors
Mohammad RPMC Quantity B.22-1 Implementation of All Infrastructure Subprojects Non Bangladeshi other B.Sc., 14.2 years by other
Azizul Islam Survey Quantity ・ Assist preparation and implementation of the survey activities Key Civil
MRIDHA Engineer, Engineer-1 ・ Assist evaluation of outputs of quantity survey activities Expert Engineering,
Estimator, etc. ・ Assist definite planning and D/D in respective fields (2007, Khulna
post-training activities
Subprojects
infrastructure sectors
Mohammad RPMC Quantity B.22-2 Implementation of All Infrastructure Subprojects Non Bangladeshi other B. Sc., 12.7 years by other
Sharier Survey Quantity ・ Assist preparation and implementation of the survey activities Key Civil
HOSSAIN Engineer, Engineer-2 ・ Assist evaluation of outputs of quantity survey activities Expert Engineering,
Estimator, etc. ・ Assist definite planning and D/D in respective fields (2009, Shahjalal
post-training activities
Subprojects
infrastructure sectors
Mahfujur RPMC Quantity B.22-3 Implementation of All Infrastructure Subprojects Non Bangladeshi other B. Sc., 13.4 years by other
RAHMAN Survey Quantity ・ Assist preparation and implementation of the survey activities Key Civil
Engineer, Engineer-3 ・ Assist evaluation of outputs of quantity survey activities Expert Engineering,
Estimator, etc. ・ Assist definite planning and D/D in respective fields (2008, Dhaka
post-training activities
Subprojects
infrastructure sectors
Md. NKB Survey, quality B. 23 -1 Implementation of All Infrastructure Subprojects Non Bangladeshi other B. Sc., 26 years by other
SHIHABUDDIN survey, Quality ・ Assist preparation and implementation of the survey activities Key Civil
detailed Control ・ Assist evaluation of outputs of quality survey activities Expert Engineering,
design, tender, Engineer-1 ・ Assist definite planning and D/D in respective fields (1987, Dhaka
post-training activities
Subprojects
infrastructure sectors
Md. Rafiqul RPMC Survey, quality B. 23 -2 Implementation of All Infrastructure Subprojects Non Bangladeshi other B. Sc., 27 years by other
ISLAM survey, Quality ・ Assist preparation and implementation of the survey activities Key Civil
detailed Control ・ Assist evaluation of outputs of quality survey activities Expert Engineering,
design, tender, Engineer-2 ・ Assist definite planning and D/D in respective fields (1989, Dhaka
post-training activities
Subprojects
infrastructure sectors
A. M. NKB Activity B.24 Private Contract Planning and Arrangement (SWM, Non Bangladeshi other B. Electrical and 9.5 years by other
AL-AMIN scheduling of Private Divisional Training Centre, Parks and Facilities, Key Electronic
contract, Expert ・ Confirm necessary administrative process at LGD, LGED and (EEE),
conditions and ・ Prepare activities schedule of all organizations concerned for University of
draft contracts, the private contracts required according to the implementation Engineering and
activities
Salman NKB Documentation, B.25 Project Management (Infrastructure development, Non Bangladeshi other M.Sc., 6.3 years by other
public relations and Media ・ Assist collection of all works progress, including capacity Expert Regional
respective fields
Establishment Planning
estimates University,
evaluation
Md. Shariful RPMC Resident B.26-1 Implementation of All Infrastructure Subprojects Non Bangladeshi other B.Sc. 23 years by other
ISLAM Engineer, Resident ・ Assist project coordination activities at field level Key Civil
Municipal Engineer-1 ・ Assist preparation and implementation of the survey activities Expert Engineering
Engineer, etc. ・ Assist definite planning and D/D in respective fields of Engineers,
post-training activities
Subprojects
infrastructure sectors
Md. Matiul RPMC Resident B.26-2 Implementation of All Infrastructure Subprojects Non Bangladeshi other B.Sci, 21 years by other
Islam Engineer, Resident ・ Assist project coordination activities at field level Key Civil
CHOWDHURY Municipal Engineer-2 ・ Assist preparation and implementation of the survey activities Expert Engineering,
Engineer, etc. ・ Assist definite planning and D/D in respective fields Bangladesh
post-training activities
Subprojects
infrastructure sectors
Md. Ismail RPMC Resident B.26-3 Implementation of All Infrastructure Subprojects Non Bangladeshi other Executive MBA 18 years by other
HOSSAIN Engineer, Resident ・ Assist project coordination activities at field level Key Marketing,
Municipal Engineer-3 ・ Assist preparation and implementation of the survey activities Expert (2011,
Engineer, etc. ・ Assist definite planning and D/D in respective fields University,
Subprojects
infrastructure sectors
Md. Haider RPMC Resident B.26-4 Implementation of All Infrastructure Subprojects Non Bangladeshi other B.Sc. Civil 17 years by other
AZAM Engineer, Resident ・ Assist project coordination activities at field level Key Engineering,
Municipal Engineer-4 ・ Assist preparation and implementation of the survey activities Expert (1993, Rajshahi
Engineer, etc. ・ Assist definite planning and D/D in respective fields Engineering and
and JICA
post-training activities
Subprojects