Professional Documents
Culture Documents
Sheet 1 of 1
EDOTCO GROUP
Type of Work :
Detail Checklist
2.0 Piling
2.1 Is the winch and relevant equipment inspected, safe & in good condition?
2.2 Is the winch operator trained?
2.3 Is there have safe accessed to climb top for tripod for set up and worn full body harness?
2.4 Is the wire secure properly with piling equipment?
2.5 Is there any one under suspended load?
2.6 Is the winch moving part guard properly?
5.3 Is the elecrical system switch off (LOTO) while perfomring work ?