"SAFETY IS OUR FIRST PRIORITY"

11-V-304

11-V-303
11-V-311
11-E-217 10-V-27
10-V-21

CL NEW ROAD AVENUE 'F'

11-TU-201
11-E-701-3 10-V-20

10-K-01
10-V-22

02-L-203
11-E-701-1/2

11-E-212-1/2
N

11-E-212-3
11-C-701

11-R-301
11-E-211
L

11-R-202A
10-E-40

10-TK-01
11-E-311-A/B
11-R-204
11-V-434

11-R-202B
11-U-201

10-P-18A
10-P-18B
Drawing name: D:\D DATA MIA\D drive\BASE\JR JOBS\8-10 Cost Estimation of Platforms at Amm-III R-203 CDR unit area\ACCESS PLATFORM AT FORM R-203 TO F-201 AM3-SK-A3-39.dwg

11-R-205
11-R-201

PLANT
K

11-K-431
11-V-431
EXISTING

11-TK-431
11-V-432
EXISTING NEW
11-V-433

11-PK-207
EXISTING 11-E-502
CABLE TRAY & TUBING
ALONG WITH PLATFORM 11-E-434
TO BE RE-ROUTED
3530

NEW W6-20# NEW PLATFORM

11-E-210

11-F-201

C 6x13#

C 6x13#

C 6x13#

C 6x13#

C 6x13#

1000
AS PER REQUIREMENT J
617 617 617 617 617 617

3780

EXISTING PLATFORM

EXISTING PLATFORM

11-R-203
11-V-201

11-F-501
11-E-208

TOS+5.8m 3530

11-K-421

11-TK-421
11-E-501 11-TP-401A
11-P-401A

11-F-201

11-R-203
11-P-401B

11-V-206
11-E-504

11-K-421
11-E-218
11-L-401

11-V-203
2740 11-E-441 11-K-441

11-V-508
11-E-505

F-201 STRUCTURE
11-L-446

KEY PLAN
NEW W6-20#

F-201 PLATFORM
R-203 PLATFORM

EXISTING
C 6x13#

C 6x13#

C 6x13#
EXISTING
H

1000
C 6x13#

NEW W6-20#

685 685 685 685

2740
G
PLAN VIEW RAILING TO BE CUT
FOR LADDER ACCESS
EXISTING RAILING

L62x62x6
NEW MONKEY LADDER F
L62x62x6
EL +7.34m TOS

~450 1098 1000 HEA 160


EXISTING R-203 PLATFORM PIPE 1-1/4"NPS

NEW W6-20#
E

AS PER SITE
50x5

1559
FFL ±0.0 m

L80x40x6
VIEW FROM NORTH TO SOUTH TOS= +5.8m
150x5

( TO BE CHECKED)

HEA 180 NEW W6-20#


D
685 685 685 685

2740

ELEVATION VIEW
465

Sq. R
m BA
6mSTED m
I
50

TW 3m R 10 5
1100

GRATING SPACING 30xAT BA


EXISTING PLATFORM CHANNEL
FL GRATING 30x34x38 GRATING C
L80x40x6

BEARING DIRECTION W6-20# C6-13#


AN
38

30x3-34x38 BEARING BAR 30x3 & MESH 34x38


SP

W6-20#
38
585

7 7
150x5

HEA 180 W6-20#


30

UPPER SADDLE GRATING


5

GRATING
9mm THK. PLATE CONNECTION DETAILS
NOTES:1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHER WISE SPECIFIED. B
60

PLATFORM BEAM
WIDT
34
34

7 5 MAX. M8 BOLT H 2. ANY MODIFICATION IN DRAWING SHALL BE VERIFIED BY PROJECT ENGINEER


34

3. FIELD VERIFYALL DIMENSIONS PRIOR TO FABRICATION AND INSTALLATION.


TYP. DETAIL OF STOP GRATING HOOKS GRATING DETAIL 4. REMOVE ALL BURRS AND SHARP EDGES AFTER FABRICATION
HANDRAIL POST 5. FOR VERTICAL LADDER SEE SNAM STD.CP.GEN.7219
MK DATE REVISIONS DR APP MK DATE REVISIONS DR APP MK DATE REVISIONS DR APP REFERENCE DRAWINGS TITLE
A 6/11/20 ISSUED FOR REVIEW IRFAN ASGHAR MZM ACCESS PLATFORM FROM R-203 TO F-201 FIRST PLATFORM
AT AMM-III A

engro fertilizers
DES. CH. SCALE PROJECT NO. ---- REV
-- MAL ------- DWG.NO.
DR. APP. DATE AM3-SK-A3-39 A
IRFAN ASGHAR MZM 06-11-2020 SHEET 1 OF 1
17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1