You are on page 1of 366

Description

Rates

Analysis
Labour Cost

Material Cost

Calculation
Description

Unit Rate Labour Cost Material Cost


Introductory Notes
1 Excavation 1 Excavation 1 Excavation
2 Anti termit treatment 2 Anti termit treatment 2 Anti termit treatment
3 Earth work 3 Earth work 3 Earth work
4 Earth work support 4 Earth work support 4 Earth work support
5 Concrete 5 Concrete 5 Concrete
6 Timber Form work 6 Timber Form work 6 Timber Form work
7 Steel reinforcement 7 Steel reinforcement 7 Steel reinforcement
8 Brick work 8 Brick work 8 Brick work
9 Hollow block masonry 9 Hollow block masonry 9 Hollow block masonry
10 Random Rubble masonry 10 Random Rubble masonry 10 Random Rubble masonry
11 Pressed tilling 11 Pressed tilling 11 Pressed tilling
12 wall tiling and Terra tiles 12 wall tiling and Terra tiles 12 wall tiling and Terra tiles
13 Roofing 13 Roofing 13 Roofing
14 Roof plumbing 14 Roof plumbing 14 Roof plumbing
15 Ceiling 15 Ceiling 15 Ceiling
16 Doors and Windows 16 Doors and Windows 16 Doors and Windows
17 Iron mongaries 17 Iron mongaries 17 Iron mongaries
18 Plastering 18 Plastering 18 Plastering
19 Painting & Decorating 19 Painting & Decorating 19 Painting & Decorating
20 Plumbing (PVC) 20 Plumbing (PVC) 20 Plumbing (PVC)
21 External drainage (EW pipes) 21 External drainage (EW pipes) 21 External drainage (EW p
22 Plumbing (C.I pipes) 22 Plumbing (C.I pipes) 22 Plumbing (C.I pipes)
23 Manholes & Gulleys 23 Manholes & Gulleys 23 Manholes & Gulleys
24 Sanitary fittings 24 Sanitary fittings 24 Sanitary fittings
25 Gutters & Downpipes 25 Gutters & Downpipes 25 Gutters & Downpipes
Main Menu

Material Cost Calculation

Excavation 1 Excavation
Anti termit treatment 2 Anti termit treatment
Earth work 3 Earth work
Earth work support 4 Earth work support
5 Concrete
Timber Form work 6 Timber Form work
Steel reinforcement 7 Steel reinforcement
Brick work 8 Brick work
Hollow block masonry 9 Hollow block masonry
Random Rubble masonry 10 Random Rubble masonry
Pressed tilling 11 Pressed tilling
wall tiling and Terra tiles 12 wall tiling and Terra tiles
13 Roofing
Roof plumbing 14 Roof plumbing
15 Ceiling
Doors and Windows 16 Doors and Windows
Iron mongaries 17 Iron mongaries
Plastering 18 Plastering
Painting & Decorating 19 Painting & Decorating
Plumbing (PVC) 20 Plumbing (PVC)
External drainage (EW pipes) 21 External drainage (EW pipes)
Plumbing (C.I pipes) 22 Plumbing (C.I pipes)
Manholes & Gulleys 23 Manholes & Gulleys
Sanitary fittings 24 Sanitary fittings
Gutters & Downpipes 25 Gutters & Downpipes
Labour Salary

Un skill labourer / 1 hr 1.20 0.15


Skill labourer / 1 hr 1.20 0.15
1 day carpenter / 1 hr 1.50 0.19
1 day mason / 1 hr 1.50 0.19
1 day blanksmith / 1 hr 1.50 0.19
1 day tinker / 1 hr 1.50 0.19
1 day tinkerU/SK labourer/1hr 1.50 0.19
1 day glazier / 1hr 1.50 0.19
1 day painter 1 hr 1.50 0.19
1 day Plumber / 1 hr 1.50 0.19

Main Menu

Analysis
Material Cost

1 lbs blasting powder 0.00


1 lft fuse 0.00
1 lb jumper steel 0.00
1 lbs D.D.T. Powder ( 8% in 20goals of water) 0.00
1 gals water 0.00
Copper Napthaline (5% in 4 to 8 gqls of fuel oil) 0.00
Sodium Arsenate ( 10% in 12 to 20 20gals of water) 0.00
1.00 cube earth deliverted at site. 0.00
1 cu.ft class II timber (4uses) 0.00
1 cwt (50Kg bags) cement / 1lbs 0.00 0.00
1 cubes river sand 0.00
1 cubes 1 1/2" metal 0.00
1 day hire of mixer 0.00
1 cubes 1" metal 0.00
1cubes 3/4" metal 0.00
Jute Hessian - 1sq.ft 0.00
1 sq.ft 1" thick class II timber 0.00
1L.ft 2"x 2" class II timber in yokes. 0.00
1 L.ft 2"x 1" class II timber battens. 0.00
1 lb wire nails. / 1Kg 0.00 0.00
1 Nos. 16mm 18" long bolts (20uses) 0.00
1 litre mould oil 0.00
1 L.ft 4"x 2" props (10 uses) 0.00
1 L.ft 4"x 2" bearers at bottom of mould. 0.00
1 L.ft 2"x 2" bracing to mould & props 0.00
1 sq.ft 1" timber base plate to props 0.00
1 Nos wedges 0.00
1 sq.ft 1" thick tongue and grooved timber 0.00
1 L.ft 4"x 2" runners at 2'0" centres. 0.00
1 cwt. M.S./ Tor steel rods including transport to site. 0.00
1 lbs 16 BWG binding wire 0.00
1 Brick 0.00
1 weirecut bricks 0.00
1 gals acid 0.00
1 cwt slaked lime 0.00
1 Hollow cement blocks 0.00
1 cubes 6" - 9" Rubble 0.00
1 pressed tiles 8"x 8" 0.00
1 lb wax polish 0.00
1 lb coloured pigment 0.00
1 lbs cotton waste 0.00
1 glazed tiles 6"x 6" 0.00
1 cubes fine sand 0.00
1 lb white cement 0.00
1 12"x 12" Terrazo floor tiles 0.00
1 cu.ft timber 0.00
1 L.ft 2"x 1" reepers 0.00
1Sq.ft flat asbestoes sheets 0.00
1 doz. Sheets sandpaper 0.00
1 Tiles 0.00
1 Cu.ft timber purlins 0.00
1Sq.ft asbestoes currugated sheets 0.00
1 Nos. roofing screws and washers. 0.00
0.00
1 Pairs ridges 3'8" long 0.00
1 Ridge tiles 0.00
1 sq.ft 1" planks 0.00
1 Nos. 1 1/2" brass screws 0.00
1 G.I sheet (8' * 4') 0.00
1 gal wood preservative / 1 litre 0.00 0.00
1 lb soldering lead 0.00
1 cu.ft timber class I 0.00
1 Nos. fibre/ plastic plugs 0.00
2" brush 0.00
1 gal tarnap 0.00
1 L.ft 2"x 2" halmilla cove moulding 0.00
1 L.ft 1 1/2"x 1 1/2" halmilla cove beadings 0.00
1 lb 1/4" clout nails 0.00
1 sq.ft 6"x 3/4" Lunumidella ceiling planks 0.00
1 L.ft 2"x 1/4" timber strips 0.00
1 cu.ft 4"x 3" timber 0.00
1 No. spur stones 0.00
1 Nos. 5/8" dia mild steel dowels 4" long 0.00
1 sq.ft 1 1/2" planks 0.00
1 No. 6'9"x 2'9" plywood sash. 0.00
1 doz. 1 1/4 long brass screws. 0.00
1 sq.ft 3" x 1 1/2" timber 0.00
1 sq.ft glass panes 0.00
1 L.ft 1/2"x 1/2" beading 0.00
1 doz. Brass panel pins 0.00
1 1/4 Mullion Butt hinges 5"x 2 1/2" 0.00
1 doz. 3/4" brass screws / 1 Nos 0.00 0.00
1 Pair Tee hinges 0.00
1 doz. 3/4" iron screws 0.00
1 Nos rim lock with screws 0.00
1 Mortice lock with screws 0.00
1 Casement stays 0.00
1 doz. 1/2" brass screws / 1 Nos 0.00 0.00
1 Door closer 0.00
1 Tower / skeleton brass bolt. 0.00
1 Barrel bolt. 0.00
1 Casement fasteners 0.00
1 brass fanlight catches. 0.00
1 Draw rings 0.00
1 gals bitumen 0.00
1 lbs Firewood 0.00
1 3" brush (1/10 use) 0.00
1 Ltr. Anti - corrosive primer 0.00
1 Ltr. Mineral turpentine or thinner 0.00
1 wire brush 0.00
1 Ltr. Enamel paint 0.00
1/2 wire brush 0.00
1 sand papers 0.00
1 cwt boiled lime 0.00
2 lbs salt 0.00
1 lb yellow ochre. 0.00
2 lb blue ochre 0.00
6" brush (1/10 use) 0.00
1 6" coir brush 0.00
1 gal emulsion paint 0.00
1 ltr primer. 0.00
1 gals Varnishing 0.00
0.00
1 floor brush 0.00
1 yards flannel cloth 0.00
1 L.ft pipes 0.00
1 clips and nails 0.00
1 grms. Solvent cement 0.00
1 1" dia sockets. 0.00
1 1 1/4" dia sockets. 0.00
1 1 1/2" dia sockets. 0.00
1 2" dia sockets. 0.00
1 3" dia sockets. 0.00
1 No 1/2" elbows / bends / sockets 0.00
1 No3/4" elbows / bends / sockets 0.00
1 No 1" elbows / bends / sockets 0.00
1 No 1 1/4" elbows / bends / sockets 0.00
10 No 1 1/2" elbows / bends / sockets 0.00
10 No 2" elbows / bends / sockets 0.00
10 No 2 1/2" elbows / bends / sockets 0.00
10 No 3" elbows / bends / sockets 0.00
1 No - 1/2" tees 0.00
1 No - 3/4" tees 0.00
1 No - 1" tees 0.00
1 No - 1 1/4" tees 0.00
1 No - 1 1/2" tees 0.00
1 No - 2" tees 0.00
1 No - 2 1/2" tees 0.00
1 No - 3" tees 0.00
1 No - 4" dia PVC pipes 0.00
1 lbs. yarn 0.00
1 cubes excavated soil 0.00
1' L.ft 4" dia C.I pipe 0.00
1 Timber plug 6"x 6"x 2" 0.00
1 3" Iron screws 0.00
1 lbs lead 0.00
1 cwt firewood 0.00
1 4" S.W gulley 0.00
1 4" C.I grating. 0.00
1 - wash basin complete with brackets 0.00
1 - 1/2" tap 0.00
1 - 1 1/2" brass screws 0.00
1 - sink 24"x 15"x 7" 0.00
1 - L iron brackets 0.00
1 - tapered wooden blocks 2" thick 0.00
1 - low level suite complete 0.00
1 - 1/2" dia stop cock 0.00
1 - squqrting pan with trap 0.00
1- gals C.I cistern with 1 1/4" flush, pipe, chain & over flow pipe 0.00
1 - Clip 0.00
waste plug and chain 0.00
1 - bidet 0.00
1 - urinal Bowls 0.00
1 - Rawl plug 0.00
1 - spreader 0.00
1 - 6" dia eaves gutter lengths 0.00
1 - joiner 0.00
1 - gutter brackets 0.00
1 - PVC gutter 0.00
1 - mitre bend 0.00
1 No. end cap 0.00
1 - 3 1/2" dia pipe lengths 0.00
1 - 3 1/2" joiner 0.00
1 - PVC straps 0.00
1- 1" brass screws 0.00
1 - 60o80' elbows 0.00
Unit Rate
Introductory Note:
Mark up of 35% Basic rates as overheads & profit allowances

The rates in this BSR analysis are the basic rates. This rate is compounded taking in to acount
(1) The market price of the materials that make up the item of work,
(2) The cost of transport of such materials to the site,
(3) The wages of the labour required in carrying out the work,
(4) The cost of any plant required.

In carrying out a work, besides the basic cost, there are other costs that have to be incurred by
the contractor, which costs cannot be considered as direct productive work. These costs
cannot be calculated in terms of materials and labour cost and are termed as overheads on a
job and can be grouped under two main sub heads. Thus,

(1) Job overheads


That vary with and are caused directly to the individual job.

(2) General overheads


Which includde costs of maintainig an office, work shop and yard in which to do business
wheather or not there is a job under way and such expences are continuos and may be sured
by the job tutrnover.

The common items that make up these overheads are listed of the analysis. The overhead item
involved in a job is assessed as a percentage of the basic cost of the job. These percentage
have been arrived at from records of expenditure incurred in such activities over a period of
time.

Profits
10% of the basic cost is allowed as profits and the total mark up of the basic cost is 35%
(25% forjob overheads, 10% for profitals)

Thus it will be seen that on this basic cost of awork, a controctor is allowed a mark up of 35%,
of which 25% is the cost of servicing the contract and 10% as contractors profit.

It will be seen that the 25% overheads is made up of 19% as job overheads and 6% as general
overheads.

The job overheads are overheads incurred atvthe site and are applicable to all clases of .
contractors
The General overheads however, will depend on the size of the contractor organization and the
facilities maintained by the organization.
Thus any reduction in the overheads allowance to a contractor could be only within in this 6%
as general overheads and that any reduction will be marginal.

This committee is of the opinion that all controctors (irrespective of sizes of their organization)
should be allowed a mark up of 35% on the basic costs as overheads and profit allowance.

Originally this ministry had paid the mark up as 30% (in 1.78) and on representation made, it
was increased to 35% (in the years 1979 - 1980) and later it was reduced to 25% and again to.
22% etc We belive that this was one of the deterioration of the standard of building work.

MATERIAL AND LAOUR ANALYSIS FOR BUILDING WORK

Analysis for basic rates

The material and labour component required for the various items of work including the
minimal plant qeuired for same is detailed in the anlysis of basic rates which have been
includeed in following page

Basic rates
The basic rate is analysis ounder the followig headings

(a) Materials
The quantities of materials required fot the items are compued from known data and exprence
their total value is calculated on the basis of current cost of purchase at sourecs of supply .
Unless otherwise stated wastages in allowed in the norms .

(b) Transport
This component provides for the cost of transport if material from sot\urces of supply to the sits
the work this componnt is usually added to the matrial cost

(c) Labour
He labour wages are as approved by government from tome to time and on the basis of an
8 hour working day

(d) Plant
This component provides the minimam plant required for the items of works .the cost of tools
and implements is provided for in the overhead allowances

(e) Basic cost


The basic cost is the sum of the costs of iems (a),(b),(c),and (d) above
Over heads and profit factors

Over head costs include such costs that cannot be considered as direct productive work on the
job.These may may be generally grouped as follows.

a) Job overheads
That vary with and are caused directly to the individual job.

(b) General overheads


Which includde costs of maintainig an office, work shop and yard in which to do business
wheather or not there is a job under way and such expences are continuos and may be sured
by the job tutrnover.

Job overheads (site overheads) % of Basic cost

1. Supervision of work (wages of work) 1.00


2. Supervision of labour (wages of Gangers) 4.00
3. Temporary works
a. Access Road & maintananve 0.20
b. Site building for accommodation of part of labour 0.70
c. Central stores building 0.60
d. Fencing & protection 0.30
e. Provision of water, lights etc. 0.30
f. Clearing & tidying up 0.20
g. Collection of building materials including cement &
steel 0.40

4. Watchers for field stores & security of sites 0.80


5. Tools and implements for misellaneous work 0.90
6. a. Setting out & measure part 0.50
b. providing samples for testing 0.20
7. Transporation of supervisiopry staff 1.00
8. Job offices, Furniture, Stationary, supplies, Water, Lights, rtc. 0.90
9. Wages of job offices staff 1.20
10. transportation of job office staff. 0.40
11. a. Bonds for bid performance and fiedelity guaratee 0.30
b. Insurance of work and workmans compensation 0.50
12. a. Interest in capital 1.60
b.Business Turnover Tax 3.00
19.00

General Overheads
13. Head office and rent, lights,telephone,stationary supplies, furniture,etc.,
for same 0.60
14.Salaries of head office manager, Engineers, Technical Assistants,
Draughtsman, Clerk,stenos,Typysts,Minor staff & Drivers. 1.20
15. Transporation of subsistance of Head office staff 1.00
16. Insurance, Interest and Taxes on business 0.40
17. Legal expences and consultancy fees 0.20
18. workshop & yard rents, garages and supplies 2.20
19. Salaries of workshop & Yard storekeepers, Dricers, Foreman,
Mechanics and workman 0.40
6.00

Profits

Ten percent (10%) of the Basic costs is allowed as profit to the contractor.

Overheads & Profit Factor

Combining the factors for overheads and the prfits factor we get 35% of the basic rate as the
overhead and profit factor which also called the "Mark-Up" on the basic rate. The basic rate
is multiplied by the factor 1.35 to obtain the workingb rate.

This basic rate analysis does not include for the use of heavy plant equipment. This analysis
providesfor a labour intensive method of work with a minimal use of machinery. The machinery
allowed in this analysis is the concrete mixer, the vibrator and a hoist in the case of a multy
story building for the lift of materials to the various floors.

This analysis is aplicable for a building having a maximum of four storeys - ie ground and three
flors.

If a building has more than four floors or when the contract period is compressed to a few
months, then it will be necessary to allow for the use of heavy machinery. Such as tower
cranes,mobile cranes, dumpers loadersl, batching plant for the mixing of cuncrete, bins for
storage of concrete material etc. and also for the empoyment of contract managers and
additional staff.

The cost of such items of work will not be accommedated within the 35% "Mark-Up" and will
have to be provide for in separate items sucha as preliminaries to the contract.
Conversion - Imperial to metric

To convert rate per To rate per Multiply by

Cube M3 0.353
Square M2 0.1075
Sq.ft M2 10.7584
L.ft M 3.23
Cwt Kg 0.02

1 Sq = 9.29506M2
1 Cu = 2.83M3
1 M3 = 0.353 cu.ft
1 horse power = 746 watts

Allowances to be made in the rates for lift in respect of work on uper floors

In the analysis of the various item in following pages the refer to work on the ground floor

To these rates on the percentage (of the ground floor rates) indicated in the table below should
be addded to obtain the rates applicable to the first end and third floors. This B.S.R. is limited
to work on the ground and 3 upper floors only.

Ground to 1st floor ground to 2nd floor Ground to 3rd floor

Concrete (cube) 3% 5% 0.07


9" Brick wall (sqr) 5% 7% 0.09
9" Brick wall (cube) 5% 7% 0.10
4 1/2" brick wall (sqr) 5% 7% 0.10
steel reinf (cwt) 2.50% 3% 0.08
Plastering (sqr) 5% 10% 0.15
Painting (sqr) 3% 6% 0.09
Floor tilling (sqr0 2% 4% 0.06
Wall tiling 9Sqr) 2% 4% 0.06
roof culicut tiles (sqr) 3% 6% 0.09
Roof Asbestoes (sqr0 3% 5% 0.07
Ceiling Work 3% 5% 0.07

EARTH WORK AND LANDSCAPING

01. Soils met with in excavation have been classified as follows


1.Soft / Loose soil
2.Ordinary soil
3. Hard soil
4. Mud /Wet soil
5. soft disintegrated rock (rock interquiring blasting)
6. Hard rock - a) Where blasting is approved
b) wher blasting is prohibited.

02. the analysis has been prepared for each of the above categories as shown in item Nos 3-9

03. However in the preparation of estimates for purposes of calling for tenders, only two
B.O.Q item would be included in the B.O.Q. as against the B.S.R. item Nos. 3,4,5,6,7,8, & 9.
The descreption of these B.O.Q items would be as follows
(a) excavation in material met with except roack requiring blasting
(b) Excavation in rock requirting blasting

04. This classification has been adopted ( where tenders are called) to avoid any dispute that
may arises as to the exact nature of the soil that will be met with when the actual excanation
carried out. The tender is expected to examine the site in to form own opinion of the nature of
the soil that is met with and rate his tender acorddingly.

05. The classification of the soil is note 1 above and the analysis provided for the different type
of soil will help the estimater in arriving at the actual cost of excavation, for which he will have
to alloow in his estimates.

06. Under Note 1(6)b yard rock, an analysis is provided for removing Hard rock met with in
the fopundation excavations where blasting is prohibited or cannot be done, like in built up
areas where blasting can cause da mage to adjointing building.

07. In the excavation item Nos 3 to 9, the labour norm allowed in the items is form an
excavation up to a maximum depth of 5'0". For excavation beyond the depth 5'0" an additional
unskilled labourer shpuld added for every additional depth of 5'0" or part there of for each
cube of excavation beyond the original 5'0" depth.
Item Description Rate
Excavation
1 Removing top soil to a depth not exceeding 6" & depositing as
directed within site.

Per 10 square
Concider an area of 10.00 sqrs.
ie 5.00 cubes of excavation
10days U/SK labourer 1.20

Rate per 10.00 square

Rate per square

2 Excavation over site to reduce level, in any material except


rock requiring blasting including depositing and levelling as
directed up to a distance not exceeding 30'0".

Per cube
15/8 day U/SK labourer 1.20

Rate per cube

3 Excavation in trenches for walls / column pits in soft / loose soil


from 0'0" to 5'0" deep and depositing excavated material to a
distance not exceeding 30'0" (Earth work support to be paid
seperatyely where necessary)

Per cube
1 day U/SK labourer 1.20

Rate per cube


4 Excavation in trenches for walls / column pits in ordinary soil
from 0'0" to 5'0" deep and depositing excavated material not
exceeding 30'0".

Per cube
2 1/2 days U/SK labourer 1.20

Rate per cube

5 Excavation in trenches for walls / column pits in Hard / dense


soil up to a depth of 5'0" and depositting excavated material up
to a distance not exceeding 30'0".

Per cube
3 1/2 days U/SK labourer 1.20

Rate per cube

6 Excavation and trenches for walls/ column pits in mud / wet


soil up to a depth of 5'0" and depositting excavated material to
distance not exceeding 30'0"

Per cube
3 days U/SK labourer 1.20

Rate per cube

7 Excavation in trenches for walls/ column pits in soft


distintegrated rock ( not requiring blasting) upto a depth of
5'0"& depositing excavted material to a distance not
exceeding 30'0".

Per cube
2 1/2 days U/SK labourer 1.20

Rate per cube


8 Excavation in trenches for walls/ column pits in Hard
rock requiring blasting upto a depth of 5'0"& depositing
excavted material to a distance not
exceeding 30'0".

Per cube
Materials
0.75 lbs blasting powder 0.00
10 lft fuse 0.00
1 lb jumper steel 0.00
Fuel & forge - 20% of material cost 0.00

Labour
1 days SK labourer 1.20
2 days U/SK labourer 1.20

Rate per cube

9 Benching rock in foundation in 3"-6" steps. (Blasting prohibite)

Per 10 squire feet


Drilling, Chipping & welding - 1 1/2 days SK labourer 1.20
Steel, fuel & forge - 25% of labour cost.
Collecting & Disposing - 1/2 days U/SK labourer 1.20

Per 10 square feet

Rate per sq.ft

10 Anti termite treatement


Anti termite treatement on excavated foundation and
compacted soil under floors

Per squqre
Materials
16 lbs D.D.T. Powder ( 8% in 20goals of water) 0.00
20 gals water 0.00

Labour
1/2 days U/SK labourer 1.20

Rate per square


Note: Alternative mixes
(a) Copper Napthaline (5% in 4 to 8 gqls of fuel oil)
(b)Sodium Arsenate ( 10% in 12 to 20 20gals of water)

11 Earthwork - Back filling & Compacting


Backfilling to trenches with selected earth available at site.

Per cube
1 days U/SK labourer 1.20

Rate per cube

12 Backfilling to trenches with imported material.

Percube
1.00 cube earth deliverted at site. 0.00
Allow 15% compaction 0.00
Filling & Compacting - 1 1/4 days U/SK labourer 1.20

Rate per cube

13 Filling under floors including levelling, watering & compacting


in 3" layers with available and selected earth at site.

Per cube
2 days U/SK labourer 1.20

Rate per cube

14 Filling under floors including levelling, watering & compacting


in 3" layers with imported selected earth.

Percube
1.00 cube earth deliverted at site. 0.00
Allow 15% compaction 0.00
Filling & Compacting
2 days U/SK labourer 1.20
Rate per cube

15 Cutting turf sods, loading to hand carts and transporting up to


30 yqrds, laying and watering for 30 days. (Royalty for turf,
pegging and transport beyond 30 years paid seperately).

Per squqre
Cutting turf sods, loading and transporting to site and unloading
- 2 1/2 days U/SK labourer 1.20
Laying turf rods at site -
1/2 days U/SK labourer 1.20
Watering for 30 days -
1/2 days U/SK labourer 1.20
60 gals water. 0.00

Rate per square


Note:
Rate does not include for:
(a) Royalty for turf
(b) Transport of turf
(c) Pegs on sloping rates
(d) Water

Earth work support


16 Earthwork support (open planking) in trenches up to a depth
of 5'0"
Concider trench 15'0" long
3'0" wide and 5'0" depth
open planking to both faces.

Total area - 150 sq.ft (15'*5'*2)


Materials
17.50 cu.ft class II timber (4uses) 0.00
Add 5% on above for wedges 0.00

Labour
1 Days carpenter 1.50
3 Days U/SK labourer 1.20
Total per 150 sq.ft

Rate per square


17 Earthwork support (close planking) in trenches up to a depth
of 5'0"
Concider trench 15'0" long
3'0" wide and 5'0" height of planking to both faces

Motal area of planking 2/ 15'0" * 5'0" ie 150 sq.ft.

per 150 sq.ft

Materials
3.00 cu.ft class II timber (4uses) 0.00
Add 5% on above for wedges 0.00

Labour
2 Days carpenter 1.50
6 Days U/SK labourer 1.20

Total per 150 sq.ft

Rate per square

18 Earthwork support (close planking) in deep excavation in


trenches up to a depthof 5'0"
Consider trench of length of 15'0"
Width 5'6" at top
Width 3'6" at bottom
Then area supported is 2/ 15'15' = 450 sq.ft

Per 450 sq.ft

Materials
100.00 cu.ft class II timber (4uses) 0.00
Add 5% on above for wedges 0.00

Labour
8 Days carpenter 1.50
20 Days U/SK labourer 1.20
Total per 450 sq.ft

Rate per square


Concrete

Premeable

Assumption

1. Mixing concrete using a concrete mixer 14/10 cu.ft capacity


and manual loading are the basis on which the norms are
worked.

2. A gang of 1 skilled and 6 un skilled labourers produce 3.00


cubes of concrete per day using a 14/10 cu.ft capacity mixer.
This is per accepted practice.

3.The production of concrete is at the mixer site transporting


mixed concrete and placing same in position is paid for
seperately.

