Professional Documents
Culture Documents
UT DESIGNPROCESS-Model
UT DESIGNPROCESS-Model
Site Survey to be
Structure :- Under Tunnel
furnished as per check
Non- E.P.C projects
slip for CM & CD works
& as per 1. L.S of the stream/ vagu course atleast
IS : 7784 (Part I) : 1993 1Km on U/s & 1 Km on D/s and C.S at
every 100m intervals.
Input data 2. O.M.F.L of vagu/drain
verification of data furnished 3. contour map/Topo sheet duly marking
Silt factor ,Bore hole the proposed structure location
data / TPs & SBC of including the stream/vagu alignment
and catchment area as per Annexure A
foundation strata be
furnished.
Step6:
Reference
Scour depth calculations of drain.
IS : 7784 (part - 1) - 1993
R=1.34 (q2 / f)1/3 with relevant factor
of safety.
Reference Step7:
IS : 7784 (part - 2/sec2) - 1993 Uplift calculations for the floor of the
barrel and U/S & D/S side aprons
Step 9: on approval
Proposal Sketch