Professional Documents
Culture Documents
Shell Retail Permit To Work System 5.1 Ver
Shell Retail Permit To Work System 5.1 Ver
1 ver
Questionnaire & Qualifying T est for Permit Issuers and Permit Holders
1. FULL NAME *
Trivendram Imran
2. COMPANY NAME *
Yes
No
Nill
8. Outline your experience working in Fuel Retail, including working for Shell *
5 year
9. Are you competent in using a gas detector? Outline your experience or qualification (type
of detectors, calibrating, any formal qualifications) *
NO
ESR,AHA,HSE,SSR
All of t he above
(1 Point) *
Permit Issuer
All work
14. Who is responsible for enforcing compliance with the JHA and the Permit throughout the
work?
(1 Point) *
Permit Issuer
Permit Holder
FMC/PMC Engineer
15. The Permit Holder must suspend the work if the following changes occur:
(1 Point) *
T here is conflict ing work being undert aken by anot her PH or cont ractor
1 working day
3 working days
All works
18. Work requiring a Permit may continue if the Permit Holder leaves the site for less than 1
hour. (1 Point) *
True
False
19. It is not necessary for the PI to remain on site for the duration of the work as the Permit
Holder is responsible for verifying that the precautions are maintained throughout the work
(1 Point) *
False
True
20. The contractor must discuss the Work Clearance Form with the Site Representative prior
to starting any work. (1 Point) *
True
False
21. The Permit Holder is responsible for explaining to the work crew the details of the work
and any potential hazards and controls. (1 Point) *
False
True
22. The Permit Holder is responsible for signing off on the Permit once the work is complete
and confirming the work area has been left in a clean and safe condition (1 Point) *
True
False
True
False
24. High risk work can be performed without issuing a Permit provided a Permit Holder is on
site. (1 Point)
True
False
25. The Site Representative advises the Contractor if there are any site conditions that may
impact the Contractor safely performing the work (e.g. product delivery) (1 Point)
True
False
26. The following documents are required for the scenario: JHA + WCF for risk activity
_ _ _ _ _ _ _ _ _ _ _ _ _ (1 Point) *
Medium risk
27. The PTW system consists of 3 primary documents. These documents are the
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ , and _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ * (3 Points) *
PT W,JHA,WCF
28. A JHA always consists of job steps, job step _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ and job step
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . * (2 Points) *
Element
30. The following documents are required for the scenario: Permit + JHA + WCF for
_ _ _ _ _ _ _ _ _ _ _ _ _ risk activity. (1 Point) *
31. The _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ is responsible for being present personally at the work site at
all times during the Permit controlled work. (1 Point) *
Permit holder
T his content is created by the owner of the form. T he data you submit will be sent to the form owner. Microsoft is not responsible
for the privacy or security practices of its customers, including those of this form owner. Never give out your password.