4.In concrete items 26 to 39 both inclusive, placing of concrete


in columns, beams and floor slabs on the ground floor the
labour component allowed is for the placing of concrete
betweeen the ground floor and top of the 1st floor slab which
area is calleded the ground floor area. Similarly the area
between the top of the 1st floor slab and the top of the 2nd
floor slab is called the 1st floor area etc.

19 Mixing concrete 1:3:6 (1 1/2")

Per cube
Materials
13 cwt (50Kg bags) cement 0.00
0.53 cubes sand 0.00
0.92 cubes 1 1/2" metal 0.00
1/3 day hire of mixer 0.00
Water (110 gals) 0.00

Labour
1 day Skilled labourer 1.20
6 Days U/SK labourer 1.20

Rate per cube


Note:
a. Water available at site
b. If water is not available allowances should be ,made for
transport of water.
c. sand includes 15% for bulking

20 Mixing concrete 1:2 1/2:5 (1")

Per cube

Materials
14 cwt (50Kg bags) cement 0.00
0.60 cubes sand 0.00
0.90 cubes 1" metal 0.00
1/3 day hire of mixer 0.00
Water (100 gals) 0.00

Labour
1 day Skilled labourer 1.20
6 Days U/SK labourer 1.20

Rate per cube


Note:
a. Water available at site
b. If water is not available allowances must be ,made for
transport of water.
c. sand includes 15% for bulking

21 Mixing concrete 1:2:4 (3/4")

Per cube

Materials
18cwt (50Kg bags) cement 0.00
0.50 cubes sand 0.00
0.88 cubes 3/4" metal 0.00
1/3 day hire of mixer 0.00
Water (120 gals) 0.00

Labour
1 day Skilled labourer 1.20
6 Days U/SK labourer 1.20

Rate per cube


Note:
a. Water available at site
b. If water is not available allowances must be ,made for
transport of water.
c. sand includes 15% for bulking

22 Mixing concrete 1:1 1/2:3 (3/4")

Per cube

Materials
23 cwt (50Kg bags) cement 0.00
0.42 cubes sand 0.00
0.82 cubes 3/4" metal 0.00
1/3 day hire of mixer 0.00
Water (150 gals) 0.00

Labour
1 day Skilled labourer 1.20
6 Days U/SK labourer 1.20

Rate per cube


Note:
a. Water available at site
b. If water is not available allowances must be ,made for
transport of water.
c. sand includes 15% for bulking

23 Mixing concrete 1:1:2 (3/4")

Per cube

Materials
31 cwt (50Kg bags) cement 0.00
0.44 cubes sand 0.00
0.96 cubes 3/4" metal 0.00
1/3 day hire of mixer 0.00
Water (200 gals) 0.00

Labour
1 day Skilled labourer 1.20
6 Days U/SK labourer 1.20
Rate per cube
Note:
a. Water available at site
b. If water is not available allowances ust be ,made for
transport of water.
c. sand includes 15% for bulking

24 2" thick cement concrete screed in foundation at depths not


exceeding 5'0"

Per square

Materials
1/6 cube concrete 8.40
Add 10% for wastage 0.14

Labour
1/8 day Skilled labourer 1.20
1/2 day U/SK labourer 1.20

Rate per square

Note:
For laying concrete at depths more than 5'0", add 1/6 day
unskilled labourer for each additional 5'0" or part thereof per square.

25 3" thick cement concrete screed in foundation at depths not


exceeding 5'0"

Per square

Materials
1/4 cube concrete 8.40
Add 10% for wastage 0.21

Labour
1/8 day Skilled labourer 1.20
1/2 day U/SK labourer 1.20

Rate per square


Note:
For laying concrete at depths more than 5'0", add 1/4 day
unskilled labourer for each additional 5'0" or part thereof per
square.

26 6" thick cement concrete floor (mass concrete)

Per square

Materials
0.5 cubes concrete 8.40
Add 5% for wastage 0.21
Water (200 gals) 0.00

Labour
1/2 day Skilled labourer 1.20
1 1/4 day U/SK labourer 1.20

Rate per square

Note:
a. Water available at site
b. If water is not available allowances ust be ,made for
transport of water.

27 Cement concrete 4 1/2" * 6" columns in ground floor.

Per 0.45 cube(30 Mpa)

Materials
0.45 cubes concrete 8.40
Add 10% for wastage 0.38
1 day hire of vibrator 0.00

Labour
1 day Skilled labourer 1.20
1 day carpenter 1.50
3 days U/SK labourer 1.20
1day SK labourer (Vibrator) 1.20

Curing
Jute Hessian - 10 sq.ft 0.00
Water - 170 gals 0.00
1days U/SK labourer 1.20

Total for 0.45 cubes or 240 L.ft of columns.

Rate per cube


or Rate per L.ft of column
Note:
1) For column in 1st floor add 3% to ground floor rate.
2) For column in 2nd floor add 5% to ground floor rate.
transport of water.

28 Cement concrete in 6" * 6"column in G.F each 10'0" high ie 0.45 cubes.

Per 0.45 cubes.


Materials
0.45 cubes concrete 8.40
Add 10% for wastage 0.38
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
3 days U/SK labourer 1.20

Curing
Jute Hession - 80 sq.ft 0.00
Water - 140 gals 0.00
1 1/2 days U/SK labourer 1.20

Total for 0.45 cubes


or 180 1.ft of column

Rate per cube


or Rate per L.ft of column

Note:
1. For cfolumn in 1st floor add 3% to ground floor rate.

2. For column in 2nd floor add 5% to ground floor rate.


3. For column in 3rd floor add 7% to ground floor rate.

4. Water available at site.

5.If water is not available allowances must be made for


transport of water

29 Cement concrete in 9" * 9" column in ground floor.

Consider 8 No columns 9"*9" each 10'0" high ie 0.45 cubes

Per 0.45 cubes.

Materials
0.45 cubes concrete 8.40
Add 10% for wastage 0.38
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
3 days U/SK labourer 1.20

Curing
Jute Hession - 60 sq.ft 0.00
Water - 100 gals 0.00
1/2 days U/SK labourer 1.20

Total for 0.45 cubes


or 30 1.ft of column

Rate per cube


or Rate per 1.ft of column

Note:
1. For cfolumn in 1st floor add 3% to ground floor rate.

2. For column in 2nd floor add 5% to grtound floor rate.

3. For column in 3rd floor add 7% to ground floor rate.

4. Water available at site.


5.If water is not available allowances must be made for
transport of water

30 Cement concrete in12" * 12" column in ground floor.

Consider5 No columnss12" * 12" each 10'0" high.

Per 0.50 cubes.

Materials
0.50 cubes concrete 8.40
Add 5% for wastage 0.38
1 day hire of vibrator 0.00
40 sq.ft Jute Hessian 0.00
Water (100 gals) 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
3 days U/SK labourer 1.20

1 1/2 days U/SK labourer (Curing) 1.20

Total per 0.50 cubes


or 50 L.ft of column

Rate per cube


or Rate per 1.ft of column

Note:
1. For cfolumn in 1st floor add 3% to ground floor rate.

2. For column in 2nd floor add 5% to grtound floor rate.

3. For column in 3rd floor add 7% to ground floor rate.

4. Water available at site.

5.If water is not available allowances must be made for


transport of water
31 Cement concrete in 13 1/2" * 13 1/2" column in ground floor.

Consider 4 No. columns13 1/2" * 13 1/2" each 10'0" high.


ie 0..51cubes
Per 0.51 cubes.

Materials
0.51 cubes concrete 8.40
Add 5% for wastage 0.19
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
3 days U/SK labourer 1.20

Curing
Jute Hession - 45 sq.ft 0.00
Water - 100 gals 0.00
1 1/2 days U/SK labourer 1.20

Total for 0.51 cubes


or 40 1.ft of column

Rate per cube


or Rate per L.ft of column
Note:

a. Water available at site.

b.If water is not available allowances must be made for


transport of water

32 Cement concrete in 6" * 6" Beam up to 1st floor level.

Consider 180 L.ft of beam 6" * 6" ie. 0.45 cubes

Per 0.45 cubes.

Materials
0.45 cubes concrete 8.40
Add 10% for wastage 0.38
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 1.20

Curing
Jute Hession -90 sq.ft 0.00
Water - 180 gals 0.00
1 1/2 days U/SK labourer 1.20

Total for 0.45 cubes


or 180 1.ft of beam

Rate per cube


or Rate per 1.ft of beam
Note:

a. Water available at site.

b.If water is not available allowances must be made for


transport of water

33 Cement concrete in 9" * 6" Beam up to 1st floor level.

Consider 120 L.ft of beam 9" * 6" ie. 0.45 cubes

Per 0.45 cubes.

Materials
0.45 cubes concrete 8.40
Add 10% for wastage 0.38
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 1.20
Curing
Jute Hession - 75 sq.ft 0.00
Water - 150 gals 0.00
1 1/2 days U/SK labourer 1.20

Total for 0.45 cubes


or 120 1.ft of beam

Rate per cube


or Rate per 1.ft of beam
Note:

a. Water available at site.

b.If water is not available allowances must be made for


transport of water

34 Cement concrete in 9" * 9" Beam up to 1st floor level.

Consider 80'0" length of 9" * 9" beam ie. 0.45 cubes

Per 0.45 cubes.

Materials
0.45 cubes concrete 8.40
Add 10% for wastage 0.38
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4 days U/SK labourer 1.20

Curing
Jute Hession - 60sq.ft 0.00
Water - 120 gals 0.00
1 1/2 days U/SK labourer 1.20

Total for 0.45 cubes


or 80 1.ft of beams

Rate per cube


or Rate per 1.ft of beam
Note:

a. Water available at site.

b.If water is not available allowances must be made for


transport of water

35 5" thick R.CC floor slab in 1st floor

Consider 5" thick slab 10'0" * 12'0" volume of concrete 50.00


cu.ft.

Per 50.00 cu.ft

Materials
50.00 cu.ft concrete (25 Mpa) 0.08
Add 10% for wastage 0.42
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 1.20

Curing
Jute Hession -30sq.ft 0.00
Water - 90 gals 0.00
1 1/2 days U/SK labourer 1.20

Total for 50 cu.ft


or 120 sq.ft

Rate per cube


Note:
a. Water available at site.

b.If water is not available allowances must be made for


transport of water

36 6" thick R.CC floor slab in 1st floor


Consider 10'0" * 10'0" panel
.
Per 50.00 cu.ft

Materials
50.00 cub. ft concrete (25 Mpa) 0.08
Add 10% for wastage 0.42
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 1.20

Curing
Jute Hession -25 sq.ft 0.00
Water - 90 gals 0.00
1 1/2 days U/SK labourer 1.20

Total for 50 cu.ft


or 100 sq.ft

Rate per square


Note:
a. Water available at site.

b.If water is not available allowances must be made for


transport of water

37 Cement concrete in 4 1/2" * 6" lintols in ground floor

Consider 240 1.ft or 45 cu.ft

Materials
45.00 cu.ft (25 Mpa) 0.08
Add 10% for wastage 0.38
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 1.20

Curing
Jute Hession -10 sq.ft 0.00
Water - 90 gals 0.00
1 1/2 days U/SK labourer 1.20

Per 0.45 cube


or 240 1.ft of lintol

Rate per L.ft of lintel


Note:
a. Water available at site.

b.If water is not available allowances must be made for


transport of water

38 Cement concrete in 9" * 9" lintols in ground floor

Consider80 L.ft of lintol = 45 cu.ft concrete

Materials
45.00 cu.ft (25 Mpa) 8.40
Add 10% for wastage 37.80
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 1.20

Curing
Jute Hession -60 sq.ft 0.00
Water - 90 gals 0.00
1 1/2 days U/SK labourer 1.20

Per 45 cube
or 80 1.ft of lintol

Rate per 1.ft of lintel


Note:
a. Water available at site.
b.If water is not available allowances must be made for
transport of water

39 Cement concrete in 9" *12" lintols in ground floor

Consider length 60'0"of lintol = 45 cu.ft concrete

Materials
45.00 cu.ft (25 Mpa) 0.08
Add 10% for wastage 0.38
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 1.20

Curing
Jute Hession -55 sq.ft 0.00
Water - 90 gals 0.00
1 1/2 days U/SK labourer 1.20

Per 45 cube
or 60 L.ft of lintol

Rate per L.ft of lintol


Note:
a. Water available at site.
b.If water is not available allowances must be made for
transport of water

40 Cement concrete in 12" *15" lintols in ground floor

Consider length of 36'0" = 45 cu.ft concrete

Materials
45.00 cu.ft concrete 0.08
Add 10% for wastage 0.38
1 day hire of vibrator 0.00

Labour
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 1.20

Curing
Jute Hession -40 sq.ft 0.00
Water - 90 gals 0.00
1 3/4 days U/SK labourer 1.20

Per 45 cube
or 36 L.ft of lintol

Rate per L.ft of lintol


Note:
a. Water available at site.
b.If water is not available allowances must be made for
transport of water

Timber Form work


41 Sawn timber form work to 9" * 9" cement concrete column in
ground floor

per sq.ft
Consider column length of 5'0"
Concrete area - 15.0 sq.ft.

(a) Making mould


1. Materials
18.15 sq.ft 1" thick class II timber 0.00
17.10 L.ft 2" * 2" class II timber in yokes. 0.00
16.12 L.ft 2" * 1" class II timber battens. 0.00
1 1/2 lb wire nails. 0.00

2. Fabricting
1/2 day carpenter 1.50
1/2 day U/SK labourer 1.20

Total cost
Alowing 4 uses cost of mould per use

(b) Assembling (per use)


Materials
12 Nos. 16mm 18" long bolts (20uses) 0.00
1/2 litre mould oil 0.00
35 L.ft 4" * 2" props (10 uses) 0.00

Labour
1/4 day carpenter 1.50
1/4 day U/SK labourer 1.20

Cost of assembling per use

(c ) Dismantling cleaning & repairing (per use)


Labour
1/4 day carpenter 1.50
1/4 day U/SK labourer 1.20

Cost of dismantling per use

Total cost per use


(For 15.0 sq.ft) i.e (a + b + c )

Rate per square

42 Sawn timber form work to 9" * 9" cement concrete beams in


ground floor

Consider 9" * 12" beam of 20'0" long. Contact area 55 sq.ft.

(A) Making the mould


a. 60 sq.ft 1" timber planks 0.00
b. 24 L.ft 2" * 2" battens 0.00
c. 45 L.ft 2" * 2" ledgers 0.00
d. 30 L.ft 4" * 2" bearers at bottom of mould. 0.00
e. 2 lbs wire nails 0.00

Labour
a. 1 1/2 day carpenter 1.50
b. 2 day U/SK labourer 1.20

Total cost of mould

Assuming 4 uses
cost per use
Add 10% for repairs
cost per use

(B) Assembling
Materials
a. 110 L.ft 4" * 2" vertical props 0.00
b. 80 L.ft 2" * 2" bracing to mould & props 0.00
c. 50 L.ft 2" * 2" bracing to a set of props 0.00
d. 6.0 sq.ft 1" timber base plate to props 0.00
e. 122 Nos wedges 0.00
cost of material assembling.
Assembling an average of 6 uses .
Cost of material per uses

Add 20% of cost of materials for repairs.

Total cost of material per uses

(C) Labour & Sundries


Labour
a. 1 day carpenter 1.50
b. 2 day U/SK labourer 1.20
c. 1 gal mould oil 0.00
d. 2 lbs nails 0.00

Cost per use

( D) Dismantling & cleaning


Labour
a. 1/2 day carpenter 1.50
b. 2 day U/SK labourer 1.20

Cost of labour for dismentling per use

Total cost for making mould assembling aligning dismentling


and cleaning for 55 sq.ft per use.
(A+B+C+D)

Cost of formwork per square

43 Sawn timber formwork for underside of first floor slab


Consider a slab of dismensions 20'0" * 10'0"
Contact area = 2.0 sqrs

(A) Making panels


1) Materials
a. 220 sq.ft 1" thick tongue and grooved timber
planks 0.00
b. 121 L.ft 4" * 2" runners at 2'0" centres. 0.00
c. 4 lbs wire nails. 0.00

2) Labour
a. 3 days carpenter 1.50
b. 3 days U/SK labourer 1.20

Total cost of making panels

Assuming 4 uses cost per use.


Add 20% for repairs.

Total cost of panels per uses

(B) Assembling
Materials
a. 690 L.ft 4" * 2" vertical timber props 0.00
b. 66 L.ft 2" * 2" bracing for props 0.00
c. 122 Nos wedges 0.00
d. 33 sq.ft 1" base platefor props 0.00

Cost of material assembling.


Assembling an average of 6 uses .
Cost of material per uses

Add 20% of cost of materials for repairs.

Total cost of material for assembling per uses

(C) Labour & Sundries for Assembling


a. 1 days carpenter 1.50
b. 4 days U/SK labourer 1.20
c. 1 gal mould oil for assembling 0.00
d. 2 lbs wire nails. 0.00

Total cost per use for Assembling


( D) Dismantling & cleaning
Labour
a.1/2 day carpenter 1.50
b. 2 days U/SK labourer 1.20

Total cost for dismantling per use

Total cost for Assembling per use for 200sq.ft


(A+B+C+D)

Cost of formwork per square

Steel reinforcement
44 Mild steel / for steel reinforcement to lintels slabs beams for
column bent to shape laid in position and tied with G.I. wire
as directed

Materials

1 cwt. M.S./ Tor steel rods including transport to site. 0.00


(Allow for wastage 15%) 0.00
1 1/2 lbs 16 BWG binding wire 0.00

Add 1.5% of steel cost for spacers or chairs. 0.00

Labour
1 day blanksmith 1.50
1 day U/SK labourer 1.20

Rate per cwt

Brick work
45 Brick work in cement sand 1:5 in foundation upto D.P.C

Per cube

Materials
1450 bricks 0.00
Add 5% wastage 0.00
4.00 cwt cement (50 Kg bags) 0.00
0.25 cubes sand 0.00
Water (150 gals) 0.00
Labour
3 days mason 1.50
4 days U/SK labourer 1.20

Rate per cube

46 Brick work in cement sand 1:8 in foundation upto D.P.C

Per cube

Materials
1450 bricks 0.00
Add 5% wastage 0.00
2 1/3 cwt cement (50 Kg bags) 0.00
3/8 cubes sand 0.00
Water (150 gals) 0.00

Labour
3 days mason 1.50
4 days U/SK labourer 1.20

Rate per cube

47 Brick work in cement sand 1:5 in 4 1/2" thick walls in ground


floor.
Per square

Materials
550 bricks 0.00
Add 5% wastage 0.00
1.30 cwt cement (50 Kg bags) 0.00
0.10 cubes sand 0.00
Water (50 gals) 0.00

Labour
1 1/2 days mason 1.50
2 days U/SK labourer 1.20

Rate per square


48 9" thick brick wall cement sand 1:5 in ground floor

Per square

Materials
1090 bricks 0.00
Add 5% wastage 0.00
3.00 cwt cement (50 Kg bags) 0.00
0.20 cubes sand 0.00
Water (115 gals) 0.00
.
Labour
2 1/4 days mason 1.50
3 3/4 days U/SK labourer 1.20
Scaffolding - Add 3% 0.24

Rate per square

49 Brick work 13 1/2" thick in cement sand 1:5 in superstructure


in ground floor

Per square

Materials
1630 bricks 0.00
Add 5% wastage 0.00
4.50 cwt cement (50 Kg bags) 0.00
0.30 cubes sand 0.00
Water (170 gals) 0.00
.
Labour
3 1/2 days mason 1.50
5 1/2 days U/SK labourer 1.20
Scaffolding - Add 2% 0.24

Rate per square

50 9" Brick walls in cement sand 1:8 in superstructure


in ground floor

Per square
Materials
1090 bricks 0.00
Add 5% wastage 0.00
1.75 cwt cement (50 Kg bags) 0.00
0.30 cubes sand 0.00
Water (115 gals) 0.00
.
Labour
2 1/4 days mason 1.50
3 days U/SK labourer 1.20
Scaffolding - Add 3% 0.21

Rate per square

51 4 1/2" thick Brick wall (wire cut) in cement sand 1:5 in ground
floor
(Facing to Brickwork measured seperately)

Per square

Materials
550 weirecut bricks 0.00
Add 2% wastage 0.00
1.20 cwt cement (50 Kg bags) 0.00
0.08 cubes sand 0.00
Water (30 gals) 0.00
.
Labour
1 1/2 days mason 1.50
2 days U/SK labourer 1.20
Scaffolding - Add 5% 0.23

Rate per square

52 9" thick in cement and sand 1:5 with wire cut Bricks

Per square

Materials
1080 weirecut bricks 0.00
Add 4% wastage 0.00
2.50 cwt cement (50 Kg bags) 0.00
0.18cubes sand 0.00
Water (100 gals) 0.00
.
Labour
2 1/4 days mason 1.50
3 3/4 days U/SK labourer 1.20
Scaffolding - Add 3% 0.24

Rate per square

53 13 1/2" thick Brick wall (wire cut) in cement and sand 1:5 in
ground

Per square

Materials
1630 weirecut bricks 0.00
Add 2% wastage 0.00
4.50 cwt cement (50 Kg bags) 0.00
0.30cubes sand 0.00
Water (50 gals) 0.00
.
Labour
3 3/4 days mason 1.50
5 1/2 days U/SK labourer 1.20
Scaffolding - Add 2% 0.24

Rate per square

54 Extra over for facing including raised pointing 1/8" in cement


and sand 1:1 mixture in ground floor

Per square

Materials
0.50 cwt cement (50 Kg bags) 0.00
1.00 cu.ft sand 0.00
1/10 gals acid 0.00
water 10 gals 0.00

Labour
5 days mason 1.50
3 1/2 days U/SK labourer 1.20

Rate per square

55 3" thick floor paved in lime motor 2.5 in ground floor

Per square

Materials
350 bricks 0.00
1.20 cwt slaked lime 0.00
0.11 cubes sand 0.00
water (45 gals) 0.00

Labour
1 1/4 days mason 1.50
2 1/2 days U/SK labourer 1.20

Rate per square

56 Steps 1'-1 1/2" * 0'6" in brick cement and sand 1:5 with 1/2"
thick cement and sand 1:2 redering including necessary
excavation.

Per 10 L.ft

Materials
120 bricks 0.00
0.50 cwt slaked lime 0.00
0.05 cubes sand 0.00
water (15 gals) 0.00

Labour
1/2 days mason 1.50
1/2 days U/SK labourer 1.20

Rate per 10 L.ft

57 Brick drains in cement and sand 1:5, 9" wide and 6"-9"
average depth including cement rendering 1/2" thick 1:2 to
exposed to faces with 1'6" ramp including necessary excavation
Per 10 L.ft

Materials
140 bricks 0.00
0.80 cwt slaked lime 0.00
0.05 cubes sand 0.00
water (20 gals) 0.00

Labour
1 1/4 days mason 1.50
1 1/4 days U/SK labourer 1.20

Rtate per 10 L.ft

Rate per L.ft

58 Brick drains in cement and sand 1:5, 9" wide and 6"-9"
average depth including cement rendering 1/2" thick 1:2 to
exposed to faces with 1'6" ramp including necessary excavation

Per 10 L.ft

Materials
110 bricks 0.00
0.70 cwt slaked lime 0.00
0.05 cubes sand 0.00
water (20 gals) 0.00

Labour
1 days mason 1.50
1 1/4 days U/SK labourer 1.20

Rtate per 10 L.ft

Rate per L.ft

Hollow block masonry


59 8" thick Hollow block work in cement and sand mortar 1:5 in
ground floor (cavities unfilled)

Per square
10'0" * 10'0" area (size of each block 16" * 8")

Materials
112 Hollow cement blocks 0.00
Allow 5% for wastage 0.00
0.75 cwt cement (50 Kg bags) 0.00
0.06 cubes sand 0.00

Labour
1 1/2 days mason 1.50
2 1/2 days U/SK labourer 1.20
Scaffolding - Add 3% 0.15

Rate per squqre

60 4" thick Hollow block masonry in cement and sand mortar 1:5
with cavities unfilled.

Per square
10'0" * 10'0" area (size of each block 16" * 8" * 4")

Materials
112 Hollow cement blocks 0.00
Allow 5% for wastage 0.00
0.40 cwt cement (50 Kg bags) 0.00
0.03 cubes sand 0.00

Labour
1 days mason 1.50
2 days U/SK labourer 1.20
Scaffolding - Add 5% 0.20

Rate per squqre

Random Rubble masonry


61 Random Rubble masonry in cement mortar 1:5 in foundation

Per cube (14" thick)

Materials
1.30 cubes 6" - 9" Rubble 0.00
5.00 cwt cement (50 Kg bags) 0.00
0.30 cubes sand 0.00
water (100 gals) 0.00

Labour
4 days mason 1.50
6 days U/SK labourer 1.20

Rate per cube

62 Random Rubble masonry in cement mortar 1:5 insuperstructure

Per cube (14" thick)

Materials
1.30 cubes 6" - 9" Rubble 0.00
5.00 cwt cement (50 Kg bags) 0.00
0.30 cube sand 0.00
water (100 gals) 0.00

Labour
4 1/2 days mason 1.50
7 days U/SK labourer 1.20
Scaffolding - Add3% 0.44

Rate per cube

Pressed tilling
63 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and
pointing in neat cement in ground floor

Per square

Materials
225 pressed tiles 8" * 8" 0.00
Add 5% for wastage 0.00
1 1/4 cwt cement 0.00
0.07 cubes sand 0.00
1/4 lb wax polish 0.00
1/4 lb coloured pigment 0.00
2 lbs cotton waste 0.00

Labour
4 days mason 1.50
4 days U/SK labourer 1.20
1/2 days U/SK labourer for polishing 1.20

Rate per square

wall tiling and Terra tiles


64 Glazzed tiles fixed to walls including bedding in cement mortar
1:2 and raking in ground floor. (special measured seperately)

Per square

Materials
400 glazed tiles 6" * 6" 0.00
Add 10% for wastage on cutting 0.00
2 1/2 cwt cement (50 Kg bags) 0.00
0.11 cubes sand 0.00
1 lb white cement 0.00

Labour
4 days mason 1.50
4 days U/SK labourer 1.20
1/4 days U/SK labourer for polishing 1.20

Rate per square

65 Terrazo floor tiles on 1/2" thick cement and sand 1:2 in ground
floor.

Per square

Materials
100 12" * 12" Terrazo floor tiles 0.00
Add 5% for wastage 0.00
1 1/4 cwt cement (50 Kg bags) 0.00
0.07 cubes sand 0.00
1/2 lb wax polish 0.00
Coloured pigment 0.00
2 lb cotton waste 0.00

Labour
4 days mason 1.50
4 days U/SK labourer 1.20
1/2 days U/SK labourer for polishing 1.20

Rate per square

Roofing
66 Timber framework for calicut pattorn tile hip roof in single
storey building consisting og wall plate, beam ridge plate,
raftters etc (preservative treatement to be measured seperately)

Per 6.00 squares

Materials
34.00 cu.ft timber 0.00
Add 10% for wastage 0.00
660 L.ft 2" * 1" reepers 0.00
Add 5% for wastage 0.00
8 lbs wire nails 6" long 0.00
2 lbs wire nails 2" long 0.00

Labour
7days carpenter 1.50
8days U/SK labourer 1.20

Total per 6.00 squares

Rate per square

67 Roof covering with calicut pattern clay tiles in single storeyed


building

(Timber framework & ridge covering measured seperately)

Per 6.00 squqre

Materials
750 Tiles 0.00

Labour
3 days carpenter 1.50
3 days U/SK labourer 1.20
Total per 6.00 squares

Rate per square

68 Timber framework for corrugated asbestoes sheet roof in


single.

