You are on page 1of 2

Can you keep all requirements ?

Yes, we can keep all this requirement

Please fill out the feasibility studies enclosed, file 2.

Please find attached as you requested.

Regarding Are external processes planned?

Yes, we will outsource Tin Plating Process & Copper Strip Raw Material with ETP Grade

Regarding Is 100% inspection intended or already planned for special


characteristics in series

production? If yes, which ones? (Please attach)

Yes, we do 100% inspection of Goods by Visual Inspection, which is done by skilled Workers and
technically experienced staff.

Quote:

Can you please update the quote based on DAP Wehingen.

The Sea freight & Air Freight Charges changes every week, so we will provide you DAP prices at a
time of Bulk Order.

Please also offer 300 samples + sample report non Automotive (requirements file 4)

For the Samples of 300 Pcs. + File 4, Charges will be 700 EUR, out of 700 EUR, 500 EUR is
refundable at a time of first bulk order with a MOQ of 50000 Pcs.

Further questions:

What is your packaging concept ?

Regarding the Packing of This Part, it will be as below


250 Pcs. In 1 LD plastic Bag, this 1 LD plastic bag in 1 small box, there is total 12 Small box in 1
Carton, and if goods is going by Sea, this Cartons will be transfer to Wooden Pallet.

How long is the lead time:

 Production time

Depends on quantity, for suppose MOQ 50000 Pcs. Production lead time will be 50 Days.

 Lead time seafreight

Lead time for sea freight will be around 45-50 Days to reach to your country‘s port after dispatch
from our Factory.

You might also like