8.3.15.

UNDER TUNNEL(AQUEDUCT/ VIADUCT)

Site Survey to be
Structure :- Under Tunnel
furnished as per check
Non- E.P.C projects
slip for CM & CD works
& as per 1. L.S of the stream/ vagu course atleast
IS : 7784 (Part I) : 1993 1Km on U/s & 1 Km on D/s and C.S at
every 100m intervals.
Input data 2. O.M.F.L of vagu/drain
verification of data furnished 3. contour map/Topo sheet duly marking
Silt factor ,Bore hole the proposed structure location
data / TPs & SBC of including the stream/vagu alignment
and catchment area as per Annexure A
foundation strata be
furnished.

Hydraulic Design calculation Structural Design

Step1-MFL computations adopting DRAWINGS


UsingSlope area method R.C.C BOX :- Reference
slope area method a) General Plan, Sectional Elevation & End View - Plan indicating Half
R.C.C box design under canal portion, under head wall IS : 7784 (Part 2 / sec I) : 1995 Reference : SP-34
plan @Top & Half plan @ bottom & Sectional elevation along the LS of
and earth bank portion.The stress under head wall is the drain & End view along the cross section of the drain. GAD Scale : 1:50, 1:100 (or)
restricted to stress under earth bank and adopted the b) Wall Sections, R.C.C Details & Details of miscellaneous items. 1:200 .
same thickness and reinforcement for both the cases Sections Scale : 1:25 (or)
i.e., the same section is adopted. The Drawings shall contain assumptions made, TPs,Specifications, HPs 1:20/1:10 for RCC details.
References Step2- Selection of type of structure of canal, Hydrology of the drain, Stress table etc.
IS:7784 (Part 2 / section1):1995,
a. Design of ventway for the Drain / stream
IS : 7784 (part - I) - 1993
IS :783 - 1985
in UT limiting allowable velocity.

1. Design of Head wall,Wing walls & Return walls both


on U/S & D/S of drain - The walls adopting TVA
procedure / Coulomb's Theory / Rankine's Theory
Step3:
with appropriate top width . Reference
Reference
Design of Tail channel
2. Tabulation of stress table :- A consolidated stress IS : 7784 (Part 1 ) : 1993
IS : 7784 (part - I) - 1993 keeping in view of Lacey's Formula for
table has to be furnished indicating the stress on IS : 7784 (Part 2 / sec I) : 1995
Wetted perimeter & velocity limits depending TVA Hand book,IS - 456 : 2000
concrete & stress on soil for the under box, Head
on soil strata/ Trail pit classification.
wall, Wings & Returns.
3. The minimum grade of PCC shall be M15 Grade and
the minimum grade of RCC shall be M30 grade for
Step4: Box.
Reference If necessary provision for drops on U/S and
IS : 7784 (part - 2/sec1) - 1995 D/S of drain shall be provided.Transition with
2 : 1 and 3 : 1 splays on upstream and
downstream.Transition lengths on U/S & D/S
of drain. MISCELLANEOUS ITEMS :-
1. PVC Water stops
2. Weep holes in the Retaining walls above water level.
Reference
3. Expansion , Contraction & Construction Joints 1.IS : 7784 (part I) :1993
Step5: 4. 300 thick Revetment over 150 thick gravel backing 2.IS : 7784(part 2/Section3):1996
Reference TEL calculations for the Drain considering for the sides and 300 thick bed pitching over 225
IS : 7784 (part - 2/sec1) - 1995
eddy loss coefficients as per IS code along thick Gravel backing for a length not less than 3m on
with flow diagram with dimensions and levels. u/s and d/s of the structure shall be provided.
5. The canal shall be lined for a length of not less than
15 m on either side of the structure or as per the
agreement conditions of Project Authorities.

Step6:
Reference
Scour depth calculations of drain.
IS : 7784 (part - 1) - 1993
R=1.34 (q2 / f)1/3 with relevant factor
of safety.

Reference Step7:
IS : 7784 (part - 2/sec2) - 1993 Uplift calculations for the floor of the
barrel and U/S & D/S side aprons

Step 9: on approval
Proposal Sketch

CENTRAL DESIGNS ORGANISATION, A.P. Version 1.0 Page