Per 3.60 sqrs.

Materials
13 1/4 cu.ft timber purlins 0.00
Add 10% for wastage 0.00

Labour
2 1/2 days carpenter 1.50
3 days U/SK labourer 1.20

Total per 3.60 squares

Rate per square

69 Roof covering with currugated asbestoes sheets (Timber frame


work and ridge covering measured seperately)

Per 3.60 sqrs.

Materials
420 sq.ft asbestoes currugated sheets 0.00
72 Nos. roofing screws and washers. 0.00

Labour
1 day carpenter 1.50
2 days U/SK labourer 1.20

Total per 3.60 squares

Rate per square

70 One layer half round clay tiles over corrugated asbestoes roof
covering.
Per square.

Materials
650 half round clay tiles 0.00

Labour
2 days U/SK labourer 1.20

Rate per square

71 Asbestoes close fittings ridging fixed complete with roofing


screws or bolts (hook)

Per 13'4" length

Materials
4 Pairs ridges 3'8" long 0.00
16 Roofing screws or bolts 0.00

Labour
1/4 day carpenter 1.50
1/4 days U/SK labourer 1.20

Per 13'4" ridging

Rate per L.ft

72 Ridging covering with culicut pattern ridge tiles bedded in


cement lime mortar 1:1:4

Per 12 L.ft ridging

Materials
9 ridge tiles 0.00
1/3 cwt cement (50 Kg bags) 0.00
0.02 cubes sand 0.00
15 lbs slaked lime 0.00
1/2 lb Colouring powder 0.00

Labour
1/4 days mason 1.50
1/4 days U/SK labourer 1.20
Per 12 L.ft ridging

Rate per L.ft

73 1/4" * 9" high valance board fixed with brass screws to ends
of rafters (for tile roofing)

Per 100 L.ft

Materials
75.00 sq.ft 1" planks 0.00
Add 5% for wastage 0.00
70 Nos. 1 1/2" brass screws 0.00

Labour
3 day carpenter 1.50
3days U/SK labourer 1.20
Scaffolding - Add 5% 0.18

Total per 100 L.ft

Rate per L.ft

74 3/4" * 9" high barge board fixed with brass screws at 2'0"
centres to sides of rafters.

Per 100 L.ft

Materials
75.00 sq.ft 1" planks 0.00
Add 5% for wastage 0.00
50 Nos. 1 1/2" brass screws 0.00

Labour
3 days carpenter 1.50
3 days U/SK labourer 1.20
Scaffolding - Add 5% 0.18

Total per 100 L.ft

Rate per L.ft


Roof plumbing

75 18 B.W.G.(1.2mm) galvanized iron sheet valley gutter 3'0"


girth over all once bent with end laps not less than 9" width
including 3/4" tongued and grooved planks laid to slope and
profile in timber members.

Consider 15'0"

Materials
2 G.I sheet (8' * 4') 0.00
1/4 gal wood preservative 0.00
0.10 cwt cement (50 Kg bags) 0.00
0.05 cwt slaked lime 0.00
1.00 cu.ft sand 0.00
50.00 sq.ft planks 0.00
2 lbs 1 1/4" wire nails 0.00

Labour
(a) Fixing boarding and applying wood preservative --
1 day carpenter 1.50
1 day carpenter U/SK labourer 1.20
(b) Making and firing G.I sheets --
1/2 day tinker 1.50
1/2 day tinker U/SK labourer 1.50
© Building sides --
1/4 days mason 1.50
1/2 days U/SK labourer 1.20

Total per 15.00 L.ft

Rate per L.ft

76 18 B.W.G.(1.2mm) galvanized iron flashing 1'6" girth overall


3 times bent with end laps not less than 6" width, lead
soldered turned and tucked up to not less than 6" in to chase
cut in wall and pointed in cement mortar 1:2 lower end
dressed over roof covering not less than 1'0" wide

Consider 15'0" L.ft


Materials
1 G.I sheet (8' * 4') 0.00
0.05 cwt cement (50 Kg bags) 0.00
1.00 cu.ft sand 0.00
1 lb soldering lead 0.00

Labour
Cutting bending, soldering & fixing --
1/2 day tinker 1.50
1/8 days mason (caulking) 1.50
1/2 day U/SK labourer 1.20

Total per 15.00 L.ft

Rate per L.ft

77 Timber framework for 4'0" * 4'0" flat asbestoes ceiling


(sheet measured seperately) comprising of 4" * 2" joist and
2" * 2" bearers in class I timber.

Per 1.95 square

Materials
8.00 cu.ft timber class I 0.00
1 lb 2" nails 0.00
26 Nos. fibre/ plastic plugs 0.00
25 lbs cement 0.00
2.00 cu.ft sand 0.00
2" brush - 4 uses 0.00
1/3 gal tarnap 0.00

Labour
2 1/2 days carpenter 1.50
1/2 days mason 1.50
1 1/2 day U/SK labourer 1.20
Scaffolding Add 3% 0.19

Total per 1.95 square

Rate per square

Ceiling
78 Horizontal ceiling lining using 4'0" * 4'0" flat asbetoes cement
sheets fixed with including beading and cove moulding on
timber framework. (Timber frame work & painting measured
seperately)

Per 1.95 square

Materials
210 sq.ft flat asbestoes sheets 0.00
60 L.ft 2" * 2" halmilla cove moulding 0.00
125 L.ft 1 1/2" * 1 1/2" halmilla cove beadings 0.00
1/4 lb 1/4" clout nails 0.00
8 doz 1 1/2" brass screws 0.00

Labour
1 1/2 days carpenter 1.50
2 days U/SK labourer 1.20
Scaffolding Add 3% 0.14

Total per 1.95 square

Rate per square

79 3/4" thick tongued and grooved Lunumidella ceiling boards


fixed horizontal on 4" * 2" class I timber joist at 2'0" centres
with 1 1/2" brass nails.

Consider room 15'0" *13'0"


i.e 1.95 squares

Materials
115 L.ft 4" * 2" timber joist 0.00
215 sq.ft 6" * 3/4" Lunumidella ceiling planks 0.00
3 lbs cement 0.00
4.00 cu.ft sand 0.00
4 Kg 1 1/2" brass nails 0.00

Labour
Making holes, fixing joists & making good.
1day carpenter 1.50
1day mason 1.50
3 day U/SK labourer 1.20
Fixing ceiling boards
3 days carpenter 1.50
4 days U/SK labourer 1.20
Scaffolding Add 4% 0.37

Total per 1.95 square

Rate per square

80 3/4" *6" wide tongued and grooved Lunumidella ceiling boards


fixed underside of roof rafters, (existing) 1 1/2" brass nails
including levelling with timber strips where necessary.

Consider room 15'0" *12'0" = 1.80 squqres

Materials
220.00 sq.ft ceiling planks 0.00
40.00 L.ft 2" * 1/4" timber strips 0.00
4Kg1 1/2" brass nails 0.00
2Kg1 3/4" nails 0.00

Labour
3 days carpenter 1.50
6 days U/SK labourer 1.20
Scaffolding Add 3% 0.35

Total per 1.80 square

Rate per square

Doors and Windows


81 Door single hung 3'3" * 7'0" high overall with frame having
1 1/4" thick shash & 3 1/4" * 2 3/4" frame. (glazing, iron
mongery and painting measured seperately).

Per 22.75 square feet (3'3" * 7'0")

Materials
(a) Frame
1 1/2 cu.ft 4" * 3" timber 0.00
2 No. spur stones 0.00
6 No. fibre/plastic plug with 4" long screws 0.00
2 Nos. 5/8" dia mild steel dowels 4" long 0.00

(b) Sashes
14 sq.ft 1 1/2" planks 0.00
5 sq.ft 1" planks 0.00

Labour
5 days carpenter 1.50
1 1/2 days U/SK labourer 1.20

Total per 22.75 sq.ft

Rate per square feet

82 Door galazed and panneled double hung 4'0" * 7'0" high


overall with frame including 1 1/4" thick sash and 3 3/4"*2 3/4"
frame.(glazing,iron mongery and painting measured seperately)

Per 28.00 square feet (4'0" * 7'0")

Materials
(a) Frame
1 2/3 cu.ft 4" * 3" timber 0.00
2 No. spur stones 0.00
6 No. fibre/plastic plug with 4" long screws 0.00
2 Nos. 5/8" dia mild steel Dowels 4" long 0.00

(b) Sashes
16 sq.ft 1 1/2" planks 0.00
7 sq.ft 1" planks 0.00

Labour
6 days carpenter 1.50
2 days U/SK labourer 1.20

Total per 28.00 square

Rate per square feet

83 Plywood door single hung 3'1 1/2" * 6'1 1/2" overall with
frame having 1 1/4" thick sash and 3 1/4" * 2 3/4" frame.
(iron mongery and painting measured seperately)

Per 21.75 square feet (4'0" * 7'0")

Materials
(a) Frame
1.80 cu.ft 4" * 3" timber 0.00
2 No. spur stones 0.00
6 No. fibre/plastic plug with 4" long screws 0.00

(b) Sashes
1 No. 6'9" * 2'9" plywood sash. 0.00

Labour
3/4 day carpenter 1.50
3/8 day U/SK labourer 1.20
1/4 day mason (Fixing frame) 1.50
1/4 day U/SK labourer (- do -) 1.20

Total per 21.75 square feet

Rate per square feet

84 Door ledged, braced and battened single hung 2'6" * 6'6"


overall with frame having 7/8" thich tongued & grooved planks
and 3 3/4"*2 3/4" frame(iron mongery and painting measured
seperately)

Materials
(a) Frame
1.70 cu.ft 4" * 3" timber 0.00
2 No. spur stones 0.00
6 No. fibre/plastic plugs with 0.00
2 No. 5/8" mild steel dewels 4" long screws. 0.00

(b) Sashes
21.00 sq.ft 1" thick planks 0.00
3 doz. 1 1/4 long brass screws. 0.00

Labour
2 1/2 day carpenter 1.50
1 day U/SK labourer 1.20
1day mason (Fixing frame) 1.50
1/4 day U/SK labourer (- do -) 1.20

Total per 16.25 square feet

Rate per square feet

85 Window, glazed 7'0" * 4'0" high overall with frame comprising


3 No openable sashes and 3 3/4" * 2 3/4" frame and mullions.
(glazing,iron mongery and painting measured seperately)

Per window 7'0" * 4'0" (sashes) = 28.00 sq.ft

Materials
(a) Frame
3.20 cu.ft 4" * 3" timber 0.00
4 No. fibre/plastic plugs with 4" long brass screws 0.00

(b) Sashes
9.25 sq.ft 3" * 1 1/2" timber 0.00

Labour
6 days carpenter 1.50
2 1/2 days U/SK labourer 1.20
1/2 day mason (Fixing frame) 1.50
1/2 day U/SK labourer (- do -) 1.20

Total per 28.00 square feet

Rate per square feet

86 1/4" clear sheet glass panes exceeding 1'0" but not exceedingly
4 square feet cut and fixed with timber beadings to doors and
windows.

Consider sash 3'0" * 4'0" high with 3" * 1 1/4" style and 4Nos
glass panes.

Per 9.00 sq.ft


Materials
9.00 sq.ft glass panes 0.00
30 L.ft 1/2" * 1/2" beading 0.00
4 doz. Brass panel pins 0.00

Labour
1/2 day glazier 1.50
1/2 day U/SK labourer 1.20

Total per 9.00 square feet

Rate per square feet

Iron mongaries
87 Ironmongery

Btt hinges 5" * 2 1/2"

Materials
1 1/4 mullion butt hinges 0.00
2 doz. 3/4" brass screws 0.00

Labour
1/2 day carpenter 1.50
1/2 day U/SK labourer 1.20

Total per 1 1/2 pairs

Rate per pairs

88 Tee hinges 6" * 12"

Materials
1 pair Tee hinges 0.00
1 1/2 doz. 3/4" iron screws 0.00

Labour
2 hrs carpenter 0.19
2 hrs U/SK labourer 0.15

Rate per pairs


89 Rim lock

Materials
1 rim lock with screws 0.00

Labour
2 hrs carpenter 0.19
2 hrs U/SK labourer 0.15

Rate per No.

90 Mortice lock

Materials
1Mortice lock with screws 0.00

Labour
1/2 day carpenter 1.50
1/2 day U/SK labourer 1.20

Rate per No.

91 Casement stays

Materials
4 Casement stays 0.00
16 - 1/2" brass screws 0.00

Labour
2 hrs carpenter 0.19
2 hrs U/SK labourer 0.15

Total for 4 No.

Rate per No.

92 Door closer (Hydraulic)

Materials
1 Door closer 0.00
8 - 3/4" brass screws 0.00

Labour
2 hrs carpenter 0.19
2 hrs U/SK labourer 0.15

Rate per No.

93 Tower / skeleton brass bolts.

Materials
1 Tower / skeleton brass bolt. 0.00
10- 1/2" brass screws 0.00

Labour
1/2 hr carpenter 0.19
1/2 hr U/SK labourer 0.15

Rate per No.

94 Barrel bolt 4"

Materials
1 Barrel bolt. 0.00
8- 1/2" brass screws 0.00

Labour
1/2 hr carpenter 0.19
1/2 hr U/SK labourer 0.19

Rate per No.

95 Casement fasteners

Materials
6 Casement fasteners 0.00
24 - 1/2" brass screws 0.00

Labour
1/2 day carpenter 1.50
1/2 day U/SK labourer 1.20
Total for 6 No.

Rate per No.

96 Spring loadea fanlight catches.

Materials
6 brass fanlight catches. 0.00
2 doz 1/2" brass screws 0.00

Labour
1/2 day carpenter 1.50
1/2 day U/SK labourer 1.20

Total for 6 No.

Rate per No.

97 Draw rings

Materials
6 Draw rings 0.00
1 doz 1/2" brass screws 0.00

Labour
1 hr carpenter 0.19
1 hr U/SK labourer 0.15

Total for 6 No.

Rate per No.

Plastering
98 3/4" thick DPC, in cement sand 1:2 finished with 2 coats not
tar & blinded with sand.

Per square

Materials
2.25 cwt cement 0.00
0.11 cube sand 0.00
1 1/2 gals bitumen 0.00
Firewood (10 lbs) 0.00
Water 10 gals 0.00

Labour
1 1/2 days mason 1.50
2 1/2 days U/SK labourer 1.20

Rate per square

99 5/8" thick plastering to wall in lime and sand 2:5 including


floating with lime putty.

Per square

Materials
1.30 cwt slaked lime. 0.00
0.07 cube sand 0.00
Water 10 gals 0.00

Labour
1 days mason 1.50
2 3/4 days U/SK labourer 1.20
Scaffolding - Add 3% 0.14

Rate per square

100 5/8" thick plastering to wall in cement and sand 1:3 including
cement floating .

Per square

Materials
1.40 cwt cement (50 Kg bags). 0.00
0.06 cube sand 0.00
Water 10 gals 0.00

Labour
1 day mason 1.50
1 1/2 days U/SK labourer 1.20
Scaffolding - Add 3% 0.10
Rate per square

101 3/8" thick plastering to soffit slab in cement and sand 1:3
including floating with lime putty.

Per square

Materials
0.80 cwt cement (50 kg bags) 0.00
0.16 cwt slaked lime. 0.00
0.05 cubes sand 0.00
Water 10 gals 0.00

Labour
2 1/2 days mason 1.50
2 1/2 days U/SK labourer 1.20
Scaffolding - Add 3% 0.20

Rate per square

102 3/8" thick plastering to sides and soffit of beams in cement


and sand 1:3 including floating with lime putty.

Per square

Materials
0.80 cwt cement (50 kg bags) 0.00
0.16 cwt slaked lime. 0.00
0.03 cubes sand 0.00
Water 5 gals 0.00

Labour
2 days mason 1.20
2 days U/SK labourer 1.20
Scaffolding - Add 3% 0.14

Rate per square

103 5/8" thick plastering to wall in lime cement and sand 1:1:5
finished semi - rough with wooden float
Per square

Materials
0.80 cwt cement (50 Kg bags). 0.00
0.40 cwt slaked lime. 0.00
0.07 cubes sand 0.00
Water 10 gals 0.00

Labour
1 day mason 1.50
1 1/2 days U/SK labourer 1.20
Scaffolding - Add 3% 0.10

Rate per square

104 5/8" thick plastering to wall in lime cement and sand 1:1:5
finished smooth with lime putty floating

Per square

Materials
0.80 cwt cement (50 Kg bags). 0.00
0.60 cwt slaked lime. 0.00
0.07 cubes sand 0.00
Water 10 gals 0.00

Labour
1 1/2 day mason 1.50
1 1/2 days U/SK labourer 1.20
Scaffolding - Add 3% 0.12

Rate per square

105 1/2" thick rendering in cement and sand 1:3 finished smooth.

Per square

Materials
1.07cwt cement (50 Kg bags). 0.00
0.05 cubes sand 0.00
Water 10 gals 0.00
Labour
1 day mason 1.50
1 1/2 days U/SK labourer (Curing) 1.20

Rate per square

106 1/2" thick rendering in cement and sand 1:2 in floors, finished
smooth.

Per square

Materials
1.50 cwt cement (50 Kg bags). 0.00
0.05 cubes sand 0.00
Water 10 gals 0.00

Labour
1 day mason 1.50
1 1/2 days U/SK labourer (Curing) 1.20
1 1/2 days U/SK labourer 1.20

Rate per square

107 3/4" thick rendering in cement and sand 1:3 finished smooth.

Per square

Materials
1.75 cwt cement (50 Kg bags). 0.00
0.08 cubes sand 0.00
Water 10 gals 0.00

Labour
1 1/4 day mason 1.50
2 days U/SK labourer 1.20
1/4 days U/SK labourer (Curing) 1.20

Rate per square

108 3/4" thick rendering in cement and sand 1:2 in floors, finished
smooth.

Per square

Materials
2.25 cwt cement (50 Kg bags). 0.00
0.08 cubes sand 0.00
Water 10 gals 0.00

Labour
1 1/4 day mason 1.50
1/4 days U/SK labourer (Curing) 1.20
2 days U/SK labourer 1.20

Rate per square

109 3/4" thick rendering in cement and sand 1:2 in coloured


cement floors, finished smooth.

Per square

Materials
2.25 cwt cement (50 Kg bags). 0.00
5 lbs powdered pigment 0.00
0.08 cubes sand 0.00
Water 10 gals 0.00

Labour
1 1/4 day mason 1.50
1/4 days U/SK labourer (Curing) 1.20
2 days U/SK labourer 1.20

Rate per square

110 1/2" * 6" skirting in cement & sand 1:3 projected or flush to
walls finished with floating including forming groove.

Per 10 L.ft

Materials
0.10 cwt cement (50 Kg bags). 0.00
0.25 lbs powdered pigment 0.00
0.003 cubes sand 0.00

Labour
3/8 day mason 1.50
5/16 days U/SK labourer 1.20

Total per 10 L.ft

Rate per L.ft

Note: Where coloured skirting is not required deleta provision


for powdered pigment

Painting & Decorating


111 Prepare and apply one coat of preservative (oil type) to
structural timber including touching up cut ends etc.After fixing.

Per square

Materials
2.75 ltr. Wood preservative (oil type) 0.00
3" brush (1/10 use) 0.00

Labour
3/4 day painter 1.50
1/2 day U/SK labourer 1.20

Rate per square

112 Prepare surface of steel truss and apply two coats of


anticorrosive primer

Consider one square

Materials
2 1/4 ltr. Anti - corrosive primer 0.00
0.15 ltr. Mineral turpentine or thinner 0.00
1 wire brush 0.00
2" brush (1/8 use) 0.00

Labour
1 1/2 day painter 1.50
1/2 day U/SK labourer 1.20

Rate per square

113 Apply one coat of anti - corrosive primer two coats enamel
paint on already shop primed and erected steel roof truss.

Consider one square

Materials
0.20 ltr. Anti - corrosive primer 0.00
0.20 ltr. Mineral turpentine or thinner 0.00
1 1/3 ltr. Enamel paint 0.00
2" brush (1/5 use) 0.00

Labour
2 1/2 day painter 1.50
1 day U/SK labourer 1.20
Scaffolding - Ad 3% 0.15

Rate per square

114 Prepare and apply two coats primer and finishing coat of
enamel paint to mild steel (angle/ flat)

Consider 50 sq.ft

Materials
1 1/2 ltr. Anti - corrosive primer 0.00
0.20 ltr. Mineral turpentine or thinner 0.00
2/3 ltr. Enamel paint 0.00
1/2 wire brush 0.00
2" brush (1/5 use) 0.00

Labour
1/2 day painter 1.50
3/4 day U/SK labourer 1.20

total for 50 sq.ft.

Rate per square


115 Painting steel on new work with two coats of anti - coropsive
paint.

Per square

Materials
2/3 ltr. Anti - corrosive primer 0.00
2" brush (1/5 use) 0.00

Labour
1 1/2 day painter 1.50

Rate per square

116 Painting new timber work with two coats wood preservative

Per square

Materials
1/2 gal wood preservative 0.00
2" brush (1/5 use) 0.00

Labour
1/2 day painter 1.50

Rate per square

117 Preparing and painting wood work with primer and 2 coats
enamel paint

Per square

Materials
3/4 ltr. Primer 0.00
2.50 ltr. Enamel paint (2 coats) 0.00
2" brush (1/10 use) 0.00
2 sand papers 0.00

Labour
1 1/2 day painter 1.50
1/2 day U/SK labourer 1.20
Rate per square

118 White or colour washing two coats in single storey

Per 10 squares

Materials
0.50 cwt boiled lime 0.00
2 lbs salt 0.00
1/2 lb yellow ochre. 0.00
2 blue 0.00
2" brush (1/3 use) 0.00
Water 10 gals 0.00

Labour
1 1/2 day painter 1.50
2 1/2 day U/SK labourer 1.20
Scaffolding - Add 3% 0.16

Total per 10.00 squares.

Rate per square

119 White or colour washing two coats in single storey

Per 10 squares

Materials
0.50 cwt boiled lime 0.00
2 lbs salt 0.00
1/2 lb yellow ochre. 0.00
2 blue 0.00
2" brush (1/3 use) 0.00
Water 10 gals 0.00

Labour
1/2 day painter 1.50
1/2 day U/SK labourer 1.20
Scaffolding - Add 3% 0.04

Total per 10.00 squares.


Rate per square

120 Prepare and apply one coat of alkali resistant premier and two
coats of emulsion paint to walls

Per squares

Materials
Primer 0.90 ltr. 0.00
1.40 ltr. Emulsion paint 0.00
Water 0.10 gals 0.00
6" brush (1/10 use) 0.00
2 sand papers 0.00

Labour
1 1/4 day painter 1.50
Scaffolding - Add 3% 0.06

Rate per square

121 Cement washing to walls of single storeyd building 2 coats

Per 10 squares

Materials
5/8 cwt cement 0.00
1 - 6" coir brush 0.00
Water 5 gals 0.00

Labour
2 days painter 1.50
2 days U/SK labourer 1.20
Scaffolding - Add 3% 0.16

Total per 10.00 squares.

Rate per square

122 Painting walls with emulsion paint (2 coats)


Per square
1st coat - 1/6 gal emulsion paint 0.00
2nd coat - 1/7 gal emulsion paint 0.00
6" brush (1/10 use) 0.00
0.10 gals water 0.00

Labour
3/4 days painter 1.50
Scaffolding - Add 3% 0.03

Rate per square

123 Prepare and apply one coat of alkali resistant premier and two
coats of emulsion paint to soffit of slabs.

Per 1.00 squares

Materials
0.90 ltr primer. 0.00
1.40 ltr. Emulsion paint 0.00
6" brush (1/10 use) 0.00

Labour
1 3/4 day painter 1.50
Scaffolding - Add 3% 0.08

Rate per square

124 Varnishing two coats with copal varnishing after sandpapering

Per squares

Materials
0.40 gals (1.80 ltre.) Varnishing 0.00
3" brush (1/13 use) 0.00

Labour
1/2 day painter 1.50
1/2 days U/SK labourer 1.20

Rate per square


125 Wax polishing to timber in panels & floors

Per squares

Materials
3/4 lb. wax polish 0.00
1/2 doz. Sheets sandpaper 0.00
1/10 floor brush 0.00
1/2 yards flannel cloth 0.00

Labour
3 hrs. U/SK labourer 0.15

Rate per square

126 Plumbing (PVC)


1/2" diameter PVC pipes fixed to walls (specials paid
seperatyely)

Per 10 L.ft

Materials
13 L.ft pipes 0.00
3 clips and nails 0.00
2 grms. Solvent cement 0.00

Labour
1 hr. Plumber 0.19
1 hr. U/SK labourer 0.15

Total per 10 L.ft

Rate per L.ft

127 3/4" diameter PVC pipes fixed to walls (specials paid


seperatyely)

Per 10 L.ft

Materials
13 L.ft pipes 0.00
3 clips and nails 0.00
3 grms. Solvent cement 0.00

Labour
1 hr. Plumber 0.19
1 hr. U/SK labourer 0.15

Total per 10 L.ft

Rate per L.ft

128 1" diameter PVC pipes fixed to walls (specials paid


seperatyely)

Per 100 L.ft

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8- 1" dia sockets. 0.00
35 clips and nails 0.00
32 grms. Solvent cement 0.00

Labour
1/2 day Plumber 1.50
1/2 day U/SK labourer 1.20

Total per 100 L.ft

Rate per L.ft

129 1 1/4" diameter PVC pipes fixed to walls (specials paid


seperatyely)

Per 100 L.ft

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8- 1 1/4" dia sockets. 0.00
35 clips and nails 0.00
48 grms. Solvent cement 0.00
Labour
3/4 day Plumber 1.50
3/4day U/SK labourer 1.20

Total per 100 L.ft

Rate per L.ft

130 1 1/2" diameter PVC pipes laid to walls (specials paid


seperatyely)

Per 100 L.ft

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8- 1 1/2" dia sockets. 0.00
33 clips and nails 0.00
64 grms. Solvent cement 0.00

Labour
3/4 day Plumber 1.50
3/4day U/SK labourer 1.20

Total per 100 L.ft

Rate per L.ft

131 2" diameter PVC pipes laid to walls (specials paid


seperatyely)

Per 100 L.ft

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8 - 2" dia sockets. 0.00
35 clips and nails 0.00
112 grms. Solvent cement 0.00

Labour
3/4 day Plumber 1.50
3/4day U/SK labourer 1.20

Total per 100 L.ft

Rate per L.ft

132 3" diameter PVC pipes fixed to walls (specials paid


seperatyely)

Per 100 L.ft

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8 - 3" dia sockets. 0.00
35 clips and nails 0.00
200 grms. Solvent cement 0.00

Labour
1 day Plumber 1.50
1 day U/SK labourer 1.20

Total per 100 L.ft

Rate per L.ft

133 Excavation for laying 1/2" to 3" diameter PVC pipes in ground
not less than 1" - 6" deep, back filling & compacting

Per 100 L.ft

Labour
2 1/4 days U/SK labourer 1.20

Total per 100 L.ft

Rate per L.ft

134 Chasing brickwork for laying 1/2" to 1 12" diameter PVC


pipes and making good average depth 2" (Pipes & specials
paid seperately)

Per 100 L.ft

Materials
0.10 cwt cement 0.00
0.01 cubes sand 0.00

Labour
3 days mason 1.50
3 days U/SK labourer 1.20

Total per 100 L.ft

Rate per L.ft

135 Chasing brickwork for laying 1/2" to 3" diameter PVC


pipes in ground or floor and making good. Average depth 3"
(Pipes & specials measured seperately)

Per 100 L.ft

Materials
0.20 cwt cement 0.00
0.03 cubes sand 0.00

Labour
3 1/2 days mason 1.50
3 1/2 days U/SK labourer 1.20

Total per 100 L.ft

Rate per L.ft

136 1/2" elbows PVC specials viz - elbows / bends / sockets.

