® P/N 112489K

January, 1994

G5, G6, DM, DMD


RCA, RCH, RFA, RFH & RMA

Fan Ventilation Kit Instruction

PARTS LIST
Item Quantity Description

8 Foot 12 Foot
1. 1 1 Fan Ventilation Assembly
2. 2 3 Fan Vent Covers
3. 14 18 8 x 1/2 Sheet Metal Screws

Whenever the condition of a store’s ambient air is above the design standard of these merchandisers
(75°F; 55% relative humidity) a problem of moisture condensing on the merchandiser’s exterior back
surfaces can occur. To eliminate this problem, air must be forced through the open area behind the
merchandiser to “wipe” the surface dry. This kit is designed for that purpose.

This kit is completely factory assembled and ready for installation. All that is required is to fasten it to the
top of the merchandiser, connect to an electrical power supply and close-off the open areas at the end of the
merchandiser or merchandiser lineup.
P/N 112489K 2

NOTES:
Be sure Merchandisers have been leveled
according to the installation instructions 1
under Leveling.
Before installing this kit, make certain that
there is A MINIMUM 4 INCH CLEARANCE
between the back of the merchandiser and 4 Inch
(102 mm)
the wall. Gap
If merchandisers have been installed back-
to-back in a line-up, make certain that there
is A 4 INCH CLEARANCE between the
merchandisers.

STEP 1. I F MERCHANDISER BACKS TO


WALL , PLACE
Fan Ventilation Assembly – 1
on top of the merchandiser
and covering the 4 inch gap Figure 1A
between the merchandiser and Merchandiser Against the Wall
the wall as shown in Figure 1a.
IF MERCHANDISERS ARE BACK -
TO - BACK , PLACE
1
Fan Ventilation Assembly – 1
on center between tops
bridging the 4 inch gap
between the merchandisers as 4 Inch
(102 mm)
shown in Figure 1b. Gap

Figure 1B
Merchandisers Back-to-Back
3 P/N 112489K

STEP 2. Remove
Fan Vent Covers – 2 2
3

Electrical Box

Note: Field connection to be


made in the left-hand end.

Serial Plate 3

4 in.
(102 mm)

Figure 2
Removing Vent Covers
STEP 3. Fasten the assembly to the
top of the merchandiser
through the bottom flange of
the end caps using
Sheet Metal Screws – 3

End Cap
End Cap

4 in.
(102 mm)
4 in.
3 (102 mm)
3

Figure 3A Figure 3B
Merchandiser Against the Wall Merchandisers Back-to-Back
P/N 112489K 4

STEP 4. Reinstall 120V NEUTRAL


Fan Vent Covers – 2
120V POWER
STEP 5. Connect the Fan Vent Fans
Assembly to a 120 volt power
supply (230 volt, 50Hz for
70HN and 71HN kits.
Figure 4A
NOTE: All wiring must be in 8 Ft M erchandisder
accordance with all applicable
electrical codes. 120V NEUTRAL

SERIAL PLATE AMPERAGES 120V POWER


Fans
A. 8 FOOT MERCHANDISER
120V 60Hz — 1.3
230V 50Hz — 0.7
B. 12 FOOT MERCHANDISER Figure 4B
120V 60Hz — 2.0 12 Ft M erchandisder
230V 50Hz — 1.0

STEP 6. Close off the open area at the


ends of the merchandiser or
merchandiser line-up from the
top of the case to the floor line.
Materials not provided.

Close
Off

Figure 5A Figure 5B
M erchandiser Against the Wall M erchandisers Back-to-Back
5 P/N 112489K

FAN BLADE AND MOTOR REPLACEMENT PARTS

Kit Nomenclature Description and Part Number

68HN and 96HN Fan Motor: P/N 0371980


41IT and 42IT GE #5KSM51ECG5097 or
43IT and 44IT Morrill SPGE9HBV16
62JJ and 63JJ 115V 9W CW

Fan Blade: P/N 0141073


Mor. #FV 800 CW 40P
Raised embossed side installed
away from motor.

72HN and 73HN Fan Motor: P/N 0371980


GE #5KSM51ECG5097 or
Morrill SPGE9HBV16
115V 9W CW

Fan Blade: P/N 0124150


Mor. #FV 800 CW 30S
Raised embossed side installed
away from motor.

70HN and 71HN Fan Motor: P/N 0371981


GE #5KSM51ECG5098 or
Morrill SPB9HCBV26
230V 50/60 Hz 9W CW

Fan Blade: P/N 0142752


Brookside #C202554
8 inch, 43 P
Raised embossed side installed
away from motor.