Per 10 specials

Materials
10 - 1/2" elbows / bends / sockets 0.00
20 grms. Solvent cement 0.00
Labour
2 hrs plumber 0.19

Total per 10 No.

Rate per No.

137 3/4"dia PVC specials viz - elbows / bends / sockets.

Per 10 specials

Materials
10 - 3/4" elbows / bends / sockets 0.00
30 grms. Solvent cement 0.00

Labour
2 hrs plumber 0.19

Total for 10 No.

Rate per No.

138 1" dia PVC specials viz - elbows / bends / sockets.

Per 10 specials

Materials
10 - 1" elbows / bends / sockets 0.00
40 grms. Solvent cement 0.00

Labour
2 hrs plumber 0.19

Total for 10 No.

Rate per No.

139 1 1/4" dia PVC specials viz - elbows / bends / sockets.

Per 10 specials
Materials
10 No - 1 1/4" elbows / bends / sockets 0.00
60 grms. Solvent cement 0.00

Labour
2 hrs plumber 0.19

Total for 10 No.

Rate per No.

140 1 1/2" dia PVC specials viz - elbows / bends / sockets.

Per 10 specials

Materials
10 No - 1 1/2" elbows / bends / sockets 0.00
80 grms. Solvent cement 0.00

Labour
1/2 day plumber 1.50

Total for 10 No.

Rate per No.

141 2" dia PVC specials viz - elbows / bends / sockets.

Per 10 specials

Materials
10 No - 2" elbows / bends / sockets 0.00
140 grms. Solvent cement 0.00

Labour
1/2 day plumber 1.50

Total for 10 No.

Rate per No.


142 2 1/2" dia PVC specials viz - elbows / bends / sockets.

Per 10 specials

Materials
10 No - 2 1/2" elbows / bends / sockets 0.00
200 grms. Solvent cement 0.00

Labour
1/2 day plumber 1.50

Total for 10 No.

Rate per No.

143 3" dia PVC specials viz - elbows / bends / sockets.

Per 10 specials

Materials
10 No - 3" elbows / bends / sockets 0.00
240 grms. Solvent cement 0.00

Labour
1/2 day plumber 1.50

Total for 10 No.

Rate per No.

144 1/2" dia. PVC specials viz.Tees.

Per 10 Tees

Materials
10 No - 1/2" dia tees 0.00
30 grms. Solvent cement 0.00

Labour
1/2 day plumber 1.50

Total for 10 No.


Rate per No.

145 3/4" dia. PVC specials viz.Tees.

Per 10 Tees

Materials
10 No - 3/4" dia tees 0.00
45 grms. Solvent cement 0.00

Labour
1/2 day plumber 1.50

Total for 10 No.

Rate per No.

146 1" dia. PVC specials viz.Tees.

Per 10 Tees

Materials
10 No - 1"dia tees 0.00
60 grms. Solvent cement 0.00

Labour
1/2 day plumber 1.50

Total for 10 No.

Rate per No.

147 1 1/4" dia. PVC specials viz.Tees.

Per 10 Tees

Materials
10 No - 1 1/4" tees 0.00
90 grms. Solvent cement 0.00
Labour
1/2 day plumber 1.50

Total for 10 No.

Rate per No.

148 1 1/2" dia. PVC specials viz.Tees.

Per 10 Tees

Materials
10 No - 1 1/2" dia tees 0.00
120 grms. Solvent cement 0.00

Labour
1 day plumber 1.50

Total for 10 No.

Rate per No.

149 2" dia. PVC specials viz.Tees.

Per 10 Tees

Materials
10 No - 2" dia tees 0.00
210 grms. Solvent cement 0.00

Labour
1 day plumber 1.50

Total for 10 No.

Rate per No.

150 2 1/2" dia. PVC specials viz.Tees.

Per 10 Tees
Materials
10 No - 2 1/2" tees 0.00
300 grms. Solvent cement 0.00

Labour
1 1/2 day plumber 1.50

Total for 10 No.

Rate per No.

151 3" dia. PVC specials viz.Tees.

Per 10 Tees

Materials
10 No - 3" tees 0.00
360 grms. Solvent cement 0.00

Labour
1 1/2 day plumber 1.50

Total for 10 No.

Rate per No.

External drainage (EW pipes)


152 4" dia glazed earthanware pipes laid on 6" thick bedding in
cement concrete 1:3:6 (1 1/2") including excavation average
2'0" depth, backfilling with selected excavated materials and
concrete hauncing to joints.

Per 100 L.ft

Materials
50 No - 4" dia PVC pipes 0.00
0.75 cubes cement concrete 1:3:6 (1 1/2") 8.40
2 lbs. yarn 0.00
0.50 cwt cement (Jointing) 0.00
4.00 cubes excavated soil 0.00

Labour
Laying concrete bedding
1 1/2 days U/SK labourer 1.20
Laying & testing pipes
2 days plumber 1.50
2 days U/SK labourer 1.20
Backfilling - 2 1/2 days U/SK labourer 1.50

Total per 100 L.ft.

Rate per L.ft.

Plumbing (C.I pipes)


153 4" dia C.I dia soil / vent pipe fixed vertically to wall jointed
with cement caulking (Specials measured seperately)

Per 6'0" length

Materials
6'0" L.ft 4" dia C.I pipe 0.00
Add 10% wastage 0.00
5/16 lbs. yarn 0.00
1 - Timber plug 6" * 6" * 2" 0.00
2 - 3" Iron screws 0.00
2 lbs. cement 0.00

Labour
1/4 day plumber 1.50
1/4 day U/SK labourer 1.20
Scaffolding - Add 5% 0.03

Total for 6 L.ft.

Rate per L.ft.

154 4" dia C.I dia pipe fixed to walls jointed with lead caulking
(Specials measured seperately)

Per 6'0" length

Materials
6'0" L.ft 4" dia C.I pipe 0.00
Add 10% wastage 0.00
6 lbs lead 0.00
5/16 lbs. yarn 0.00
1 - Timber plug 6" * 6" * 2" 0.00
2 - 3" Iron screws 0.00
1/16 cwt firewood 0.00

Labour
1/4 day plumber 1.50
1/4 day U/SK labourer 1.20
Scaffolding - Add 5% 0.03
Add - 10% for sundries in cement and cement 0.07

Total for 6 L.ft.

Rate per L.ft.

Manholes & Gulleys


155 4" dia stoneware gulley with 6" *6" *6" gulley box including
excavation, 4" cement concrete 1:2:4 (3/4") base, surrounding
by 4 1/2" thick cement and sand 1:5 extended 6" above top of
gulley box including making connection 1/2" cement and sand
1:2 rendering internally and exposed faces finished smooth
with neat cement floating and providing C.I. grating on top
of gulley.

Per No.

Materials
1 - 4" S.W gulley 0.00
4.00 cu.ft excavation 0.00
5.50 sq.ft 4 1/2" brickwork 0.05
0.80 cu.ft cement concrete 1:2:4 (3/4") 8.40
1.00 sq.ft 1/2" cement rendering 1:2 0.05
1 - 4" C.I grating. 0.00

Labour
1/2 day mason 1.50
1/2 day U/SK labourer 1.20

Rate per No.

156 Manhole 2'0" * 2'0" internally with invert depth not exceeding
2'0" including excavation, backfilling 6" cement concrete
1:2:4 (3/4") base with 3/8"dia meter mild steel rods at 4"
centres hothways, forming channels and benching in similar
concrete, 4 1/2'" walls in brick in cement 1:5, 1/2" thick
cement and sand 1:2 rendering internally and exposed surfaces
including channels, benching and 2" thick RCC removable
cover slab 2'3" * 2'3" inlet and outlet connection all complete
to working order.

Materials
35.00 cu.ft excavation 0.00
7.00 cu.ft cement concrete 1:2:4 (3/4") - 8.40
33.00 sq.ft 4 1/2" brickwork in cement 1:5 0.05
28.00 sq.ft 1/2" cement rendering 1:2 0.05

Labour
1 1/2 day mason 1.50
2 1/2 day U/SK labourer 1.20

Rate per No.

Sanitary fittings
157 22" * 16" glazed fire clay wash basin with 1/2" dia chromium
plated waste chain and stay, including fixing wash basin on
brackets.(Water supply and waste water connection measured
seperately)

Per No.

Materials
1 - wash basin complete with brackets 0.00
1 - 1/2" tap 0.00
waste plug and chain 0.00
4 - wooden plugs 0.00
6 - 1 1/2" brass screws 0.00
2 lbs cement 0.00

Labour
1/2 day mason 1.50
1 day U/SK labourer 1.20

Rate per No.


158 Sink 24" * 15" * 7" overall vitreous china with rubber plug &
chromium plated chain waste carried on iron brackets painted
and fixed to walls, (Water supply and waste water connection
measured seperately)

Per No.

Materials
1 - sink 24" * 15" * 7" 0.00
2 - L iron brackets 0.00
2 - lbs cement 0.00
2 - tapered wooden blocks 2" thick 0.00
8 - 1 1/2" dia brass screws 0.00

Labour
1/2 day mason 1.50
1 day U/SK labourer 1.20

Rate per No.

159 Closet pedestal type with L/L flushing cistern, flush pipe
double plastic seat cover, 1/2" dia stop cock, trap supplied &
fixed complete to working order.

Per No.

Materials
1 - low level suite complete 0.00
1 - 1/2" dia stop cock 0.00
2 - lbs cement 0.00
1/4 cu. ft sand 0.00
2 - 1 1/2" dia brass screws 0.00

Labour
1/4 day mason 1.50
1 day plumber 1.50
1 day U/SK labourer 1.20

Rate per No.

160 Closet squatting type with trap including high level cistern fixed
complete with flush pipe and 1/2" dia stop cock, all complete
to working order.

Per No.

Materials
1 - squqrting pan with trap 0.00
2 - gals C.I cistern with 1 1/4" flush, pipe, chain & over flow 0.00
pipe.
1 - Clip 0.00
5 - Wooden plugs 0.00
1 doz. - 1 1/2" brass screws 0.00
1 - 1/2" stop cock 0.00
1/4 cwt cement 0.00
1/2 cu.ft metal 0.00
1/4 cu.ft sand 0.00

Labour
1/2day mason 1.50
1 day plumber 1.50
1 day U/SK labourer 1.20

Rate per No.

161 Vitreous china bidet suite fixed complete to working order.

Per No.

Materials
1 - bidet 0.00

Labour
1 day plumber 1.50
1 day U/SK labourer 1.20

Rate per No.

162 4 No. Rowl type urinal with trap and 2 gals capacity
autommatic flushing cistern & speaders compplete to working
orders

Materials
4 - urinal Bowls 0.00
1 - 2 gal. cistern 0.00
8 - Rawl plug 0.00
1 - spreader 0.00
4 - Wooden plugs 0.00
4 - 1 1/2" brass screws 0.00
4 - lbs.cement 0.00
1/8 cu.ft sand 0.00

Labour
1/4day mason 1.50
1 day plumber 1.50
1 day U/SK labourer 1.20

Total per No
Rate per No.

Gutters & Downpipes


163 6" dia half round PVC eaves guter fixed to timber valance
board including gutter joiner and brackets fixed at 18' centres.
(Other specials paid seperately)

Consider 24.00 L.ft

Materials
2 - 6" dia eaves gutter lengths 0.00
1 - joiner 0.00
17 - gutter brackets 0.00
34 - 3/4" brass screws 0.00
20 grms. Solvent cement 0.00

Labour
1/2 day plumber 1.50
1/2 day U/SK labourer 1.20
Scaffolding - Add 5% 0.09

Total per 24.00 L.ft

Rate per L.ft.

164 6" dia PVC gutter head


Consider 1 No. gutter head

Materials
1 - PVC gutter 0.00
1 - gutter joiners 0.00
2 - gutter brackets 0.00
12 grms. Solvent cement 0.00
4 - 3/4" brass screws 0.00

Labour
1/8 day plumber 1.50
1/8 day U/SK labourer 1.20
Scaffolding - Add 5% 0.02

Total perNo

Rate per No.

165 6" dia PVC mitres

Consider 1 No. mitre

Materials
1 - mitre bend 0.00
2 - gutter joints 0.00
2 - brackets 0.00
12 grms. Solvent cement 0.00
4 - 3/4" brass screws 0.00

Labour
1/8 day plumber 1.50
1/8 day U/SK labourer 1.20
Scaffolding - Add 5% 0.02

Rate per No.

166 6" dia PVC and caps

Consider 1 No.& cap

Materials
1 No. end cap 0.00
12 grms. Solvent cement 0.00

Labour
1/16day plumber 1.50
1/16 day U/SK labourer 1.20
Scaffolding - Add 5% 0.01

Rate per No.

167 3 1/2" dia PVC rain water down pipes fixed to brickwall with
wooden plugs buried in wall.(special measured seperately)

Consider 24 L.ft pipe length

Materials
2 - 3 1/2" dia pipe lengths 0.00
1 - 3 1/2" joiner 0.00
4 - PVC straps 0.00
8 - 1" brass screws 0.00
30 grms. Solvent cement 0.00

Labour
1/3 day plumber 1.50
1/3 day U/SK labourer 1.20
Scaffolding - Add 5% 0.05

Total rate per 24 L.ft

Rate per L.ft.

168 3 1/2" dia PVC elbow

Materials
1 - 60o80' elbows 0.00
32 grms. Solvent cement 0.00

Labour
1/16day plumber 1.50
1/16 day U/SK labourer 1.20
Scaffolding - Add 5% 0.01
Rate per No.

169 3 1/2" dia PVC shoe

Materials
1 - 60o80' elbows 0.00
15 grms. Solvent cement 0.00

Labour
1/16 day plumber 1.50
1/16 day U/SK labourer 1.20

Rate per No.


MAIN MENU
of Basic cost
machinery

d and three
CONVERT
M Ft
0 0

FT M
0 0

CONVERT
0.00 Sq 0 M2
0.00 Cu 0 M3
0.00 M3 0 cu.ft
0.00 horse power 0 watts

ound to 3rd floor


Amount MAIN MENU

Description

12.00

12.00

1.20

2.25

2.25

1.20

1.20
3.00

3.00

4.20

4.20

3.60

3.60

3.00

3.00
0.00
0.00
0.00
0.00

1.20
2.40

3.60

1.80
0.60
0.60

3.00

0.30

Description

0.00
0.00

0.60

0.60
Description

1.20

1.20

0.00
0.00
1.50

1.50

2.40

2.40

0.00
0.00

2.40
2.40

3.00

0.60

0.60
0.00

4.20

Description

0.00
0.00

1.50
3.60
5.10

3.40
0.00
0.00

3.00
7.20

10.20

6.80

0.00
0.00

12.00
24.00
36.00

8.00
Description

0.00
0.00
0.00
0.00
0.00

1.20
7.20

8.40
0.00
0.00
0.00
0.00
0.00

1.20
7.20

8.40

0.00
0.00
0.00
0.00
0.00

1.20
7.20

8.40
0.00
0.00
0.00
0.00
0.00

1.20
7.20

8.40

0.00
0.00
0.00
0.00
0.00

1.20
7.20
8.40

1.40
0.14

0.15
0.60

2.29

2.10
0.21

0.15
0.60

3.06
4.20
0.21
0.00

0.60
1.50

6.51

3.78
0.38
0.00

1.20
1.50
3.60
1.20
0.00
0.00
1.20

12.86

28.57
0.05

3.78
0.38
0.00

1.50
1.50
1.20
3.60

0.00
0.00
1.80

13.76
13.76

30.57
0.08
3.78
0.38
0.00

1.50
1.50
1.20
3.60

0.00
0.00
0.60

12.56
12.56

27.91
0.42
3.78
0.38
0.00
0.00
0.00

1.50
1.50
1.20
3.60

1.80

13.76
13.76

27.52
0.28
3.78
0.19
0.00

1.50
1.50
1.20
3.60

0.00
0.00
1.80

13.57
13.57

26.61
0.34

3.78
0.38
0.00

1.50
1.50
1.20
4.80

0.00
0.00
1.80

14.96
14.96

33.24
0.08

3.78
0.38
0.00

1.50
1.50
1.20
4.80
0.00
0.00
1.80

14.96
14.96

33.24
0.12

3.78
0.38
0.00

1.50
1.50
1.20
4.80

0.00
0.00
1.80

14.96
14.96

33.24
0.19

4.20
0.42
0.00

1.50
1.50
1.20
4.80

0.00
0.00
1.80

15.42
15.42

30.84
4.20
0.42
0.00

1.50
1.50
1.20
4.80

0.00
0.00
1.80

15.42
15.42

15.42

3.78
0.38
0.00

1.50
1.50
1.20
4.80

0.00
0.00
1.80

14.96
14.96

0.06

378.00
37.80
0.00

1.50
1.50
1.20
4.80

0.00
0.00
1.80

426.60
426.60

5.33
3.78
0.38
0.00

1.50
1.50
1.20
4.80

0.00
0.00
1.80

14.96
14.96

0.25

3.78
0.38
0.00
1.50
1.50
1.20
4.80

0.00
0.00
2.10

15.26
15.26

0.42

Description

0.00
0.00
0.00
0.00

0.75
0.60

1.35
0.34
0.00
0.00
0.00

0.38
0.30

0.68

0.38
0.30

0.68

1.69

11.25

0.00
0.00
0.00
0.00
0.00

2.25
2.40

4.65

1.16
0.12
1.28

0.00
0.00
0.00
0.00
0.00

0.00
0.00

0.00

0.00

1.50
2.40
0.00
0.00

3.90

0.75
2.40

3.15

8.33

15.14
0.00
0.00
0.00

4.50
3.60

8.10

1.62

0.41

0.00
0.00
0.00
0.00

0.00

0.00

0.00

0.00

1.50
4.80
0.00
0.00

6.30
2.25
2.40

4.65

11.35

5.68

Description

0.00
0.00
0.00

0.00

1.50
1.20

2.70

Description

0.00
0.00
0.00
0.00
0.00
4.50
4.80

9.30

0.00
0.00
0.00
0.00
0.00

4.50
4.80

9.30

0.00
0.00
0.00
0.00
0.00

2.25
2.40

4.65
0.00
0.00
0.00
0.00
0.00

3.38
4.50
0.24

8.11

0.00
0.00
0.00
0.00
0.00

5.25
6.60
0.24

12.09
0.00
0.00
0.00
0.00
0.00

3.38
3.60
0.21

7.18

0.00
0.00
0.00
0.00
0.00

2.25
2.40
0.23

4.88

0.00
0.00
0.00
0.00
0.00

3.38
4.50
0.24

8.11

0.00
0.00
0.00
0.00
0.00

5.63
6.60
0.24

12.47

0.00
0.00
0.00
0.00

7.50
4.20

11.70

0.00
0.00
0.00
0.00

1.88
3.00

4.88

0.00
0.00
0.00
0.00

0.75
0.60

1.35
0.00
0.00
0.00
0.00

1.88
1.50

3.38

0.34

0.00
0.00
0.00
0.00

1.50
1.50

3.00

0.30

Description
0.00
0.00
0.00
0.00

2.25
2.70
0.15

5.10

0.00
0.00
0.00
0.00

1.50
2.40
0.20

4.10

Description

0.00
0.00
0.00
0.00
.

6.00
7.20

13.20

0.00
0.00
0.00
0.00

6.38
8.40
0.44

15.22

Description

0.00
0.00
0.00
0.00
0.00
0.00
0.00
6.00
4.80
0.60

11.40

Description

0.00
0.00
0.00
0.00
0.00

6.00
4.80
0.30

11.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00

6.00
4.80
0.60

11.40

Description

0.00
0.00
0.00
0.00
0.00
0.00

10.50
9.60

20.10

3.35

0.00

4.50
3.60
8.10

1.35

0.00
0.00

3.75
3.60

7.35

2.04

0.00
0.00

1.50
2.40

3.90

1.08
0.00

2.40

2.40

0.00
0.00

0.38
0.30

0.68

0.05

0.00
0.00
0.00
0.00
0.00

0.38
0.30
0.68

0.06

0.00
0.00
0.00

4.50
3.60
0.18

8.28

0.08

0.00
0.00
0.00

4.50
3.60
0.18

8.28

0.08
Description

0.00
0.00
0.00
0.00
0.00
0.00
0.00

1.50
1.20

0.75
0.75

0.38
0.60

5.18

0.35
0.00
0.00
0.00
0.00

0.75
0.19
0.60

1.54

0.10

0.00
0.00
0.00
0.00
0.00
0.00
0.00

3.75
0.75
1.80
0.19

6.49

3.33

Description
0.00
0.00
0.00
0.00
0.00

2.25
2.40
0.14

4.79

2.46

0.00
0.00
0.00
0.00
0.00

1.50
1.50
3.60
4.50
4.80
0.37

16.27

8.34

0.00
0.00
0.00
0.00

4.50
7.20
0.35

12.05

6.69
.

Description

0.00
0.00
0.00
0.00

0.00
0.00

7.50
1.80

9.30

0.41

0.00
0.00
0.00
0.00

0.00
0.00

9.00
2.40

11.40

0.41
0.00
0.00
0.00

0.00

1.13
0.45
0.38
0.30

2.25

0.10

0.00
0.00
0.00
0.00

0.00
0.00

3.75
1.20
1.50
1.50

7.95

0.49

0.00
0.00

0.00

9.00
3.00
0.75
0.60

13.35

0.48
0.00
0.00
0.00

0.75
0.60

1.35

0.15

Description

0.00
0.00

0.75
0.60

1.35

0.90

0.00
0.00

0.38
0.30

0.68
0.00

0.38
0.30

0.68

0.00

0.75
0.60

1.35

0.00
0.00

0.38
0.30

0.68

0.17

0.00
0.00

0.38
0.30

0.68

0.00
0.00

0.09
0.08

0.17

0.00
0.00

0.09
0.09

0.19

0.00
0.00

0.75
0.60
1.35

0.23

0.00
0.00

0.75
0.60

1.35

0.23

0.00
0.00
.

0.19
0.15

0.34

0.06

Description

0.00
0.00
0.00
0.00
0.00

2.25
3.00

5.25

0.00
0.00
0.00

1.50
3.30
0.14

4.94

0.00
0.00
0.00

1.50
1.80
0.10
3.40

0.00
0.00
0.00
0.00

3.75
3.00
0.20

6.95

0.00
0.00
0.00
0.00

2.40
2.40
0.14

4.94
0.00
0.00
0.00
0.00

1.50
1.80
0.10

3.40

0.00
0.00
0.00
0.00

2.25
1.80
0.12

4.17

0.00
0.00
0.00
1.50
1.80

1.50

0.00
0.00
0.00

1.50
1.80
1.80

5.10

0.00
0.00
0.00

1.88
2.40
0.30

4.58
0.00
0.00
0.00

1.88
0.30
2.40

4.57

0.00
0.00
0.00
0.00

1.88
0.30
2.40

4.57

0.00
0.00
0.00

0.56
0.38

0.94

0.09

Description

0.00
0.00

1.13
0.60

1.73

0.00
0.00
0.00
0.00

2.25
0.60

2.85

0.00
0.00
0.00
0.00

3.75
1.20
0.15

5.10

0.00
0.00
0.00
0.00
0.00

0.75
0.90

1.65

3.30
0.00
0.00

2.25

2.25

0.00
0.00

0.75

0.75

0.00
0.00
0.00
0.00

2.25
0.60
2.85

0.00
0.00
0.00
0.00
0.00
0.00

2.25
3.00
0.16

5.41

0.54

0.00
0.00
0.00
0.00
0.00
0.00

0.75
0.60
0.04

1.39
0.14

0.00
0.00
0.00
0.00
0.00

1.88
0.06

1.93

0.00
0.00
0.00

3.00
2.40
0.16

5.56

0.56
0.00
0.00
0.00
0.00

1.13
0.03

1.16

0.00
0.00
0.00

2.63
0.08

2.70

0.00
0.00

0.75
0.60

1.35
0.00
0.00
0.00
0.00

0.45

0.45

Description

0.00
0.00
0.00

0.19
0.15

0.34

0.03

0.00
0.00
0.00

0.19
0.15

0.34

0.03

0.00
0.00
0.00
0.00
0.00

0.75
0.60

1.35

0.01

0.00
0.00
0.00
0.00
0.00
1.13
0.90

2.03

0.02

0.00
0.00
0.00
0.00
0.00

1.13
0.90

2.03

0.02

0.00
0.00
0.00
0.00
0.00
1.13
0.90

2.03

0.02

0.00
0.00
0.00
0.00
0.00

1.50
1.20

2.70

0.03

2.70

2.70

0.03
0.00
0.00

4.50
3.60

8.10

0.08

0.00
0.00

5.25
4.20

9.45

0.09

0.00
0.00
0.38

0.38

0.04

0.00
0.00

0.38

0.38

0.04

0.00
0.00

0.38

0.38

0.04
0.00
0.00

0.38

0.38

0.04

0.00
0.00

0.75

0.75

0.08

0.00
0.00

0.75

0.75

0.08
0.00
0.00

0.75

0.75

0.08

0.00
0.00

0.75

0.75

0.08

0.00
0.00

0.75

0.75
0.08

0.00
0.00

0.75

0.75

0.08

0.00
0.00

0.75

0.75

0.08

0.00
0.00
0.75

0.75

0.08

0.00
0.00

1.50

1.50

0.15

0.00
0.00

1.50

1.50

0.15
0.00
0.00

2.25

2.25

0.23

0.00
0.00

2.25

2.25

0.23

Description

0.00
6.30
0.00
0.00
0.00
1.80

3.00
2.40
3.75

17.25

0.17

Description

0.00
0.00
0.00
0.00
0.00
0.00

0.38
0.30
0.03

0.71

0.12

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.38
0.30
0.03
0.07

0.78

0.13

Description

0.00
0.00
0.26
6.72
0.05
0.00

0.75
0.60

8.38
0.00
58.80
1.53
1.43

2.25
3.00

67.01

Description

0.00
0.00
0.00
0.00
0.00
0.00

0.75
1.20

1.95
0.00
0.00
0.00
0.00
0.00

0.75
1.20

1.95

0.00
0.00
0.00
0.00
0.00

0.38
1.50
1.20

3.08
0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.75
1.50
1.20

3.45

0.00

1.50
1.20

2.70
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

0.38
1.50
1.20

3.08

Description

0.00
0.00
0.00
0.00
0.00

0.75
0.60
0.09

1.44

0.06
0.00
0.00
0.00
0.00
0.00

0.19
0.15
0.02

0.35

0.35

0.00
0.00
0.00
0.00
0.00

0.19
0.15
0.02

0.35
0.00
0.00

0.09
0.08
0.01

0.18

0.00
0.00
0.00
0.00
0.00

0.50
0.40
0.05

0.95

0.04

0.00
0.00

0.09
0.08
0.01
0.18

0.00
0.00

0.09
0.08 Description

0.17
Main Menu
Material Cost

Item Description Calculation


Excavation
1 Removing top soil to a depth not exceeding 6" & depositing as
directed within site. -

2 Excavation over site to reduce level, in any material except


rock requiring blasting including depositing and levelling as
directed up to a distance not exceeding 30'0". -

3 Excavation in trenches for walls / column pits in soft / loose soil


from 0'0" to 5'0" deep and depositing excavated material to a
distance not exceeding 30'0" (Earth work support to be paid
seperatyely where necessary) -

4 Excavation in trenches for walls / column pits in ordinary soil


from 0'0" to 5'0" deep and depositing excavated material not
exceeding 30'0". -

5 Excavation in trenches for walls / column pits in Hard / dense


soil up to a depth of 5'0" and depositting excavated material up
to a distance not exceeding 30'0". -

6 Excavation and trenches for walls/ column pits in mud / wet


soil up to a depth of 5'0" and depositting excavated material to
distance not exceeding 30'0" -

7 Excavation in trenches for walls/ column pits in soft


distintegrated rock ( not requiring blasting) upto a depth of
5'0"& depositing excavted material to a distance not
exceeding 30'0". -
8 Excavation in trenches for walls/ column pits in Hard
rock requiring blasting upto a depth of 5'0"& depositing
excavted material to a distance not
exceeding 30'0".

Materials
0.75 lbs blasting powder 0.00
10 lft fuse 0.00
1 lb jumper steel 0.00
Fuel & forge - 20% of material cost 0.00

9 Benching rock in foundation in 3"-6" steps. (Blasting prohibite)


0.00

10 Anti termite treatement


Anti termite treatement on excavated foundation and
compacted soil under floors

Materials
16 lbs D.D.T. Powder ( 8% in 20goals of water) 0.00
20 gals water 0.00

Note: Alternative mixes


(a) Copper Napthaline (5% in 4 to 8 gqls of fuel oil)
(b)Sodium Arsenate ( 10% in 12 to 20 20gals of water)

11 Earthwork - Back filling & Compacting


Backfilling to trenches with selected earth available at site.
0.00

12 Backfilling to trenches with imported material.

1.00 cube earth deliverted at site. 0.00


Allow 15% compaction 0.00
13 Filling under floors including levelling, watering & compacting
in 3" layers with available and selected earth at site.
0.00

14 Filling under floors including levelling, watering & compacting


in 3" layers with imported selected earth.

1.00 cube earth deliverted at site. 0.00


Allow 15% compaction 0.00

15 Cutting turf sods, loading to hand carts and transporting up to


30 yqrds, laying and watering for 30 days. (Royalty for turf,
pegging and transport beyond 30 years paid seperately).

60 gals water. 0.00

Note:
Rate does not include for:
(a) Royalty for turf
(b) Transport of turf
(c) Pegs on sloping rates
(d) Water

Earth work support


16 Earthwork support (open planking) in trenches up to a depth
of 5'0"
Concider trench 15'0" long
3'0" wide and 5'0" depth
open planking to both faces.

Materials
17.50 cu.ft class II timber (4uses) 0.00
Add 5% on above for wedges 0.00
17 Earthwork support (close planking) in trenches up to a depth
of 5'0"
Concider trench 15'0" long
3'0" wide and 5'0" height of planking to both faces

Materials
3.00 cu.ft class II timber (4uses) 0.00
Add 5% on above for wedges 0.00

18 Earthwork support (close planking) in deep excavation in


trenches up to a depthof 5'0"
Consider trench of length of 15'0"
Width 5'6" at top
Width 3'6" at bottom
Then area supported is 2/ 15'15' = 450 sq.ft

Materials
100.00 cu.ft class II timber (4uses) 0.00
Add 5% on above for wedges 0.00

Concrete

Premeable

Assumption

1. Mixing concrete using a concrete mixer 14/10 cu.ft capacity


and manual loading are the basis on which the norms are
worked.

2. A gang of 1 skilled and 6 un skilled labourers produce 3.00


cubes of concrete per day using a 14/10 cu.ft capacity mixer.
This is per accepted practice.

3.The production of concrete is at the mixer site transporting


mixed concrete and placing same in position is paid for
seperately.
4.In concrete items 26 to 39 both inclusive, placing of concrete
in columns, beams and floor slabs on the ground floor the
labour component allowed is for the placing of concrete
betweeen the ground floor and top of the 1st floor slab which
area is calleded the ground floor area. Similarly the area
between the top of the 1st floor slab and the top of the 2nd
floor slab is called the 1st floor area etc.

19 Mixing concrete 1:3:6 (1 1/2")

Materials
13 cwt (50Kg bags) cement 0.00
0.53 cubes sand 0.00
0.92 cubes 1 1/2" metal 0.00
1/3 day hire of mixer 0.00
Water (110 gals) 0.00

Note:
a. Water available at site
b. If water is not available allowances should be ,made for
transport of water.
c. sand includes 15% for bulking

20 Mixing concrete 1:2 1/2:5 (1")

Materials
14 cwt (50Kg bags) cement 0.00
0.60 cubes sand 0.00
0.90 cubes 1" metal 0.00
1/3 day hire of mixer 0.00
Water (100 gals) 0.00

Note:
a. Water available at site
b. If water is not available allowances must be ,made for
transport of water.
c. sand includes 15% for bulking
21 Mixing concrete 1:2:4 (3/4")

Materials
18cwt (50Kg bags) cement 0.00
0.50 cubes sand 0.00
0.88 cubes 3/4" metal 0.00
1/3 day hire of mixer 0.00
Water (120 gals) 0.00

Note:
a. Water available at site
b. If water is not available allowances must be ,made for
transport of water.
c. sand includes 15% for bulking

22 Mixing concrete 1:1 1/2:3 (3/4")

Materials
23 cwt (50Kg bags) cement 0.00
0.42 cubes sand 0.00
0.82 cubes 3/4" metal 0.00
1/3 day hire of mixer 0.00
Water (150 gals) 0.00

Note:
a. Water available at site
b. If water is not available allowances must be ,made for
transport of water.
c. sand includes 15% for bulking

23 Mixing concrete 1:1:2 (3/4")

Materials
31 cwt (50Kg bags) cement 0.00
0.44 cubes sand 0.00
0.96 cubes 3/4" metal 0.00
1/3 day hire of mixer 0.00
Water (200 gals) 0.00

Note:
a. Water available at site
b. If water is not available allowances ust be ,made for
transport of water.
c. sand includes 15% for bulking

24 2" thick cement concrete screed in foundation at depths not


exceeding 5'0"

Materials
1/6 cube concrete 0.00
Add 10% for wastage 0.00

Note:
For laying concrete at depths more than 5'0", add 1/6 day
unskilled labourer for each additional 5'0" or part thereof per square.

25 3" thick cement concrete screed in foundation at depths not


exceeding 5'0"

Materials
1/4 cube concrete 0.00
Add 10% for wastage 0.00

Rate per square

Note:
For laying concrete at depths more than 5'0", add 1/4 day
unskilled labourer for each additional 5'0" or part thereof per
square.

26 6" thick cement concrete floor (mass concrete)

Materials
0.5 cubes concrete 0.00
Add 5% for wastage 0.00
Water (200 gals) 0.00

Note:
a. Water available at site
b. If water is not available allowances ust be ,made for
transport of water.

27 Cement concrete 4 1/2" * 6" columns in ground floor.

Materials
0.45 cubes concrete 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hessian - 10 sq.ft 0.00
Water - 170 gals 0.00

Note:
1) For column in 1st floor add 3% to ground floor rate.
2) For column in 2nd floor add 5% to ground floor rate.
transport of water.

28 Cement concrete in 6" * 6"column in G.F each 10'0" high ie 0.45 cubes.

Materials
0.45 cubes concrete 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession - 80 sq.ft 0.00
Water - 140 gals 0.00

Note:
1. For cfolumn in 1st floor add 3% to ground floor rate.
2. For column in 2nd floor add 5% to ground floor rate.

3. For column in 3rd floor add 7% to ground floor rate.

4. Water available at site.

5.If water is not available allowances must be made for


transport of water

29 Cement concrete in 9" * 9" column in ground floor.

Consider 8 No columns 9"*9" each 10'0" high ie 0.45 cubes

Materials
0.45 cubes concrete 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession - 60 sq.ft 0.00
Water - 100 gals 0.00

Note:
1. For cfolumn in 1st floor add 3% to ground floor rate.

2. For column in 2nd floor add 5% to grtound floor rate.

3. For column in 3rd floor add 7% to ground floor rate.

4. Water available at site.

5.If water is not available allowances must be made for


transport of water

30 Cement concrete in12" * 12" column in ground floor.

Consider5 No columnss12" * 12" each 10'0" high.


Materials
0.50 cubes concrete 0.00
Add 5% for wastage 0.00
1 day hire of vibrator 0.00
40 sq.ft Jute Hessian 0.00
Water (100 gals) 0.00

Note:
1. For cfolumn in 1st floor add 3% to ground floor rate.

2. For column in 2nd floor add 5% to grtound floor rate.

3. For column in 3rd floor add 7% to ground floor rate.

4. Water available at site.

5.If water is not available allowances must be made for


transport of water

31 Cement concrete in 13 1/2" * 13 1/2" column in ground floor.

Materials
0.51 cubes concrete 0.00
Add 5% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession - 45 sq.ft 0.00
Water - 100 gals 0.00

Note:

a. Water available at site.

b.If water is not available allowances must be made for


transport of water

32 Cement concrete in 6" * 6" Beam up to 1st floor level.


Consider 180 L.ft of beam 6" * 6" ie. 0.45 cubes

Materials
0.45 cubes concrete 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession -90 sq.ft 0.00
Water - 180 gals 0.00
Note:

a. Water available at site.


b.If water is not available allowances must be made for
transport of water

33 Cement concrete in 9" * 6" Beam up to 1st floor level.

Consider 120 L.ft of beam 9" * 6" ie. 0.45 cubes


Materials
0.45 cubes concrete 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession - 75 sq.ft 0.00
Water - 150 gals 0.00

Note:

a. Water available at site.

b.If water is not available allowances must be made for


transport of water

34 Cement concrete in 9" * 9" Beam up to 1st floor level.

Consider 80'0" length of 9" * 9" beam ie. 0.45 cubes


Per 0.45 cubes.

Materials
0.45 cubes concrete 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession - 60sq.ft 0.00
Water - 120 gals 0.00

a. Water available at site.

b.If water is not available allowances must be made for


transport of water

35 5" thick R.CC floor slab in 1st floor

Consider 5" thick slab 10'0" * 12'0" volume of concrete 50.00


cu.ft.

Materials
50.00 cu.ft concrete (25 Mpa) 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession -30sq.ft 0.00
Water - 90 gals 0.00

Note:
a. Water available at site.

b.If water is not available allowances must be made for


transport of water

36 6" thick R.CC floor slab in 1st floor


Consider 10'0" * 10'0" panel

Materials
50.00 cub.ft concrete (25 Mpa) 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession -25 sq.ft 0.00
Water - 90 gals 0.00
Note:
a. Water available at site.
b.If water is not available allowances must be made for
transport of water

37 Cement concrete in 4 1/2" * 6" lintols in ground floor

Materials
45.00 cu.ft (25 Mpa) 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession -10 sq.ft 0.00
Water - 90 gals 0.00
1 1/2 days U/SK labourer 1.20

Note:
a. Water available at site.

b.If water is not available allowances must be made for


transport of water

38 Cement concrete in 9" * 9" lintols in ground floor

Materials
45.00 cu.ft (25 Mpa) 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession -60 sq.ft 0.00
Water - 90 gals 0.00

Note:
a. Water available at site.
b.If water is not available allowances must be made for
transport of water

39 Cement concrete in 9" *12" lintols in ground floor

Consider length 60'0"of lintol = 45 cu.ft concrete

Materials
45.00 cu.ft (25 Mpa) 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00

Curing
Jute Hession -55 sq.ft 0.00
Water - 90 gals 0.00

Note:
a. Water available at site.
b.If water is not available allowances must be made for
transport of water

40 Cement concrete in 12" *15" lintols in ground floor

Consider length of 36'0" = 45 cu.ft concrete

Materials
45.00 cu.ft concrete 0.00
Add 10% for wastage 0.00
1 day hire of vibrator 0.00
Curing
Jute Hession -40 sq.ft 0.00
Water - 90 gals 0.00

Note:
a. Water available at site.
b.If water is not available allowances must be made for
transport of water

Timber Form work


41 Sawn timber form work to 9" * 9" cement concrete column in
ground floor

(a) Making mould


1. Materials
18.15 sq.ft 1" thick class II timber 0.00
17.10 L.ft 2" * 2" class II timber in yokes. 0.00
16.12 L.ft 2" * 1" class II timber battens. 0.00
1 1/2 lb wire nails. 0.00

(b) Assembling (per use)


Materials
12 Nos. 16mm 18" long bolts (20uses) 0.00
1/2 litre mould oil 0.00
35 L.ft 4" * 2" props (10 uses) 0.00

42 Sawn timber form work to 9" * 9" cement concrete beams in


ground floor

Consider 9" * 12" beam of 20'0" long. Contact area 55 sq.ft.

(A) Making the mould


a. 60 sq.ft 1" timber planks 0.00
b. 24 L.ft 2" * 2" battens 0.00
c. 45 L.ft 2" * 2" ledgers 0.00
d. 30 L.ft 4" * 2" bearers at bottom of mould. 0.00
e. 2 lbs wire nails 0.00
(B) Assembling
Materials
a. 110 L.ft 4" * 2" vertical props 0.00
b. 80 L.ft 2" * 2" bracing to mould & props 0.00
c. 50 L.ft 2" * 2" bracing to a set of props 0.00
d. 6.0 sq.ft 1" timber base plate to props 0.00
e. 122 Nos wedges 0.00

43 Sawn timber formwork for underside of first floor slab

(A) Making panels


1) Materials
a. 220 sq.ft 1" thick tongue and grooved timber
planks 0.00
b. 121 L.ft 4" * 2" runners at 2'0" centres. 0.00
c. 4 lbs wire nails. 0.00

(B) Assembling
Materials
a. 690 L.ft 4" * 2" vertical timber props 0.00
b. 66 L.ft 2" * 2" bracing for props 0.00
c. 122 Nos wedges 0.00
d. 33 sq.ft 1" base platefor props 0.00

(C) Labour & Sundries for Assembling


c. 1 gal mould oil for assembling 0.00
d. 2 lbs wire nails. 0.00

Steel reinforcement
44 Mild steel / for steel reinforcement to lintels slabs beams for
column bent to shape laid in position and tied with G.I. wire
as directed

Materials
1 cwt. M.S./ Tor steel rods including transport to site. 0.00
(Allow for wastage 15%) 0.00
1 1/2 lbs 16 BWG binding wire 0.00
Add 1.5% of steel cost for spacers or chairs. 0.00

Brick work
45 Brick work in cement sand 1:5 in foundation upto D.P.C

Materials
1450 bricks 0.00
Add 5% wastage 0.00
4.00 cwt cement (50 Kg bags) 0.00
0.25 cubes sand 0.00
Water (150 gals) 0.00

46 Brick work in cement sand 1:8 in foundation upto D.P.C

Materials
1450 bricks 0.00
Add 5% wastage 0.00
2 1/3 cwt cement (50 Kg bags) 0.00
3/8 cubes sand 0.00
Water (150 gals) 0.00

47 Brick work in cement sand 1:5 in 4 1/2" thick walls in ground


floor.

Materials
550 bricks 0.00
Add 5% wastage 0.00
1.30 cwt cement (50 Kg bags) 0.00
0.10 cubes sand 0.00
Water (50 gals) 0.00

48 9" thick brick wall cement sand 1:5 in ground floor

Materials
1090 bricks 0.00
Add 5% wastage 0.00
3.00 cwt cement (50 Kg bags) 0.00
0.20 cubes sand 0.00
Water (115 gals) 0.00

49 Brick work 13 1/2" thick in cement sand 1:5 in superstructure


in ground floor

Materials
1630 bricks 0.00
Add 5% wastage 0.00
4.50 cwt cement (50 Kg bags) 0.00
0.30 cubes sand 0.00
Water (170 gals) 0.00

50 9" Brick walls in cement sand 1:8 in superstructure


in ground floor

Materials
1090 bricks 0.00
Add 5% wastage 0.00
1.75 cwt cement (50 Kg bags) 0.00
0.30 cubes sand 0.00
Water (115 gals) 0.00

51 4 1/2" thick Brick wall (wire cut) in cement sand 1:5 in ground
floor

Materials
550 weirecut bricks 0.00
Add 2% wastage 0.00
1.20 cwt cement (50 Kg bags) 0.00
0.08 cubes sand 0.00
Water (30 gals) 0.00

52 9" thick in cement and sand 1:5 with wire cut Bricks
Materials
1080 weirecut bricks 0.00
Add 4% wastage 0.00
2.50 cwt cement (50 Kg bags) 0.00
0.18cubes sand 0.00
Water (100 gals) 0.00

53 13 1/2" thick Brick wall (wire cut) in cement and sand 1:5 in
ground

Materials
1630 weirecut bricks 0.00
Add 2% wastage 0.00
4.50 cwt cement (50 Kg bags) 0.00
0.30cubes sand 0.00
Water (50 gals) 0.00

54 Extra over for facing including raised pointing 1/8" in cement


and sand 1:1 mixture in ground floor

Materials
0.50 cwt cement (50 Kg bags) 0.00
1.00 cu.ft sand 0.00
1/10 gals acid 0.00
water 10 gals 0.00

55 3" thick floor paved in lime motor 2.5 in ground floor

Materials
350 bricks 0.00
1.20 cwt slaked lime 0.00
0.11 cubes sand 0.00
water (45 gals) 0.00

56 Steps 1'-1 1/2" * 0'6" in brick cement and sand 1:5 with 1/2"
thick cement and sand 1:2 redering including necessary
excavation.

Materials
120 bricks 0.00
0.50 cwt slaked lime 0.00
0.05 cubes sand 0.00
water (15 gals) 0.00

57 Brick drains in cement and sand 1:5, 9" wide and 6"-9"
average depth including cement rendering 1/2" thick 1:2 to
exposed to faces with 1'6" ramp including necessary excavation

Materials
140 bricks 0.00
0.80 cwt slaked lime 0.00
0.05 cubes sand 0.00
water (20 gals) 0.00

58 Brick drains in cement and sand 1:5, 9" wide and 6"-9"
average depth including cement rendering 1/2" thick 1:2 to
exposed to faces with 1'6" ramp including necessary excavation

Materials
110 bricks 0.00
0.70 cwt slaked lime 0.00
0.05 cubes sand 0.00
water (20 gals) 0.00

Hollow block masonry


59 8" thick Hollow block work in cement and sand mortar 1:5 in
ground floor (cavities unfilled)

Materials
112 Hollow cement blocks 0.00
Allow 5% for wastage 0.00
0.75 cwt cement (50 Kg bags) 0.00
0.06 cubes sand 0.00
60 4" thick Hollow block masonry in cement and sand mortar 1:5
with cavities unfilled.

Materials
112 Hollow cement blocks 0.00
Allow 5% for wastage 0.00
0.40 cwt cement (50 Kg bags) 0.00
0.03 cubes sand 0.00

Random Rubble masonry


61 Random Rubble masonry in cement mortar 1:5 in foundation

Materials
1.30 cubes 6" - 9" Rubble 0.00
5.00 cwt cement (50 Kg bags) 0.00
0.30 cubes sand 0.00
water (100 gals) 0.00

62 Random Rubble masonry in cement mortar 1:5 insuperstructure

Materials
1.30 cubes 6" - 9" Rubble 0.00
5.00 cwt cement (50 Kg bags) 0.00
0.30 cube sand 0.00
water (100 gals) 0.00

Pressed tilling
63 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and
pointing in neat cement in ground floor

Materials
225 pressed tiles 8" * 8" 0.00
Add 5% for wastage 0.00
1 1/4 cwt cement 0.00
0.07 cubes sand 0.00
1/4 lb wax polish 0.00
1/4 lb coloured pigment 0.00
2 lbs cotton waste 0.00

wall tiling and Terra tiles


64 Glazzed tiles fixed to walls including bedding in cement mortar
1:2 and raking in ground floor. (special measured seperately)

Materials
400 glazed tiles 6" * 6" 0.00
Add 10% for wastage on cutting 0.00
2 1/2 cwt cement (50 Kg bags) 0.00
0.11 cubes sand 0.00
1 lb white cement 0.00

65 Terrazo floor tiles on 1/2" thick cement and sand 1:2 in ground
floor.

Materials
100 12" * 12" Terrazo floor tiles 0.00
Add 5% for wastage 0.00
1 1/4 cwt cement (50 Kg bags) 0.00
0.07 cubes sand 0.00
1/2 lb wax polish 0.00
Coloured pigment 0.00
2 lb cotton waste 0.00

Roofing
66 Timber framework for calicut pattorn tile hip roof in single
storey building consisting og wall plate, beam ridge plate,
raftters etc (preservative treatement to be measured seperately)

Materials
34.00 cu.ft timber 0.00
Add 10% for wastage 0.00
660 L.ft 2" * 1" reepers 0.00
Add 5% for wastage 0.00
8 lbs wire nails 6" long 0.00
2 lbs wire nails 2" long 0.00

67 Roof covering with calicut pattern clay tiles in single storeyed


building

Materials
750 Tiles 0.00

68 Timber framework for corrugated asbestoes sheet roof in


single.

Materials
13 1/4 cu.ft timber purlins 0.00
Add 10% for wastage 0.00

69 Roof covering with currugated asbestoes sheets (Timber frame


work and ridge covering measured seperately)

Materials
420 sq.ft asbestoes currugated sheets 0.00
72 Nos. roofing screws and washers. 0.00

70 One layer half round clay tiles over corrugated asbestoes roof
covering.

Materials
650 half round clay tiles 0.00
71 Asbestoes close fittings ridging fixed complete with roofing
screws or bolts (hook)

Per 13'4" length

Materials
4 Pairs ridges 3'8" long 0.00
16 Roofing screws or bolts 0.00

72 Ridging covering with culicut pattern ridge tiles bedded in


cement lime mortar 1:1:4

Materials
9 ridge tiles 0.00
1/3 cwt cement (50 Kg bags) 0.00
0.02 cubes sand 0.00
15 lbs slaked lime 0.00
1/2 lb Colouring powder 0.00

73 1/4" * 9" high valance board fixed with brass screws to ends
of rafters (for tile roofing)

Materials
75.00 sq.ft 1" planks 0.00
Add 5% for wastage 0.00
70 Nos. 1 1/2" brass screws 0.00

74 3/4" * 9" high barge board fixed with brass screws at 2'0"
centres to sides of rafters.

Materials
75.00 sq.ft 1" planks 0.00
Add 5% for wastage 0.00
50 Nos. 1 1/2" brass screws 0.00
Roof plumbing

75 18 B.W.G.(1.2mm) galvanized iron sheet valley gutter 3'0"


girth over all once bent with end laps not less than 9" width
including 3/4" tongued and grooved planks laid to slope and
profile in timber members.

Materials
2 G.I sheet (8' * 4') 0.00
1/4 gal wood preservative 0.00
0.10 cwt cement (50 Kg bags) 0.00
0.05 cwt slaked lime 0.00
1.00 cu.ft sand 0.00
50.00 sq.ft planks 0.00
2 lbs 1 1/4" wire nails 0.00

76 18 B.W.G.(1.2mm) galvanized iron flashing 1'6" girth overall


3 times bent with end laps not less than 6" width, lead
soldered turned and tucked up to not less than 6" in to chase
cut in wall and pointed in cement mortar 1:2 lower end
dressed over roof covering not less than 1'0" wide

Materials
1 G.I sheet (8' * 4') 0.00
0.05 cwt cement (50 Kg bags) 0.00
1.00 cu.ft sand 0.00
1 lb soldering lead 0.00

77 Timber framework for 4'0" * 4'0" flat asbestoes ceiling


(sheet measured seperately) comprising of 4" * 2" joist and
2" * 2" bearers in class I timber.

Materials
8.00 cu.ft timber class I 0.00
1 lb 2" nails 0.00
26 Nos. fibre/ plastic plugs 0.00
25 lbs cement 0.00
2.00 cu.ft sand 0.00
2" brush - 4 uses 0.00
1/3 gal tarnap 0.00

Ceiling
78 Horizontal ceiling lining using 4'0" * 4'0" flat asbetoes cement
sheets fixed with including beading and cove moulding on
timber framework. (Timber frame work & painting measured
seperately)

Materials
210 sq.ft flat asbestoes sheets 0.00
60 L.ft 2" * 2" halmilla cove moulding 0.00
125 L.ft 1 1/2" * 1 1/2" halmilla cove beadings 0.00
1/4 lb 1/4" clout nails 0.00
8 doz 1 1/2" brass screws 0.00

79 3/4" thick tongued and grooved Lunumidella ceiling boards


fixed horizontal on 4" * 2" class I timber joist at 2'0" centres
with 1 1/2" brass nails.

Materials
115 L.ft 4" * 2" timber joist 0.00
215 sq.ft 6" * 3/4" Lunumidella ceiling planks 0.00
3 lbs cement 0.00
4.00 cu.ft sand 0.00
4 Kg 1 1/2" brass nails 0.00

80 3/4" *6" wide tongued and grooved Lunumidella ceiling boards


fixed underside of roof rafters, (existing) 1 1/2" brass nails
including levelling with timber strips where necessary.

Materials
220.00 sq.ft ceiling planks 0.00
40.00 L.ft 2" * 1/4" timber strips 0.00
4Kg1 1/2" brass nails 0.00
2Kg1 3/4" nails 0.00
Doors and Windows
81 Door single hung 3'3" * 7'0" high overall with frame having
1 1/4" thick shash & 3 1/4" * 2 3/4" frame. (glazing, iron
mongery and painting measured seperately).

Materials
(a) Frame
1 1/2 cu.ft 4" * 3" timber 0.00
2 No. spur stones 0.00
6 No. fibre/plastic plug with 4" long screws 0.00
2 Nos. 5/8" dia mild steel dowels 4" long 0.00

(b) Sashes
14 sq.ft 1 1/2" planks 0.00
5 sq.ft 1" planks 0.00

82 Door galazed and panneled double hung 4'0" * 7'0" high


overall with frame including 1 1/4" thick sash and 3 3/4"*2 3/4"
frame.(glazing,iron mongery and painting measured seperately)

Materials
(a) Frame
1 2/3 cu.ft 4" * 3" timber 0.00
2 No. spur stones 0.00
6 No. fibre/plastic plug with 4" long screws 0.00
2 Nos. 5/8" dia mild steel Dowels 4" long 0.00

(b) Sashes
16 sq.ft 1 1/2" planks 0.00
7 sq.ft 1" planks 0.00

83 Plywood door single hung 3'1 1/2" * 6'1 1/2" overall with
frame having 1 1/4" thick sash and 3 1/4" * 2 3/4" frame.
(iron mongery and painting measured seperately)

Materials
(a) Frame
1.80 cu.ft 4" * 3" timber 0.00
2 No. spur stones 0.00
6 No. fibre/plastic plug with 4" long screws 0.00

(b) Sashes
1 No. 6'9" * 2'9" plywood sash. 0.00

84 Door ledged, braced and battened single hung 2'6" * 6'6"


overall with frame having 7/8" thich tongued & grooved planks
and 3 3/4"*2 3/4" frame(iron mongery and painting measured
seperately)

Materials
(a) Frame
1.70 cu.ft 4" * 3" timber 0.00
2 No. spur stones 0.00
6 No. fibre/plastic plugs with 0.00
2 No. 5/8" mild steel dewels 4" long screws. 0.00

(b) Sashes
21.00 sq.ft 1" thick planks 0.00
3 doz. 1 1/4 long brass screws. 0.00

85 Window, glazed 7'0" * 4'0" high overall with frame comprising


3 No openable sashes and 3 3/4" * 2 3/4" frame and mullions.
(glazing,iron mongery and painting measured seperately)

Materials
(a) Frame
3.20 cu.ft 4" * 3" timber 0.00
4 No. fibre/plastic plugs with 4" long brass screws 0.00

(b) Sashes
9.25 sq.ft 3" * 1 1/2" timber 0.00

86 1/4" clear sheet glass panes exceeding 1'0" but not exceedingly
4 square feet cut and fixed with timber beadings to doors and
windows.
Materials
9.00 sq.ft glass panes 0.00
30 L.ft 1/2" * 1/2" beading 0.00
4 doz. Brass panel pins 0.00

Iron mongaries
87 Ironmongery

Materials
1 1/4 mullion butt hinges 0.00
2 doz. 3/4" brass screws 0.00

88 Tee hinges 6" * 12"

Materials
1 pair Tee hinges 0.00
1 1/2 doz. 3/4" iron screws 0.00

89 Rim lock

Materials
1 rim lock with screws 0.00

90 Mortice lock

Materials
1Mortice lock with screws 0.00

91 Casement stays

Materials
4 Casement stays 0.00
16 - 1/2" brass screws 0.00
92 Door closer (Hydraulic)

Materials
1 Door closer 0.00
8 - 3/4" brass screws 0.00

93 Tower / skeleton brass bolts.

Materials
1 Tower / skeleton brass bolt. 0.00
10- 1/2" brass screws 0.00

94 Barrel bolt 4"

Materials
1 Barrel bolt. 0.00
8- 1/2" brass screws 0.00

95 Casement fasteners

Materials
6 Casement fasteners 0.00
24 - 1/2" brass screws 0.00

96 Spring loadea fanlight catches.

Materials
6 brass fanlight catches. 0.00
2 doz 1/2" brass screws 0.00

97 Draw rings

Materials
6 Draw rings 0.00
1 doz 1/2" brass screws 0.00
Plastering
98 3/4" thick DPC, in cement sand 1:2 finished with 2 coats not
tar & blinded with sand.

Materials
2.25 cwt cement 0.00
0.11 cube sand 0.00
1 1/2 gals bitumen 0.00
Firewood (10 lbs) 0.00
Water 10 gals 0.00

99 5/8" thick plastering to wall in lime and sand 2:5 including


floating with lime putty.

Materials
1.30 cwt slaked lime. 0.00
0.07 cube sand 0.00
Water 10 gals 0.00

100 5/8" thick plastering to wall in cement and sand 1:3 including
cement floating .

Per square

Materials
1.40 cwt cement (50 Kg bags). 0.00
0.06 cube sand 0.00
Water 10 gals 0.00

101 3/8" thick plastering to soffit slab in cement and sand 1:3
including floating with lime putty.

Materials
0.80 cwt cement (50 kg bags) 0.00
0.16 cwt slaked lime. 0.00
0.05 cubes sand 0.00
Water 10 gals 0.00

102 3/8" thick plastering to sides and soffit of beams in cement


and sand 1:3 including floating with lime putty.

Materials
0.80 cwt cement (50 kg bags) 0.00
0.16 cwt slaked lime. 0.00
0.03 cubes sand 0.00
Water 5 gals 0.00

103 5/8" thick plastering to wall in lime cement and sand 1:1:5
finished semi - rough with wooden float

Materials
0.80 cwt cement (50 Kg bags). 0.00
0.40 cwt slaked lime. 0.00
0.07 cubes sand 0.00
Water 10 gals 0.00

104 5/8" thick plastering to wall in lime cement and sand 1:1:5
finished smooth with lime putty floating

Materials
0.80 cwt cement (50 Kg bags). 0.00
0.60 cwt slaked lime. 0.00
0.07 cubes sand 0.00
Water 10 gals 0.00

105 1/2" thick rendering in cement and sand 1:3 finished smooth.

Materials
1.07cwt cement (50 Kg bags). 0.00
0.05 cubes sand 0.00
Water 10 gals 0.00
106 1/2" thick rendering in cement and sand 1:2 in floors, finished
smooth.

Materials
1.50 cwt cement (50 Kg bags). 0.00
0.05 cubes sand 0.00
Water 10 gals 0.00

107 3/4" thick rendering in cement and sand 1:3 finished smooth.

Materials
1.75 cwt cement (50 Kg bags). 0.00
0.08 cubes sand 0.00
Water 10 gals 0.00

108 3/4" thick rendering in cement and sand 1:2 in floors, finished
smooth.

Materials
2.25 cwt cement (50 Kg bags). 0.00
0.08 cubes sand 0.00
Water 10 gals 0.00

109 3/4" thick rendering in cement and sand 1:2 in coloured


cement floors, finished smooth.

Materials
2.25 cwt cement (50 Kg bags). 0.00
5 lbs powdered pigment 0.00
0.08 cubes sand 0.00
Water 10 gals 0.00

110 1/2" * 6" skirting in cement & sand 1:3 projected or flush to
walls finished with floating including forming groove.
Materials
0.10 cwt cement (50 Kg bags). 0.00
0.25 lbs powdered pigment 0.00
0.03 cubes sand 0.00

Painting & Decorating


111 Prepare and apply one coat of preservative (oil type) to
structural timber including touching up cut ends etc.After fixing.

Materials
2.75 ltr. Wood preservative (oil type) 0.00
3" brush (1/10 use) 0.00

112 Prepare surface of steel truss and apply two coats of


anticorrosive primer

Materials
2 1/4 ltr. Anti - corrosive primer 0.00
0.15 ltr. Mineral turpentine or thinner 0.00
1 wire brush 0.00
2" brush (1/8 use) 0.00

113 Apply one coat of anti - corrosive primer two coats enamel
paint on already shop primed and erected steel roof truss.

Materials
0.20 ltr. Anti - corrosive primer 0.00
0.20 ltr. Mineral turpentine or thinner 0.00
1 1/3 ltr. Enamel paint 0.00
2" brush (1/5 use) 0.00

114 Prepare and apply two coats primer and finishing coat of
enamel paint to mild steel (angle/ flat)

Materials
1 1/2 ltr. Anti - corrosive primer 0.00
0.20 ltr. Mineral turpentine or thinner 0.00
2/3 ltr. Enamel paint 0.00
1/2 wire brush 0.00
2" brush (1/5 use) 0.00

115 Painting steel on new work with two coats of anti - coropsive
paint.

Materials
2/3 ltr. Anti - corrosive primer 0.00
2" brush (1/5 use) 0.00

116 Painting new timber work with two coats wood preservative

Materials
1/2 gal wood preservative 0.00
2" brush (1/5 use) 0.00

117 Preparing and painting wood work with primer and 2 coats
enamel paint

Materials
3/4 ltr. Primer 0.00
2.50 ltr. Enamel paint (2 coats) 0.00
2" brush (1/10 use) 0.00
2 sand papers 0.00

118 White or colour washing two coats in single storey

Materials
0.50 cwt boiled lime 0.00
2 lbs salt 0.00
1/2 lb yellow ochre. 0.00
2 blue 0.00
2" brush (1/3 use) 0.00
Water 10 gals 0.00

119 White or colour washing two coats in single storey

Materials
0.50 cwt boiled lime 0.00
2 lbs salt 0.00
1/2 lb yellow ochre. 0.00
2 blue 0.00
2" brush (1/3 use) 0.00
Water 10 gals 0.00

120 Prepare and apply one coat of alkali resistant premier and two
coats of emulsion paint to walls

Materials
Primer 0.90 ltr. 0.00
1.40 ltr. Emulsion paint 0.00
Water 0.10 gals 0.00
6" brush (1/10 use) 0.00
2 sand papers 0.00

121 Cement washing to walls of single storeyd building 2 coats

Materials
5/8 cwt cement 0.00
1 - 6" coir brush 0.00
Water 5 gals 0.00

122 Painting walls with emulsion paint (2 coats)

Per square
1st coat - 1/6 gal emulsion paint 0.00
2nd coat - 1/7 gal emulsion paint 0.00
6" brush (1/10 use) 0.00
0.10 gals water 0.00
123 Prepare and apply one coat of alkali resistant premier and two
coats of emulsion paint to soffit of slabs.

Materials
0.90 ltr primer. 0.00
1.40 ltr. Emulsion paint 0.00
6" brush (1/10 use) 0.00

124 Varnishing two coats with copal varnishing after sandpapering

Materials
0.40 gals (1.80 ltre.) Varnishing 0.00
3" brush (1/13 use) 0.00

125 Wax polishing to timber in panels & floors

Materials
3/4 lb. wax polish 0.00
1/2 doz. Sheets sandpaper 0.00
1/10 floor brush 0.00
1/2 yards flannel cloth 0.00

126 Plumbing (PVC)


1/2" diameter PVC pipes fixed to walls (specials paid
seperatyely)

Materials
13 L.ft pipes 0.00
3 clips and nails 0.00
2 grms. Solvent cement 0.00

127 3/4" diameter PVC pipes fixed to walls (specials paid


seperatyely)
Materials
13 L.ft pipes 0.00
3 clips and nails 0.00
3 grms. Solvent cement 0.00

128 1" diameter PVC pipes fixed to walls (specials paid


seperatyely)

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8- 1" dia sockets. 0.00
35 clips and nails 0.00
32 grms. Solvent cement 0.00

129 1 1/4" diameter PVC pipes fixed to walls (specials paid


seperatyely)

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8- 1 1/4" dia sockets. 0.00
35 clips and nails 0.00
48 grms. Solvent cement 0.00

130 1 1/2" diameter PVC pipes laid to walls (specials paid


seperatyely)

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8- 1 1/2" dia sockets. 0.00
33 clips and nails 0.00
64 grms. Solvent cement 0.00

131 2" diameter PVC pipes laid to walls (specials paid


seperatyely)

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8 - 2" dia sockets. 0.00
35 clips and nails 0.00
112 grms. Solvent cement 0.00

132 3" diameter PVC pipes fixed to walls (specials paid


seperatyely)

Materials
100 L.ft pipes 0.00
Add 5% for wastage 0.00
8 - 3" dia sockets. 0.00
35 clips and nails 0.00
200 grms. Solvent cement 0.00

133 Excavation for laying 1/2" to 3" diameter PVC pipes in ground
not less than 1" - 6" deep, back filling & compacting
0.00

134 Chasing brickwork for laying 1/2" to 1 12" diameter PVC


pipes and making good average depth 2" (Pipes & specials
paid seperately)

Materials
0.10 cwt cement 0.00
0.01 cubes sand 0.00

135 Chasing brickwork for laying 1/2" to 3" diameter PVC


pipes in ground or floor and making good. Average depth 3"
(Pipes & specials measured seperately)

Materials
0.20 cwt cement 0.00
0.03 cubes sand 0.00

136 1/2" elbows PVC specials viz - elbows / bends / sockets.

Materials
10 - 1/2" elbows / bends / sockets 0.00
20 grms. Solvent cement 0.00

137 3/4"dia PVC specials viz - elbows / bends / sockets.

Materials
10 - 3/4" elbows / bends / sockets 0.00
30 grms. Solvent cement 0.00

138 1" dia PVC specials viz - elbows / bends / sockets.

Materials
10 - 1" elbows / bends / sockets 0.00
40 grms. Solvent cement 0.00

139 1 1/4" dia PVC specials viz - elbows / bends / sockets.

Materials
10 No - 1 1/4" elbows / bends / sockets 0.00
60 grms. Solvent cement 0.00

140 1 1/2" dia PVC specials viz - elbows / bends / sockets.

Materials
10 No - 1 1/2" elbows / bends / sockets 0.00
80 grms. Solvent cement 0.00

141 2" dia PVC specials viz - elbows / bends / sockets.


Materials
10 No - 2" elbows / bends / sockets 0.00
140 grms. Solvent cement 0.00

142 2 1/2" dia PVC specials viz - elbows / bends / sockets.

Materials
10 No - 2 1/2" elbows / bends / sockets 0.00
200 grms. Solvent cement 0.00

143 3" dia PVC specials viz - elbows / bends / sockets.

Materials
10 No - 3" elbows / bends / sockets 0.00
240 grms. Solvent cement 0.00

144 1/2" dia. PVC specials viz.Tees.

Materials
10 No - 1/2" dia tees 0.00
30 grms. Solvent cement 0.00

145 3/4" dia. PVC specials viz.Tees.

Materials
10 No - 3/4" dia tees 0.00
45 grms. Solvent cement 0.00

146 1" dia. PVC specials viz.Tees.

Materials
10 No - 1"dia tees 0.00
60 grms. Solvent cement 0.00
147 1 1/4" dia. PVC specials viz.Tees.

Materials
10 No - 1 1/4" tees 0.00
90 grms. Solvent cement 0.00

148 1 1/2" dia. PVC specials viz.Tees.

Materials
10 No - 1 1/2" dia tees 0.00
120 grms. Solvent cement 0.00

149 2" dia. PVC specials viz.Tees.

Materials
10 No - 2" dia tees 0.00
210 grms. Solvent cement 0.00

150 2 1/2" dia. PVC specials viz.Tees.

Materials
10 No - 2 1/2" tees 0.00
300 grms. Solvent cement 0.00

151 3" dia. PVC specials viz.Tees.

Materials
10 No - 3" tees 0.00
360 grms. Solvent cement 0.00

External drainage (EW pipes)


152 4" dia glazed earthanware pipes laid on 6" thick bedding in
cement concrete 1:3:6 (1 1/2") including excavation average
2'0" depth, backfilling with selected excavated materials and
concrete hauncing to joints.
Materials
50 No - 4" dia PVC pipes 0.00
0.75 cubes cement concrete 1:3:6 (1 1/2") 0.00
2 lbs. yarn 0.00
0.50 cwt cement (Jointing) 0.00
4.00 cubes excavation 0.00

Plumbing (C.I pipes)


153 4" dia C.I dia soil / vent pipe fixed vertically to wall jointed
with cement caulking (Specials measured seperately)

Materials
6'0" L.ft 4" dia C.I pipe 0.00
Add 10% wastage 0.00
5/16 lbs. yarn 0.00
1 - Timber plug 6" * 6" * 2" 0.00
2 - 3" Iron screws 0.00
2 lbs. cement 0.00

154 4" dia C.I dia pipe fixed to walls jointed with lead caulking
(Specials measured seperately)

Materials
6'0" L.ft 4" dia C.I pipe 0.00
Add 10% wastage 0.00
6 lbs lead 0.00
5/16 lbs. yarn 0.00
1 - Timber plug 6" * 6" * 2" 0.00
2 - 3" Iron screws 0.00
1/16 cwt firewood 0.00

Manholes & Gulleys


155 4" dia stoneware gulley with 6" *6" *6" gulley box including
excavation, 4" cement concrete 1:2:4 (3/4") base, surrounding
by 4 1/2" thick cement and sand 1:5 extended 6" above top of
gulley box including making connection 1/2" cement and sand
1:2 rendering internally and exposed faces finished smooth
with neat cement floating and providing C.I. grating on top
of gulley.

Materials
1 - 4" S.W gulley 0.00
4.00 cu.ft excavation 0.00
5.50 sq.ft 4 1/2" brickwork 0.00
0.80 cu.ft cement concrete 1:2:4 (3/4") 0.00
1.00 sq.ft 1/2" cement rendering 1:2 0.00
1 - 4" C.I grating. 0.00

156 Manhole 2'0" * 2'0" internally with invert depth not exceeding
2'0" including excavation, backfilling 6" cement concrete
1:2:4 (3/4") base with 3/8"dia meter mild steel rods at 4"
centres hothways, forming channels and benching in similar
concrete, 4 1/2'" walls in brick in cement 1:5, 1/2" thick
cement and sand 1:2 rendering internally and exposed surfaces
including channels, benching and 2" thick RCC removable
cover slab 2'3" * 2'3" inlet and outlet connection all complete
to working order.

Materials
35.00 cu.ft excavation 0.00
7.00 cu.ft cement concrete 1:2:4 (3/4") - 0.00
33.00 sq.ft 4 1/2" brickwork in cement 1:5 0.00
28.00 sq.ft 1/2" cement rendering 1:2 0.00

Sanitary fittings
157 22" * 16" glazed fire clay wash basin with 1/2" dia chromium
plated waste chain and stay, including fixing wash basin on
brackets.(Water supply and waste water connection measured
seperately)

Materials
1 - wash basin complete with brackets 0.00
1 - 1/2" tap 0.00
waste plug and chain 0.00
4 - wooden plugs 0.00
6 - 1 1/2" brass screws 0.00
2 lbs cement 0.00

158 Sink 24" * 15" * 7" overall vitreous china with rubber plug &
chromium plated chain waste carried on iron brackets painted
and fixed to walls, (Water supply and waste water connection
measured seperately)

Materials
1 - sink 24" * 15" * 7" 0.00
2 - L iron brackets 0.00
2 - lbs cement 0.00
2 - tapered wooden blocks 2" thick 0.00
8 - 1 1/2" dia brass screws 0.00

159 Closet pedestal type with L/L flushing cistern, flush pipe
double plastic seat cover, 1/2" dia stop cock, trap supplied &
fixed complete to working order.

Materials
1 - low level suite complete 0.00
1 - 1/2" dia stop cock 0.00
2 - lbs cement 0.00
1/4 cu. ft sand 0.00
2 - 1 1/2" dia brass screws 0.00

160 Closet squatting type with trap including high level cistern fixed
complete with flush pipe and 1/2" dia stop cock, all complete
to working order.

Materials
1 - squqrting pan with trap 0.00
2 - gals C.I cistern with 1 1/4" flush, pipe, chain & over flow 0.00
pipe.
1 - Clip 0.00
5 - Wooden plugs 0.00
1 doz. - 1 1/2" brass screws 0.00
1 - 1/2" stop cock 0.00
1/4 cwt cement 0.00
1/2 cu.ft metal 0.00
1/4 cu.ft sand 0.00

161 Vitreous china bidet suite fixed complete to working order.

Materials
1 - bidet 0.00

162 4 No. Rowl type urinal with trap and 2 gals capacity
autommatic flushing cistern & speaders compplete to working
orders

Materials
4 - urinal Bowls 0.00
1 - 2 gal. cistern 0.00
8 - Rawl plug 0.00
1 - spreader 0.00
4 - Wooden plugs 0.00
4 - 1 1/2" brass screws 0.00
4 - lbs.cement 0.00
1/8 cu.ft sand 0.00

Gutters & Downpipes


163 6" dia half round PVC eaves guter fixed to timber valance
board including gutter joiner and brackets fixed at 18' centres.
(Other specials paid seperately)

Materials
2 - 6" dia eaves gutter lengths 0.00
1 - joiner 0.00
17 - gutter brackets 0.00
34 - 3/4" brass screws 0.00
20 grms. Solvent cement 0.00
164 6" dia PVC gutter head

Consider 1 No. gutter head

Materials
1 - PVC gutter 0.00
1 - gutter joiners 0.00
2 - gutter brackets 0.00
12 grms. Solvent cement 0.00
4 - 3/4" brass screws 0.00

165 6" dia PVC mitres

Consider 1 No. mitre

Materials
1 - mitre bend 0.00
2 - gutter joints 0.00
2 - brackets 0.00
12 grms. Solvent cement 0.00
4 - 3/4" brass screws 0.00

166 6" dia PVC and caps

Materials
1 No. end cap 0.00
12 grms. Solvent cement 0.00

167 3 1/2" dia PVC rain water down pipes fixed to brickwall with
wooden plugs buried in wall.(special measured seperately)

Materials
2 - 3 1/2" dia pipe lengths 0.00
1 - 3 1/2" joiner 0.00
4 - PVC straps 0.00
8 - 1" brass screws 0.00
30 grms. Solvent cement 0.00

168 3 1/2" dia PVC elbow

Materials
1 - 60o80' elbows 0.00
32 grms. Solvent cement 0.00

169 3 1/2" dia PVC shoe

Materials
1 - 60o80' elbows 0.00
15 grms. Solvent cement 0.00
Calculation Rate Quantity Amount
Main Menu

- - - -
Description

- - - -

- - - -

- - - -

- - - -

- - - -

- - - -
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

Description

0.00
0.00 0.00 0.00 0.00

Description

0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

Description

0.00
0.00 0.00 0.00 0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

Description
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00

0.00
0.00
1.80 0.01 0.00 0.00

0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00

0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00

0.00
0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00 0.00 0.24 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00


0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00 0.00 0.00 0.00

Description
Description

0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00
Description

0.00
0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00

0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00

0.00 0.00 0.00 0.00


0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00
Description

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

Description
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00
0.00
0.00 0.00 8.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

Description

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00
0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00
0.00
0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

0.00
0.00 0.00 0.00 0.00

MAIN MENU

Description
Labour Cost

Item Description unit Unit Rate


Excavation
1 Removing top soil to a depth not exceeding 6" & depositing as
directed within site.
10days U/SK labourer 12.00 Sq 1.20
.

2 Excavation over site to reduce level, in any material except


rock requiring blasting including depositing and levelling as
directed up to a distance not exceeding 30'0".
15/8 day U/SK labourer 2.25 cube 2.25

3 Excavation in trenches for walls / column pits in soft / loose soil


from 0'0" to 5'0" deep and depositing excavated material to a
distance not exceeding 30'0" (Earth work support to be paid
seperatyely where necessary)
1 day U/SK labourer 1.20 cube 1.20

4 Excavation in trenches for walls / column pits in ordinary soil


from 0'0" to 5'0" deep and depositing excavated material not
exceeding 30'0".
2 1/2 days U/SK labourer 3.00 cube 3.00

5 Excavation in trenches for walls / column pits in Hard / dense


soil up to a depth of 5'0" and depositting excavated material up
to a distance not exceeding 30'0".
3 1/2 days U/SK labourer 4.20 cube 4.20

6 Excavation and trenches for walls/ column pits in mud / wet


soil up to a depth of 5'0" and depositting excavated material to
distance not exceeding 30'0"
3 days U/SK labourer 3.60 cube 3.60
.

7 Excavation in trenches for walls/ column pits in soft


distintegrated rock ( not requiring blasting) upto a depth of
5'0"& depositing excavted material to a distance not
exceeding 30'0".
2 1/2 days U/SK labourer 3.00 cube 3.00

8 Excavation in trenches for walls/ column pits in Hard


rock requiring blasting upto a depth of 5'0"& depositing
excavted material to a distance not
exceeding 30'0".
1 days SK labourer 1.20
2 days U/SK labourer 2.40 cube 3.60

9 Benching rock in foundation in 3"-6" steps. (Blasting prohibite)


Drilling,Chipping&welding -1 1/2 days SK labourer 1.80
Steel, fuel & forge - 25% of labour cost. 0.60
Collecting & Disposing - 1/2 days U/SK labourer 0.60 Sq.ft 0.30

10 Anti termite treatement


Anti termite treatement on excavated foundation and
compacted soil under floors
1/2 days U/SK labourer Sq. 0.60

11 Earthwork - Back filling & Compacting


Backfilling to trenches with selected earth available at site.
1 days U/SK labourer cube 1.20

12 Backfilling to trenches with imported material.


Filling & Compacting - 1 1/4 days U/SK labourer cube 1.50

13 Filling under floors including levelling, watering & compacting


in 3" layers with available and selected earth at site.
2 days U/SK labourer cube 2.40

14 Filling under floors including levelling, watering & compacting


in 3" layers with imported selected earth.
Filling & Compacting - 2 days U/SK labourer cube 2.40
15 Cutting turf sods, loading to hand carts and transporting up to
30 yqrds, laying and watering for 30 days. (Royalty for turf,
pegging and transport beyond 30 years paid seperately).
Cutting turf sods, loading and transporting to site and unloading
- 2 1/2 days U/SK labourer 3.00
Laying turf rods at site -
1/2 days U/SK labourer 0.60
Watering for 30 days -
1/2 days U/SK labourer 0.60 Sq. 4.20

Earth work support


16 Earthwork support (open planking) in trenches up to a depth
of 5'0"
1 Days carpenter 1.50
3 Days U/SK labourer 3.60 Sq 3.40

17 Earthwork support (close planking) in trenches up to a depth


of 5'0"
2 Days carpenter 3.00
6 Days U/SK labourer 7.20 Sq 6.80

18 Earthwork support (close planking) in deep excavation in


trenches up to a depthof 5'0"
8 Days carpenter 12.00
20 Days U/SK labourer 24.00 Sq 8.00

Concrete

19 Mixing concrete 1:3:6 (1 1/2")


1 day Skilled labourer 1.20
6 Days U/SK labourer 7.20 cube 8.40

20 Mixing concrete 1:2 1/2:5 (1")


1 day Skilled labourer 1.20
6 Days U/SK labourer 7.20 cube 8.40

21 Mixing concrete 1:2:4 (3/4")


1 day Skilled labourer 1.20
6 Days U/SK labourer 7.20 cube 8.40
22 Mixing concrete 1:1 1/2:4 (3/4")
1 day Skilled labourer 1.20
6 Days U/SK labourer 7.20 cube 8.40

23 Mixing concrete 1:1:2 (3/4")


1 day Skilled labourer 1.20
6 Days U/SK labourer 7.20 cube 8.40

24 2" thick cement concrete screed in foundation at depths not


exceeding 5'0"
1/8 day Skilled labourer 0.15
1/2 day U/SK labourer 0.60 cube 0.75

25 3" thick cement concrete screed in foundation at depths not


exceeding 5'0"
1/8 day Skilled labourer 0.15
1/2 day U/SK labourer 0.60 cube 0.75

26 6" thick cement concrete floor (mass concrete)


1/2 day Skilled labourer 0.60
1 1/4 day U/SK labourer 1.50 cube 2.10

27 Cement concrete 4 1/2" * 6" columns in ground floor.


1 day Skilled labourer 1.20
1 day carpenter 1.50
3 days U/SK labourer 3.60
1day SK labourer (Vibrator) 1.20
Curing -1days U/SK labourer 1.20 cube 19.33
L.ft 0.04

28 Cement concrete in 6" * 6" each 10'0" high ie 0.45 cubes.


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
3 days U/SK labourer 3.60
Curing - 1 1/2 days U/SK labourer 1.80 cube 21.33
L.ft 0.05

29 Cement concrete in 9" * 9" column in ground floor.


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
3 days U/SK labourer 3.60
Curing - 1 1/2 days U/SK labourer 0.60 cube 18.67
L.ft 0.28

30 Cement concrete in12" * 12" column in ground floor.


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
3 days U/SK labourer 3.60
1 1/2 days U/SK labourer (Curing) 1.80 cube 19.20
L.ft 0.19

31 Cement concrete in 13 1/2" * 13 1/2" column in ground floor.


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
3 days U/SK labourer 3.60
1 1/2 days U/SK labourer (Curing) 1.80 cube 18.82
L.ft 0.24

32 Cement concrete in 6" * 6" Beam up to 1st floor level.


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4 days U/SK labourer 4.80
1 1/2 days U/SK labourer (Curing) 1.80 cube 24.00
L.ft 0.06

33 Cement concrete in 9" * 6" Beam up to 1st floor level.


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4 days U/SK labourer 4.80
1 1/2 days U/SK labourer (Curing) 1.80 cube 24.00
L.ft 0.09

34 Cement concrete in 9" * 9" Beam up to 1st floor level.


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4 days U/SK labourer 4.80
1 1/2 days U/SK labourer (Curing) 1.80 cube 24.00
L.ft 0.14

35 5" thick R.CC floor slab in 1st floor


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4 days U/SK labourer 4.80
1 1/2 days U/SK labourer (Curing) 1.80 cube 24.00
L.ft 0.09

36 6" thick R.CC floor slab in 1st floor


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 4.80
1 1/2 days U/SK labourer (Curing) 1.80 Sq 9.00

37 Cement concrete in 4 1/2" * 6" lintols in ground floor


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 4.80
1 1/2 days U/SK labourer (Curing) 0.00 L.ft 0.04

38 Cement concrete in 9" * 9" lintols in ground floor


1 day mason 1.80
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 4.80
1 1/2 days U/SK labourer (Curing) 4.80 L.ft 0.18
39 Cement concrete in 9" *12" lintols in ground floor
1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 4.80
1 1/2 days U/SK labourer (Curing) 1.80 L.ft 0.18

40 Cement concrete in 12" *15" lintols in ground floor


1 day mason 1.50
1 day carpenter 1.50
1day SK labourer (vibrator) 1.20
4days U/SK labourer 4.80
1 3/4 days U/SK labourer (Curing) 2.10 L.ft 0.31

Timber Form work


41 Sawn timber form work to 9" * 9" cement concrete column in
ground floor
(a) Making mould
Fabricting
1/2 day carpenter 0.75
1/2 day U/SK labourer 0.60

(b) Assembling (per use)


1/4 day carpenter 0.38
1/4 day U/SK labourer 0.30

(c ) Dismantling cleaning & repairing (per use)


1/4 day carpenter 0.38
1/4 day U/SK labourer 0.30 Sq 18.00

42 Sawn timber form work to 9" * 9" cement concrete beams in


ground floor
(A) Making the mould
1 1/2 day carpenter 2.25
2 day U/SK labourer 2.40

(C) Labour & Sundries


a. 1 day carpenter 1.50
b. 2 day U/SK labourer 2.40

( D) Dismantling & cleaning


1/2 day carpenter 0.75
2 day U/SK labourer 2.40 Sq 21.27

43 Sawn timber formwork for underside of first floor slab


Making panels
3 days carpenter 4.50
3 days U/SK labourer 3.60

Labour & Sundries for Assembling


1 days carpenter 1.50
4 days U/SK labourer 4.80

Dismantling & cleaning


1/2 day carpenter 2.25
2 days U/SK labourer 2.40 Sq 9.52

Steel reinforcement
44 Mild steel / for steel reinforcement to lintels slabs beams for
column bent to shape laid in position and tied with G.I. wire
as directed
1 day blanksmith 1.50
1 day U/SK labourer 1.20 cwt 2.70
.
Brick work
45 Brick work in cement sand 1:5 in foundation upto D.P.C
3 days mason 4.50
4 days U/SK labourer 4.80 cube 9.30

46 Brick work in cement sand 1:8 in foundation upto D.P.C


3 days mason 4.50
4 days U/SK labourer 4.80 cube 9.30

47 Brick work in cement sand 1:5 in 4 1/2" thick walls in ground


floor.
1 1/2 days mason 2.25
2 days U/SK labourer 2.40 Sq 4.65

48 9" thick brick wall cement sand 1:5 in ground floor


2 1/4 days mason 3.38
3 3/4 days U/SK labourer 4.50
Scaffolding - Add 3% 0.24 Sq 8.11

49 Brick work 13 1/2" thick in cement sand 1:5 in superstructure


in ground floor
3 1/2 days mason 5.25
5 1/2 days U/SK labourer 6.60
Scaffolding - Add 2% 0.24 Sq 12.09

50 9" Brick walls in cement sand 1:8 in superstructure


in ground floor
2 1/4 days mason 3.38
3 days U/SK labourer 3.60
Scaffolding - Add 3% 0.21 Sq 7.18

51 4 1/2" thick Brick wall (wire cut) in cement sand 1:5 in ground
floor
1 1/2 days mason 2.25
2 days U/SK labourer 2.40
Scaffolding - Add 5% 0.23 Sq 4.88

52 9" thick in cement and sand 1:5 with wire cut Bricks
2 1/4 days mason 3.38
3 3/4 days U/SK labourer 4.50
Scaffolding - Add 3% 0.24 Sq 8.11

53 13 1/2" thick Brick wall (wire cut) in cement and sand 1:5 in
ground
3 3/4 days mason 5.63
5 1/2 days U/SK labourer 6.60
Scaffolding - Add 2% 0.24 Sq 12.47

54 Extra over for facing including raised pointing 1/8" in cement


and sand 1:1 mixture in ground floor
5 days mason 7.50
3 1/2 days U/SK labourer 4.20 Sq 11.70

55 3" thick floor paved in lime motor 2.5 in ground floor


1 1/4 days mason 1.88
2 1/2 days U/SK labourer 3.00 Sq 4.88

56 Steps 1'-1 1/2" * 0'6" in brick cement and sand 1:5 with 1/2"
thick cement and sand 1:2 redering including necessary
excavation.
1/2 days mason 0.75
1/2 days U/SK labourer 0.60 L.ft 0.14

57 Brick drains in cement and sand 1:5, 9" wide and 6"-9"
average depth including cement rendering 1/2" thick 1:2 to
exposed to faces with 1'6" ramp including necessary excavation
1 1/4 days mason 1.88
1 1/4 days U/SK labourer 1.50 L.ft 0.34

58 Brick drains in cement and sand 1:5, 9" wide and 6"-9"
average depth including cement rendering 1/2" thick 1:2 to
exposed to faces with 1'6" ramp including necessary excavation
1 days mason 1.50
1 1/4 days U/SK labourer 1.50 L.ft 0.30

Hollow block masonry


59 8" thick Hollow block work in cement and sand mortar 1:5 in
ground floor (cavities unfilled)
1 1/2 days mason 2.25
2 1/2 days U/SK labourer 2.70
Scaffolding - Add 3% 0.15 Sq 5.10

60 4" thick Hollow block masonry in cement and sand mortar 1:5
with cavities unfilled.
1 days mason 1.50
2 days U/SK labourer 2.40
Scaffolding - Add 5% 0.20 Sq 4.10

Random Rubble masonry


61 Random Rubble masonry in cement mortar 1:5 in foundation
4 days mason 6.00
6 days U/SK labourer 7.20 Cube 13.20
62 Random Rubble masonry in cement mortar 1:5 insuperstructure
4 1/2 days mason 6.38
7 days U/SK labourer 8.40
Scaffolding - Add3% 0.44 Cube 15.22

Pressed tilling
63 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and
pointing in neat cement in ground floor
4 days mason 6.00
4 days U/SK labourer 4.80
1/2 days U/SK labourer for polishing 0.60 Sq 11.40

wall tiling and Terra tiles


64 Glazzed tiles fixed to walls including bedding in cement mortar
1:2 and raking in ground floor. (special measured seperately)
4 days mason 6.00
4 days U/SK labourer 4.80
1/4 days U/SK labourer for polishing 0.30 Sq 11.10

65 Terrazo floor tiles on 1/2" thick cement and sand 1:2 in ground
floor.
4 days mason 6.00
4 days U/SK labourer 4.80
1/2 days U/SK labourer for polishing 0.60 Sq 11.40

Roofing
66 Timber framework for calicut pattorn tile hip roof in single
storey building consisting og wall plate, beam ridge plate,
raftters etc (preservative treatement to be measured seperately)
7days carpenter 10.50
8days U/SK labourer 9.60 Sq 3.35

67 Roof covering with calicut pattern clay tiles in single storeyed


building
3 days carpenter 4.50
3 days U/SK labourer 3.60 Sq 1.35

68 Timber framework for corrugated asbestoes sheet roof in


single.
2 1/2 days carpenter 3.75
3 days U/SK labourer 3.60 Sq 2.04
69 Roof covering with currugated asbestoes sheets (Timber frame
work and ridge covering measured seperately)
1 day carpenter 1.50
2 days U/SK labourer 2.40 Sq 1.08

70 One layer half round clay tiles over corrugated asbestoes roof
covering.
2 days U/SK labourer 2.04 Sq 2.04

71 Asbestoes close fittings ridging fixed complete with roofing


screws or bolts (hook)
1/4 day carpenter 0.38
1/4 days U/SK labourer 0.30 L.ft 0.05

72 Ridging covering with culicut pattern ridge tiles bedded in


cement lime mortar 1:1:4
1/4 days mason 0.38
1/4 days U/SK labourer 0.30 L.ft 0.06

73 1/4" * 9" high valance board fixed with brass screws to ends
of rafters (for tile roofing)
3 day carpenter 4.50
3days U/SK labourer 3.60
Scaffolding - Add 5% 0.18 L.ft 0.08

74 3/4" * 9" high barge board fixed with brass screws at 2'0"
centres to sides of rafters.
3 days carpenter 4.50
3 days U/SK labourer 3.60
Scaffolding - Add 5% 0.18 L.ft 0.08

75 Roof plumbing
18 B.W.G.(1.2mm) galvanized iron sheet valley gutter 3'0"
girth over all once bent with end laps not less than 9" width
including 3/4" tongued and grooved planks laid to slope and
profile in timber members.
(a) Fixing boarding and applying wood preservative --
1 day carpenter 1.50
1 day carpenter U/SK labourer 1.20
(b) Making and firing G.I sheets --
1/2 day tinker 0.75
1/2 day tinker U/SK labourer 0.75
© Building sides --
1/4 days mason 0.38
1/2 days U/SK labourer 0.60 L.ft 0.35

76 18 B.W.G.(1.2mm) galvanized iron flashing 1'6" girth overall


3 times bent with end laps not less than 6" width, lead
soldered turned and tucked up to not less than 6" in to chase
cut in wall and pointed in cement mortar 1:2 lower end
dressed over roof covering not less than 1'0" wide
Cutting bending, soldering & fixing --
1/2 day tinker 0.75
1/8 days mason (caulking) 0.19
1/2 day U/SK labourer 0.60 L.ft 0.10

77 Timber framework for 4'0" * 4'0" flat asbestoes ceiling


(sheet measured seperately) comprising of 4" * 2" joist and
2" * 2" bearers in class I timber.
2 1/2 days carpenter 3.75
1/2 days mason 0.75
1 1/2 day U/SK labourer 1.80 Sq 3.23
Scaffolding Add 3%

Ceiling
78 Horizontal ceiling lining using 4'0" * 4'0" flat asbetoes cement
sheets fixed with including beading and cove moulding on
timber framework. (Timber frame work & painting measured
seperately)
1 1/2 days carpenter 2.25
2 days U/SK labourer 2.40
Scaffolding Add 3% 0.14 Sq 2.46

79 3/4" thick tongued and grooved Lunumidella ceiling boards


fixed horizontal on 4" * 2" class I timber joist at 2'0" centres
with 1 1/2" brass nails.
Making holes, fixing joists & making good.
1day carpenter 1.50
1day mason 1.50
3 day U/SK labourer 3.60

Fixing ceiling boards


3 days carpenter 4.50
4 days U/SK labourer 4.80
Scaffolding Add 4% 0.37 Sq 8.34

80 3/4" *6" wide tongued and grooved Lunumidella ceiling boards


fixed underside of roof rafters, (existing) 1 1/2" brass nails
including levelling with timber strips where necessary.
3 days carpenter 4.50
6 days U/SK labourer 7.20
Scaffolding Add 3% 0.35 Sq 6.69

Doors and Windows


81 Door single hung 3'3" * 7'0" high overall with frame having
1 1/4" thick shash & 3 1/4" * 2 3/4" frame. (glazing, iron
mongery and painting measured seperately).
5 days carpenter 7.50
1 1/2 days U/SK labourer 1.80 Sq.ft 0.41

82 Door galazed and panneled double hung 4'0" * 7'0" high


overall with frame including 1 1/4" thick sash and 3 3/4"*2 3/4"
frame.(glazing,iron mongery and painting measured seperately)
6 days carpenter 9.00
2 days U/SK labourer 2.40 Sq.ft 0.41

83 Plywood door single hung 3'1 1/2" * 6'1 1/2" overall with
frame having 1 1/4" thick sash and 3 1/4" * 2 3/4" frame.
(iron mongery and painting measured seperately)
3/4 day carpenter 1.13
3/8 day U/SK labourer 0.45
1/4 day mason (Fixing frame) 0.38
1/4 day U/SK labourer (- do -) 0.30 Sq.ft 0.10

84 Door ledged, braced and battened single hung 2'6" * 6'6"


overall with frame having 7/8" thich tongued & grooved planks
and 3 3/4"*2 3/4" frame(iron mongery and painting measured
seperately)
2 1/2 day carpenter 3.75
1 day U/SK labourer 1.20
1day mason (Fixing frame) 1.50
1/4 day U/SK labourer (- do -) 1.50 Sq.ft 0.49

85 Window, glazed 7'0" * 4'0" high overall with frame comprising


3 No openable sashes and 3 3/4" * 2 3/4" frame and mullions.
(glazing,iron mongery and painting measured seperately)
6 days carpenter 9.00
2 1/2 days U/SK labourer 3.00
1/2 day mason (Fixing frame) 0.75
1/2 day U/SK labourer (- do -) 0.60 Sq.ft 0.61

86 1/4" clear sheet glass panes exceeding 1'0" but not exceedingly
4 square feet cut and fixed with timber beadings to doors and
windows.
1/2 day glazier 0.75
1/2 day U/SK labourer 0.60 Sq.ft 0.15

Iron mongaries
87 Ironmongery
1/2 day carpenter 0.75
1/2 day U/SK labourer 0.60 Pairs 0.90

88 Tee hinges 6" * 12"


2 hrs carpenter 0.38
2 hrs U/SK labourer 0.30 Pairs 0.68

89 Rim lock
2 hrs carpenter 0.38
2 hrs U/SK labourer 0.30 No 0.68

90 Mortice lock
1/2 day carpenter 0.75
1/2 day U/SK labourer 0.60 No 1.35

91 Casement stays
2 hrs carpenter 0.38
2 hrs U/SK labourer 0.30 No 0.68

92 Door closer (Hydraulic)


2 hrs carpenter 0.38
2 hrs U/SK labourer 0.30 No 0.68

93 Tower / skeleton brass bolts.


1/2 hr carpenter 0.09
1/2 hr U/SK labourer 0.08 No 0.17

94 Barrel bolt 4"


1/2 hr carpenter 0.09
1/2 hr U/SK labourer 0.09 No 0.19

95 Casement fasteners
1/2 day carpenter 0.75
1/2 day U/SK labourer 0.60 No 0.23

96 Spring loadea fanlight catches.


1/2 day carpenter 0.75
1/2 day U/SK labourer 0.60 No 0.23

97 Draw rings
1 hr carpenter 0.19
1 hr U/SK labourer 0.15 No 0.06

Plastering
98 3/4" thick DPC, in cement sand 1:2 finished with 2 coats not
tar & blinded with sand.
1 1/2 days mason 2.25
2 1/2 days U/SK labourer 3.00 Sq 5.25

99 5/8" thick plastering to wall in lime and sand 2:5 including


floating with lime putty.
1 days mason 1.50
2 3/4 days U/SK labourer 3.30
Scaffolding - Add 3% 0.14 Sq 4.94

100 5/8" thick plastering to wall in cement and sand 1:3 including
cement floating .
1 day mason 1.50
1 1/2 days U/SK labourer 1.80
Scaffolding - Add 3% 0.10 Sq 3.40

101 3/8" thick plastering to soffit slab in cement and sand 1:3
including floating with lime putty.
2 1/2 days mason 3.75
2 1/2 days U/SK labourer 3.00
Scaffolding - Add 3% 0.20 Sq 6.95

102 3/8" thick plastering to sides and soffit of beams in cement


and sand 1:3 including floating with lime putty.
2 days mason 2.40
2 days U/SK labourer 2.40
Scaffolding - Add 3% 0.14 Sq 4.94

103 5/8" thick plastering to wall in lime cement and sand 1:1:5
finished semi - rough with wooden float
1 day mason 1.50
1 1/2 days U/SK labourer 1.80
Scaffolding - Add 3% 0.10 Sq 3.40

104 5/8" thick plastering to wall in lime cement and sand 1:1:5
finished smooth with lime putty floating
1 1/2 day mason 2.25
1 1/2 days U/SK labourer 1.80
Scaffolding - Add 3% 0.12 Sq 4.17

105 1/2" thick rendering in cement and sand 1:3 finished smooth.
1 day mason 1.50
1 1/2 days U/SK labourer (Curing) 1.80 Sq 3.30

106 1/2" thick rendering in cement and sand 1:2 in floors, finished
smooth.
1 day mason 1.50
1 1/2 days U/SK labourer (Curing) 1.80
1 1/2 days U/SK labourer 1.80 Sq 5.10

107 3/4" thick rendering in cement and sand 1:3 finished smooth.
1 1/4 day mason 1.88
2 days U/SK labourer 2.40
1/4 days U/SK labourer (Curing) 0.30 Sq 4.58

`
108 3/4" thick rendering in cement and sand 1:2 in floors, finished
smooth.
1 1/4 day mason 1.88
1/4 days U/SK labourer (Curing) 0.30
2 days U/SK labourer 2.40 Sq 4.57

109 3/4" thick rendering in cement and sand 1:2 in coloured


cement floors, finished smooth.
1 1/4 day mason 1.88
1/4 days U/SK labourer (Curing) 0.30
2 days U/SK labourer 2.40 Sq 4.57

110 1/2" * 6" skirting in cement & sand 1:3 projected or flush to
walls finished with floating including forming groove.
3/8 day mason 0.56
5/16 days U/SK labourer 0.38 L.FT 0.09

Painting & Decorating


111 Prepare and apply one coat of preservative (oil type) to
structural timber including touching up cut ends etc.After fixing.
3/4 day painter 1.13
1/2 day U/SK labourer 0.60 Sq 1.73

112 Prepare surface of steel truss and apply two coats of


anticorrosive primer
1 1/2 day painter 2.25
1/2 day U/SK labourer 0.60 Sq 2.85
113 Apply one coat of anti - corrosive primer two coats enamel
paint on already shop primed and erected steel roof truss.
2 1/2 day painter 3.75
1 day U/SK labourer 1.20
Scaffolding - Ad 3% 0.15 Sq 5.10

114 Prepare and apply two coats primer and finishing coat of
enamel paint to mild steel (angle/ flat)
1/2 day painter 0.75
3/4 day U/SK labourer 0.90 Sq 3.30

115 Painting steel on new work with two coats of anti - coropsive
paint.
1 1/2 day painter 2.25 Sq 2.25

116 Painting new timber work with two coats wood preservative
1/2 day painter 0.75 Sq 0.75

117 Preparing and painting wood work with primer and 2 coats
enamel paint
1 1/2 day painter 2.25
1/2 day U/SK labourer 0.60 Sq 2.85

118 White or colour washing two coats in single storey


1 1/2 day painter 2.25
2 1/2 day U/SK labourer 3.00
Scaffolding - Add 3% 0.16 Sq 0.54

119 White or colour washing two coats in single storey


1/2 day painter 0.75
1/2 day U/SK labourer 0.60
Scaffolding - Add 3% 0.04 Sq 0.14

120 Prepare and apply one coat of alkali resistant premier and two
coats of emulsion paint to walls
1 1/4 day painter 1.88
Scaffolding - Add 3% 0.06 Sq 1.93
121 Cement washing to walls of single storeyd building 2 coats
2 days painter 3.00
2 days U/SK labourer 2.40
Scaffolding - Add 3% 0.16 Sq 0.56

122 Painting walls with emulsion paint (2 coats)


3/4 days painter 1.13
Scaffolding - Add 3% 0.03 Sq 1.16

123 Prepare and apply one coat of alkali resistant premier and two
coats of emulsion paint to soffit of slabs.
1 3/4 day painter 2.63
Scaffolding - Add 3% 0.08 Sq 2.70

124 Varnishing two coats with copal varnishing after sandpapering


1/2 day painter 0.75
1/2 days U/SK labourer 0.60 Sq 1.35

125 Wax polishing to timber in panels & floors


3 hrs. U/SK labourer 0.45 Sq 0.45

126 Plumbing (PVC)


1/2" diameter PVC pipes fixed to walls (specials paid
seperatyely)
1 hr. Plumber 0.19
1 hr. U/SK labourer 0.15 L.ft 0.03

127 3/4" diameter PVC pipes fixed to walls (specials paid


seperatyely)
1 hr. Plumber 0.19
1 hr. U/SK labourer 0.15 L.ft 0.03

128 1" diameter PVC pipes fixed to walls (specials paid


seperatyely)
1/2 day Plumber 0.75
1/2 day U/SK labourer 0.60 L.ft 0.01
.

129 1 1/4" diameter PVC pipes fixed to walls (specials paid


seperatyely)
3/4 day Plumber 1.13
3/4day U/SK labourer 0.90 L.ft 0.02

130 1 1/2" diameter PVC pipes laid to walls (specials paid


seperatyely)
3/4 day Plumber 1.13
3/4day U/SK labourer 0.90 L.ft 0.02

131 2" diameter PVC pipes laid to walls (specials paid


seperatyely)
3/4 day Plumber 1.13
3/4day U/SK labourer 0.90 L.ft 0.02

132 3" diameter PVC pipes fixed to walls (specials paid


seperatyely)
1 day Plumber 1.50
1 day U/SK labourer 1.20 L.ft 0.03

133 Excavation for laying 1/2" to 3" diameter PVC pipes in ground
not less than 1" - 6" deep, back filling & compacting
2 1/4 days U/SK labourer 2.70 L.ft 0.03

134 Chasing brickwork for laying 1/2" to 1 12" diameter PVC


pipes and making good average depth 2" (Pipes & specials
paid seperately)
3 days mason 4.50
3 days U/SK labourer 3.60 L.ft 0.08

135 Chasing brickwork for laying 1/2" to 3" diameter PVC


pipes in ground or floor and making good. Average depth 3"
(Pipes & specials measured seperately)
3 1/2 days mason 5.25
3 1/2 days U/SK labourer 4.20 L.ft 0.09

136 1/2" elbows PVC specials viz - elbows / bends / sockets.


2 hrs plumber 0.38 No 0.04

137 3/4"dia PVC specials viz - elbows / bends / sockets.


2 hrs plumber 0.38 No 0.04

138 1" dia PVC specials viz - elbows / bends / sockets.


2 hrs plumber 0.38 No 0.04

139 1 1/4" dia PVC specials viz - elbows / bends / sockets.


2 hrs plumber 0.38 No 0.04

140 1 1/2" dia PVC specials viz - elbows / bends / sockets.


1/2 day plumber 0.75 No 0.08

141 2" dia PVC specials viz - elbows / bends / sockets.


1/2 day plumber 0.75 No 0.08

142 2 1/2" dia PVC specials viz - elbows / bends / sockets.


1/2 day plumber 0.75 No 0.08

143 3" dia PVC specials viz - elbows / bends / sockets.


1/2 day plumber 0.75 No 0.08

144 1/2" dia. PVC specials viz.Tees.


1/2 day plumber 0.75 No 0.08

145 3/4" dia. PVC specials viz.Tees.


1/2 day plumber 0.75 No 0.08

146 1" dia. PVC specials viz.Tees.


1/2 day plumber 0.75 No 0.08

147 1 1/4" dia. PVC specials viz.Tees.


1/2 day plumber 0.75 No 0.08

148 1 1/2" dia. PVC specials viz.Tees.


1 day plumber 1.50 No 0.15

149 2" dia. PVC specials viz.Tees.


1 day plumber 1.50 No 0.15

150 2 1/2" dia. PVC specials viz.Tees.


1 1/2 day plumber 2.25 No 0.23

151 3" dia. PVC specials viz.Tees.


1 1/2 day plumber 2.25 No 0.23

External drainage (EW pipes)


152 4" dia glazed earthanware pipes laid on 6" thick bedding in
cement concrete 1:3:6 (1 1/2") including excavation average
2'0" depth, backfilling with selected excavated materials and
concrete hauncing to joints.
Laying concrete bedding
1 1/2 days U/SK labourer 1.80
Laying & testing pipes
2 days plumber 3.00
2 days U/SK labourer 2.40
Backfilling - 2 1/2 days U/SK labourer 3.75 L.ft 0.11

Plumbing (C.I pipes)


153 4" dia C.I dia soil / vent pipe fixed vertically to wall jointed
with cement caulking (Specials measured seperately)
1/4 day plumber 0.38
1/4 day U/SK labourer 0.30
Scaffolding - Add 5% 0.03 L.ft 0.12

154 4" dia C.I dia pipe fixed to walls jointed with lead caulking
(Specials measured seperately)
1/4 day plumber 0.38
1/4 day U/SK labourer 0.30
Scaffolding - Add 5% 0.03 L.ft 0.12
Add - 10% for sundries in cement and cement

Manholes & Gulleys


155 4" dia stoneware gulley with 6" *6" *6" gulley box including
excavation, 4" cement concrete 1:2:4 (3/4") base, surrounding
by 4 1/2" thick cement and sand 1:5 extended 6" above top of
gulley box including making connection 1/2" cement and sand
1:2 rendering internally and exposed faces finished smooth
with neat cement floating and providing C.I. grating on top
of gulley.
1/2 day mason 0.75
1/2 day U/SK labourer 0.60 No 1.35

156 Manhole 2'0" * 2'0" internally with invert depth not exceeding
2'0" including excavation, backfilling 6" cement concrete
1:2:4 (3/4") base with 3/8"dia meter mild steel rods at 4"
centres hothways, forming channels and benching in similar
concrete, 4 1/2'" walls in brick in cement 1:5, 1/2" thick
cement and sand 1:2 rendering internally and exposed surfaces
including channels, benching and 2" thick RCC removable
cover slab 2'3" * 2'3" inlet and outlet connection all complete
to working order.
1 1/2 day mason 2.25
2 1/2 day U/SK labourer 3.00 No 5.25
.
Sanitary fittings
157 22" * 16" glazed fire clay wash basin with 1/2" dia chromium
plated waste chain and stay, including fixing wash basin on
brackets.(Water supply and waste water connection measured
seperately)
1/2 day mason 0.75
1 day U/SK labourer 1.20 No 1.95

158 Sink 24" * 15" * 7" overall vitreous china with rubber plug &
chromium plated chain waste carried on iron brackets painted
and fixed to walls, (Water supply and waste water connection
measured seperately)
1/2 day mason 0.75
1 day U/SK labourer 1.20 No 1.95

159 Closet pedestal type with L/L flushing cistern, flush pipe
double plastic seat cover, 1/2" dia stop cock, trap supplied &
fixed complete to working order.
1/4 day mason 0.38
1 day plumber 1.50
1 day U/SK labourer 1.20 No 3.08

160 Closet squatting type with trap including high level cistern fixed
complete with flush pipe and 1/2" dia stop cock, all complete
to working order.
1/2day mason 0.75
1 day plumber 1.50
1 day U/SK labourer 1.20 No 3.45

161 Vitreous china bidet suite fixed complete to working order.


1 day plumber 1.50
1 day U/SK labourer 1.20 No 2.70

162 4 No. Rowl type urinal with trap and 2 gals capacity
autommatic flushing cistern & speaders compplete to working
orders
1/4day mason 0.38
1 day plumber 1.50
1 day U/SK labourer 1.20 No 3.08

Gutters & Downpipes


163 6" dia half round PVC eaves guter fixed to timber valance
board including gutter joiner and brackets fixed at 18' centres.
(Other specials paid seperately)
1/2 day plumber 0.75
1/2 day U/SK labourer 0.60
Scaffolding - Add 5% 0.09 L.ft 0.06

164 6" dia PVC gutter head


1/8 day plumber 0.19
1/8 day U/SK labourer 0.15
Scaffolding - Add 5% 0.02 No 0.35

165 6" dia PVC mitres


1/8 day plumber 0.19
1/8 day U/SK labourer 0.15
Scaffolding - Add 5% 0.02 No 0.35

166 6" dia PVC and caps


1/16day plumber 0.09
1/16 day U/SK labourer 0.08
Scaffolding - Add 5% 0.01 No 0.18
167 3 1/2" dia PVC rain water down pipes fixed to brickwall with
wooden plugs buried in wall.(special measured seperately)
1/3 day plumber 0.50
1/3 day U/SK labourer 0.40
Scaffolding - Add 5% 0.05 L.ft 0.04

168 3 1/2" dia PVC elbow


1/16day plumber 0.09
1/16 day U/SK labourer 0.08
Scaffolding - Add 5% 0.01 No 0.18

169 3 1/2" dia PVC shoe


1/16 day plumber 0.09
1/16 day U/SK labourer 0.08 No 0.17
t

Quantity Amount Main Menu

Description
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

Description

0.00 0.00

Description

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

Description

0.00 0.00

0.00 0.00

0.00 0.00

Description

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

Description

0.00 0.00
0.00 0.00

0.00 0.00

Description

0.00 0.00
Description

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

Description

0.00 0.00

0.00 0.00

Description

0.24 3.17
0.00 0.00

Description

0.00 0.00

Description

0.00 0.00

0.00 0.00

Description

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

Description
0.00 0.00

0.00 0.00

0.00 0.00

Description

0.00 0.00
0.00 0.00

0.00 0.00

Description

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

Description

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

Description

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

Description

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

Description

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

Description

8.00 0.88

Description

8.00 0.95

0.00 0.00

Description
0.00 0.00

0.00 0.00

Description

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00

Description

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00
0.00 0.00

0.00 0.00

0.00 0.00
Calculation Sheat

Item Description Length (ft)


Excavation
1 Removing top soil to a depth not exceeding 6" & depositing as
directed within site.

2 Excavation over site to reduce level, in any material except


rock requiring blasting including depositing and levelling as
directed up to a distance not exceeding 30'0". 0.00

3 Excavation in trenches for walls / column pits in soft / loose soil


from 0'0" to 5'0" deep and depositing excavated material to a
distance not exceeding 30'0" (Earth work support to be paid
seperatyely where necessary) 0.00

4 Excavation in trenches for walls / column pits in ordinary soil


from 0'0" to 5'0" deep and depositing excavated material not
exceeding 30'0". 0.00

5 Excavation in trenches for walls / column pits in Hard / dense


soil up to a depth of 5'0" and depositting excavated material up
to a distance not exceeding 30'0". 0.00

6 Excavation and trenches for walls/ column pits in mud / wet


soil up to a depth of 5'0" and depositting excavated material to
distance not exceeding 30'0" 0.00

7 Excavation in trenches for walls/ column pits in soft


distintegrated rock ( not requiring blasting) upto a depth of
5'0"& depositing excavted material to a distance not
exceeding 30'0". 0.00

8 Excavation in trenches for walls/ column pits in Hard


rock requiring blasting upto a depth of 5'0"& depositing
excavted material to a distance not
exceeding 30'0". 0.00

9 Benching rock in foundation in 3"-6" steps. (Blasting prohibite) 0.00

10 Anti termite treatement


Anti termite treatement on excavated foundation and
compacted soil under floors 0.00

11 Earthwork - Back filling & Compacting


Backfilling to trenches with selected earth available at site. 0.00

12 Backfilling to trenches with imported material. 0.00

13 Filling under floors including levelling, watering & compacting


in 3" layers with available and selected earth at site. 0.00

14 Filling under floors including levelling, watering & compacting


in 3" layers with imported selected earth. 0.00

15 Cutting turf sods, loading to hand carts and transporting up to


30 yqrds, laying and watering for 30 days. (Royalty for turf,
pegging and transport beyond 30 years paid seperately). 0.00

Earth work support


16 Earthwork support (open planking) in trenches up to a depth
of 5'0" 0.00

17 Earthwork support (close planking) in trenches up to a depth


of 5'0" 0.00

18 Earthwork support (close planking) in deep excavation in


trenches up to a depthof 5'0" 0.00
Concrete

Premeable

Assumption

1. Mixing concrete using a concrete mixer 14/10 cu.ft capacity


and manual loading are the basis on which the norms are
worked.

2. A gang of 1 skilled and 6 un skilled labourers produce 3.00


cubes of concrete per day using a 14/10 cu.ft capacity mixer.
This is per accepted practice.

3.The production of concrete is at the mixer site transporting


mixed concrete and placing same in position is paid for
seperately.

4.In concrete items 26 to 39 both inclusive, placing of concrete


in columns, beams and floor slabs on the ground floor the
labour component allowed is for the placing of concrete
betweeen the ground floor and top of the 1st floor slab which
area is calleded the ground floor area. Similarly the area
between the top of the 1st floor slab and the top of the 2nd
floor slab is called the 1st floor area etc.

19 Mixing concrete 1:3:6 (1 1/2") 0.00

20 Mixing concrete 1:2 1/2:5 (1") 0.00

21 Mixing concrete 1:2:4 (3/4") 0.00

22 Mixing concrete 1:1 1/2:3 (3/4") 0.00

23 Mixing concrete 1:1:2 (3/4") 0.00

24 2" thick cement concrete screed in foundation at depths not


exceeding 5'0" 0.00

25 3" thick cement concrete screed in foundation at depths not


exceeding 5'0" 0.00

26 6" thick cement concrete floor (mass concrete) 0.00

27 Cement concrete 4 1/2" * 6" columns in ground floor. 0.00

28 Cement concrete in 6" * 6"column in G.F each 10'0" high ie 0.45 cubes. 0.00

29 Cement concrete in 9" * 9" column in ground floor. 0.00

30 Cement concrete in12" * 12" column in ground floor. 0.00

31 Cement concrete in 13 1/2" * 13 1/2" column in ground floor. 0.00

32 Cement concrete in 6" * 6" Beam up to 1st floor level. 0.00

33 Cement concrete in 9" * 6" Beam up to 1st floor level. 0.00

34 Cement concrete in 9" * 9" Beam up to 1st floor level. 0.00

35 5" thick R.CC floor slab in 1st floor 0.00

36 6" thick R.CC floor slab in 1st floor 0.00

37 Cement concrete in 4 1/2" * 6" lintols in ground floor 0.00

38 Cement concrete in 9" * 9" lintols in ground floor 0.00


39 Cement concrete in 9" *12" lintols in ground floor 0.00

40 Cement concrete in 12" *15" lintols in ground floor 0.00

Timber Form work


41 Sawn timber form work to 9" * 9" cement concrete column in
ground floor 0.00

42 Sawn timber form work to 9" * 9" cement concrete beams in


ground floor 0.00

43 Sawn timber formwork for underside of first floor slab 0.00

Steel reinforcement
44 Mild steel / for steel reinforcement to lintels slabs beams for
column bent to shape laid in position and tied with G.I. wire
as directed

Brick work
45 Brick work in cement sand 1:5 in foundation upto D.P.C 0.00

46 Brick work in cement sand 1:8 in foundation upto D.P.C 0.00

47 Brick work in cement sand 1:5 in 4 1/2" thick walls in ground


floor. 0.00

48 9" thick brick wall cement sand 1:5 in ground floor 0.00

49 Brick work 13 1/2" thick in cement sand 1:5 in superstructure


in ground floor 0.00
50 9" Brick walls in cement sand 1:8 in superstructure
in ground floor 0.00

51 4 1/2" thick Brick wall (wire cut) in cement sand 1:5 in ground
floor 0.00

52 9" thick in cement and sand 1:5 with wire cut Bricks 0.00

53 13 1/2" thick Brick wall (wire cut) in cement and sand 1:5 in
ground 0.00

54 Extra over for facing including raised pointing 1/8" in cement


and sand 1:1 mixture in ground floor 0.00

55 3" thick floor paved in lime motor 2.5 in ground floor 0.00

56 Steps 1'-1 1/2" * 0'6" in brick cement and sand 1:5 with 1/2"
thick cement and sand 1:2 redering including necessary
excavation. 0.00

57 Brick drains in cement and sand 1:5, 9" wide and 6"-9"
average depth including cement rendering 1/2" thick 1:2 to
exposed to faces with 1'6" ramp including necessary excavation 0.00

58 Brick drains in cement and sand 1:5, 9" wide and 6"-9"
average depth including cement rendering 1/2" thick 1:2 to
exposed to faces with 1'6" ramp including necessary excavation 0.00

Hollow block masonry


59 8" thick Hollow block work in cement and sand mortar 1:5 in
ground floor (cavities unfilled) 0.00
60 4" thick Hollow block masonry in cement and sand mortar 1:5
with cavities unfilled. 0.00

Random Rubble masonry


61 Random Rubble masonry in cement mortar 1:5 in foundation 2.00

62 Random Rubble masonry in cement mortar 1:5 insuperstructure 0.00

Pressed tilling
63 Pressed floor tiles bedded in 1/2" cement mortar 1:2 and
pointing in neat cement in ground floor 0.00

wall tiling and Terrazo tiles


64 Glazzed tiles fixed to walls including bedding in cement mortar
1:2 and raking in ground floor. (special measured seperately) 0.00

65 Terrazo floor tiles on 1/2" thick cement and sand 1:2 in ground
floor. 0.00

Roofing
66 Timber framework for calicut pattorn tile hip roof in single
storey building consisting og wall plate, beam ridge plate,
raftters etc (preservative treatement to be measured seperately) 0.00

67 Roof covering with calicut pattern clay tiles in single storeyed


building 0.00

68 Timber framework for corrugated asbestoes sheet roof in


single. 0.00

69 Roof covering with currugated asbestoes sheets (Timber frame


work and ridge covering measured seperately) 0.00
70 One layer half round clay tiles over corrugated asbestoes roof
covering. 0.00

71 Asbestoes close fittings ridging fixed complete with roofing


screws or bolts (hook) 0.00

72 Ridging covering with culicut pattern ridge tiles bedded in


cement lime mortar 1:1:4 0.00

73 1/4" * 9" high valance board fixed with brass screws to ends
of rafters (for tile roofing) 0.00

74 3/4" * 9" high barge board fixed with brass screws at 2'0"
centres to sides of rafters. 0.00

Roof plumbing

75 18 B.W.G.(1.2mm) galvanized iron sheet valley gutter 3'0"


girth over all once bent with end laps not less than 9" width
including 3/4" tongued and grooved planks laid to slope and
profile in timber members. 0.00

76 18 B.W.G.(1.2mm) galvanized iron flashing 1'6" girth overall


3 times bent with end laps not less than 6" width, lead
soldered turned and tucked up to not less than 6" in to chase
cut in wall and pointed in cement mortar 1:2 lower end
dressed over roof covering not less than 1'0" wide 0.00

77 Timber framework for 4'0" * 4'0" flat asbestoes ceiling


(sheet measured seperately) comprising of 4" * 2" joist and
2" * 2" bearers in class I timber. 0.00

Ceiling
78 Horizontal ceiling lining using 4'0" * 4'0" flat asbetoes cement
sheets fixed with including beading and cove moulding on
timber framework. (Timber frame work & painting measured
seperately) 0.00

79 3/4" thick tongued and grooved Lunumidella ceiling boards


fixed horizontal on 4" * 2" class I timber joist at 2'0" centres
with 1 1/2" brass nails. 0.00

80 3/4" *6" wide tongued and grooved Lunumidella ceiling boards


fixed underside of roof rafters, (existing) 1 1/2" brass nails
including levelling with timber strips where necessary. 0.00

Doors and Windows


81 Door single hung 3'3" * 7'0" high overall with frame having
1 1/4" thick shash & 3 1/4" * 2 3/4" frame. (glazing, iron
mongery and painting measured seperately). 0.00

82 Door galazed and panneled double hung 4'0" * 7'0" high


overall with frame including 1 1/4" thick sash and 3 3/4"*2 3/4"
frame.(glazing,iron mongery and painting measured seperately) 0.00

83 Plywood door single hung 3'1 1/2" * 6'1 1/2" overall with
frame having 1 1/4" thick sash and 3 1/4" * 2 3/4" frame.
(iron mongery and painting measured seperately) 0.00

84 Door ledged, braced and battened single hung 2'6" * 6'6"


overall with frame having 7/8" thich tongued & grooved planks
and 3 3/4"*2 3/4" frame(iron mongery and painting measured
seperately) 0.00

85 Window, glazed 7'0" * 4'0" high overall with frame comprising


3 No openable sashes and 3 3/4" * 2 3/4" frame and mullions.
(glazing,iron mongery and painting measured seperately) 0.00

86 1/4" clear sheet glass panes exceeding 1'0" but not exceedingly
4 square feet cut and fixed with timber beadings to doors and
windows. 0.00
Iron mongaries
87 Ironmongery -

88 Tee hinges 6" * 12" -

89 Rim lock -

90 Mortice lock -

91 Casement stays -

92 Door closer (Hydraulic) -

93 Tower / skeleton brass bolts. -

94 Barrel bolt 4" -

95 Casement fasteners -

96 Spring loadea fanlight catches. -

97 Draw rings -

Plastering
98 3/4" thick DPC, in cement sand 1:2 finished with 2 coats not
tar & blinded with sand. 0.00

99 5/8" thick plastering to wall in lime and sand 2:5 including


floating with lime putty. 0.00
100 5/8" thick plastering to wall in cement and sand 1:3 including
cement floating . 0.00

101 3/8" thick plastering to soffit slab in cement and sand 1:3
including floating with lime putty. 0.00

102 3/8" thick plastering to sides and soffit of beams in cement


and sand 1:3 including floating with lime putty. 0.00

103 5/8" thick plastering to wall in lime cement and sand 1:1:5
finished semi - rough with wooden float 0.00

104 5/8" thick plastering to wall in lime cement and sand 1:1:5
finished smooth with lime putty floating 0.00

105 1/2" thick rendering in cement and sand 1:3 finished smooth. 0.00

106 1/2" thick rendering in cement and sand 1:2 in floors, finished
smooth. 0.00

107 3/4" thick rendering in cement and sand 1:3 finished smooth. 0.00

108 3/4" thick rendering in cement and sand 1:2 in floors, finished
smooth. 0.00

109 3/4" thick rendering in cement and sand 1:2 in coloured


cement floors, finished smooth. 0.00

110 1/2" * 6" skirting in cement & sand 1:3 projected or flush to
walls finished with floating including forming groove. 0.00
Painting & Decorating
111 Prepare and apply one coat of preservative (oil type) to
structural timber including touching up cut ends etc.After fixing. 0.00

112 Prepare surface of steel truss and apply two coats of


anticorrosive primer 0.00

113 Apply one coat of anti - corrosive primer two coats enamel
paint on already shop primed and erected steel roof truss. 0.00

114 Prepare and apply two coats primer and finishing coat of
enamel paint to mild steel (angle/ flat) 0.00

115 Painting steel on new work with two coats of anti - coropsive
paint. 0.00

116 Painting new timber work with two coats wood preservative 0.00

117 Preparing and painting wood work with primer and 2 coats
enamel paint 0.00

118 White or colour washing two coats in single storey 0.00

119 White or colour washing two coats in single storey 0.00

120 Prepare and apply one coat of alkali resistant premier and two
coats of emulsion paint to walls 0.00

121 Cement washing to walls of single storeyd building 2 coats 0.00

122 Painting walls with emulsion paint (2 coats) 0.00


123 Prepare and apply one coat of alkali resistant premier and two
coats of emulsion paint to soffit of slabs. 0.00

124 Varnishing two coats with copal varnishing after sandpapering 0.00

125 Wax polishing to timber in panels & floors 0.00

126 Plumbing (PVC)


1/2" diameter PVC pipes fixed to walls (specials paid
seperatyely) 0.00

127 3/4" diameter PVC pipes fixed to walls (specials paid


seperatyely) 0.00

128 1" diameter PVC pipes fixed to walls (specials paid seperatyely) 0.00

129 1 1/4" diameter PVC pipes fixed to walls (specials paid seperatyely)
0.00

130 1 1/2" diameter PVC pipes laid to walls (specials paid


seperatyely) 0.00

131 2" diameter PVC pipes laid to walls (specials paid


seperatyely) 0.00

132 3" diameter PVC pipes fixed to walls (specials paid


seperatyely) 0.00

133 Excavation for laying 1/2" to 3" diameter PVC pipes in ground
not less than 1" - 6" deep, back filling & compacting 0.00
134 Chasing brickwork for laying 1/2" to 1 12" diameter PVC
pipes and making good average depth 2" (Pipes & specials
paid seperately) 0.00

135 Chasing brickwork for laying 1/2" to 3" diameter PVC


pipes in ground or floor and making good. Average depth 3"
(Pipes & specials measured seperately) 0.00

136 1/2" elbows PVC specials viz - elbows / bends / sockets. -

137 3/4"dia PVC specials viz - elbows / bends / sockets. -

138 1" dia PVC specials viz - elbows / bends / sockets. -

139 1 1/4" dia PVC specials viz - elbows / bends / sockets. -

140 1 1/2" dia PVC specials viz - elbows / bends / sockets. -

141 2" dia PVC specials viz - elbows / bends / sockets. -

142 2 1/2" dia PVC specials viz - elbows / bends / sockets. -

143 3" dia PVC specials viz - elbows / bends / sockets. -

144 1/2" dia. PVC specials viz.Tees. -

145 3/4" dia. PVC specials viz.Tees. -

146 1" dia. PVC specials viz.Tees. -


147 1 1/4" dia. PVC specials viz.Tees. -

148 1 1/2" dia. PVC specials viz.Tees. -

149 2" dia. PVC specials viz.Tees. -

150 2 1/2" dia. PVC specials viz.Tees. -

151 3" dia. PVC specials viz.Tees. -

External drainage (EW pipes)


152 4" dia glazed earthanware pipes laid on 6" thick bedding in
cement concrete 1:3:6 (1 1/2") including excavation average
2'0" depth, backfilling with selected excavated materials and
concrete hauncing to joints. 0.00

Plumbing (C.I pipes)


153 4" dia C.I dia soil / vent pipe fixed vertically to wall jointed
with cement caulking (Specials measured seperately) 8.00

154 4" dia C.I dia pipe fixed to walls jointed with lead caulking
(Specials measured seperately) 0.00

Manholes & Gulleys


155 4" dia stoneware gulley with 6" *6" *6" gulley box including
excavation, 4" cement concrete 1:2:4 (3/4") base, surrounding
by 4 1/2" thick cement and sand 1:5 extended 6" above top of
gulley box including making connection 1/2" cement and sand
1:2 rendering internally and exposed faces finished smooth
with neat cement floating and providing C.I. grating on top
of gulley. -

156 Manhole 2'0" * 2'0" internally with invert depth not exceeding
2'0" including excavation, backfilling 6" cement concrete
1:2:4 (3/4") base with 3/8"dia meter mild steel rods at 4"
centres hothways, forming channels and benching in similar
concrete, 4 1/2'" walls in brick in cement 1:5, 1/2" thick
cement and sand 1:2 rendering internally and exposed surfaces
including channels, benching and 2" thick RCC removable
cover slab 2'3" * 2'3" inlet and outlet connection all complete
to working order. -

Sanitary fittings
157 22" * 16" glazed fire clay wash basin with 1/2" dia chromium
plated waste chain and stay, including fixing wash basin on
brackets.(Water supply and waste water connection measured
seperately) -

158 Sink 24" * 15" * 7" overall vitreous china with rubber plug &
chromium plated chain waste carried on iron brackets painted
and fixed to walls, (Water supply and waste water connection
measured seperately) -

159 Closet pedestal type with L/L flushing cistern, flush pipe
double plastic seat cover, 1/2" dia stop cock, trap supplied &
fixed complete to working order. -

160 Closet squatting type with trap including high level cistern fixed
complete with flush pipe and 1/2" dia stop cock, all complete
to working order. -

161 Vitreous china bidet suite fixed complete to working order. -

162 4 No. Rowl type urinal with trap and 2 gals capacity
autommatic flushing cistern & speaders compplete to working
orders -

Gutters & Downpipes


163 6" dia half round PVC eaves guter fixed to timber valance
board including gutter joiner and brackets fixed at 18' centres.
(Other specials paid seperately) 0.00
164 6" dia PVC gutter head -

165 6" dia PVC mitres -

166 6" dia PVC and caps -

167 3 1/2" dia PVC rain water down pipes fixed to brickwall with
wooden plugs buried in wall.(special measured seperately) 0.00

168 3 1/2" dia PVC elbow -

169 3 1/2" dia PVC shoe -


at

Width (ft) Height (ft) Other meas Quantity Unit


Main Menu

Description
0.00 Sqr

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube


0.00 0.00 - 0.00 cube

0.00 - - 0.00 Sqr.ft

Description

0.00 - - 0.00 Sqr

Description
0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 - - 0.00 Sqr

Description

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr


Description

Description

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube


0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 - - 0.00 Sqr

- - - 0.00 L.ft

- - - 0.00 L.ft
- - - 0.00 L.ft

- - - 0.00 L.ft

Description

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

Description

0.00 cwt

Description

0.00 0.00 - 0.00 cube

0.00 0.00 - 0.00 cube

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr


0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

- - - 0.00 L.ft

- - - 0.00 L.ft

- - - 0.00 L.ft

Description

0.00 - - 0.00 Sqr


0.00 - - 0.00 Sqr

Description

3.00 4.00 - 0.24 cube

0.00 - - 0.00 Sqr

Description

0.00 - - 0.00 Sqr

Description

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

Description

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr


0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

- - - 0.00 L.ft

- - - 0.00 L.ft

- - - 0.00 L.ft

Description

- - - 0.00 L.ft

- - - 0.00 L.ft

0.00 - - 0.00 Sqr

Description
0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

Description

0.00 - - 0.00 Sq.ft

0.00 - - 0.00 Sq.ft

0.00 - - 0.00 Sq.ft

0.00 - - 0.00 Sq.ft

0.00 - - 0.00 Sq.ft

0.00 - - 0.00 Sq.ft


Description

- - 0.00 0.00 Pairs

- - 0.00 0.00 Pairs

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

Description

0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.


0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.

0.00 - - 0.00 Sqr.

- - - 0.00 L.ft
Description

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr


0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

0.00 - - 0.00 Sqr

Description

- - - 0.00 L.ft

- - - 0.00 L.ft

- - - 0.00 L.ft

- - - 0.00 L.ft

- - - 0.00 L.ft

- - - 0.00 L.ft

- - - 0.00 L.ft

- - - 0.00 L.ft
- - - 0.00 L.ft

- - - 0.00 L.ft

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.


- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

Description

- - - 0.00 L.ft

Description

- - - 8.00 L.ft

- - - 0.00 L.ft

Description

- - 0.00 0.00 No.


- - 0.00 0.00 No.

Description

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

Description

- - - 0.00 L.ft
- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - 0.00 0.00 No.

- - - 0.00 L.ft

- - 0.00 0.00 No.

Description

- - 0.00 0.00 No.


MAIN MENU
Description

You might also like