FDH JV Document Number: P6022MAB.000.51S.067
Table of Contents
PURPOSE ..................................................................................................................................................... 3
SCOPE .......................................................................................................................................................... 3
APPLICATION .............................................................................................................................................. 3
DEFINITIONS ............................................................................................................................................... 3
1.0 GENERAL REQUIREMENTS ............................................................................................................. 4
1.1 Design........................................................................................................................................ 4
1.2 Competent Person ..................................................................................................................... 4
1.3 Inclement Weather .................................................................................................................... 4
2.0 SCAFFOLD ERECTION ..................................................................................................................... 4
2.1 Falling Object Protections.......................................................................................................... 8
3.0 SCAFFOLD INSPECTION .................................................................................................................. 9
4.0 SCAFFOLD USE ................................................................................................................................ 9
5.0 TRAINING ......................................................................................................................................... 11
5.1 Erectors ................................................................................................................................... 11
5.2 Users ....................................................................................................................................... 11
5.3 Inspectors ................................................................................................................................ 12
6.0 REQUIREMENTS FOR SPECIFIC TYPES OF SCAFFOLDS ......................................................... 12
6.1 Suspension Scaffolds .............................................................................................................. 12
6.2 Other Types of Scaffolds ......................................................................................................... 14
7.0 GIN WHEELS/SAFETY PULLEYS ................................................................................................... 15
7.1 General .................................................................................................................................... 15
7.2 Setting Up ................................................................................................................................ 16
7.3 Using the Rope and Wheel...................................................................................................... 17
7.4 Safety Pulley ............................................................................................................................ 18
8.0 RESOURCES .................................................................................................................................... 19
9.0 REFERENCES .................................................................................................................................. 19
10.0 ATTACHMENTS ............................................................................................................................... 19
PURPOSE
This procedure establishes the requirements for design, erection, inspection, and
use of scaffolds including training requirements.
SCOPE
General Requirements
Scaffold Inspection
Scaffold Erection
Scaffold Use
Training
Requirements for Specific Types of Scaffolds
Gin Wheels/Safety Pulleys
APPLICATION
This procedure applies to work activities and employees under the control of
FDH JV and its contractors.
DEFINITIONS
Guardrail A barrier secured to uprights and erected along the exposed sides
and ends of platforms to prevent falls.
Scaffolding includes tube and couplers, modular frames, drop staging, swing stages, purpose
design stages all with full decking, guardrails, and fender boards.
Scaffolding in light, medium, and heavy-duty applications must conform, be constructed and be
maintained in accordance with KNPC Document SHE-TSSA-06-2015, Scaffolds and Ladders
Safe Work Practices
1.1 Design
Qualified Persons will plan, design, or modify scaffold systems. Special job needs
(configuration, location of access, material handling) will be communicated to the
Qualified Person preparing design specifications for a scaffold system.
The FDH JV Site Manager will determine if it is safe to work on or from scaffolds during
storms or high winds. If authorization is given to perform such work, additional safety
precautions must be used, including a personal fall arrest system (PFAS) or previously
installed windscreens.
Scaffolds will be constructed, modified, and altered only with knowledge of the maximum
intended load and in accordance with the design criteria and the manufacturer’s
recommendations. Refer to Form HSEF0308, Scaffold Checklist – Erection for scaffold erection
criteria.
Scaffolds will be constructed so that the structure and its components are capable of supporting,
without failure, their own weight and at least 4 times the maximum intended load.
Scaffold components and materials must be inspected before use, ensuring that wood scaffold
planks (when used) are scaffold-grade lumber or the equivalent, as recognized by approved
grading rules for the species of wood used.
The following table may be used as information for minimum and maximum permissible spans for
2 inches by 10 inches (5.1 centimeters by 25.4 centimeters) or wider wood planks:
Table 1 – Material
Note: Fabricated planks and platforms may be used in lieu of solid sawn wood planks.
Maximum spans for such units are according to manufacturer’s recommendations for the
intended use/load.
The clearance between scaffolds and power lines will be in accordance with Procedure
P6022MAB.000.51S.060, Working Near Overhead Power Lines; that is, no part of any scaffold
can be closer than the “working distance” in Procedure P6022MAB.000.51S.060.
When scaffold platforms are more than 2 feet (0.6 meter) above or below a point of access,
portable ladders, hook-on ladders, attachable ladders, stair towers, ramps, walkways, integral
prefabricated scaffold access, or direct access from another scaffold, structure, personnel hoist,
or similar surface must be used.
Gates, or other methods approved by the manufacturer or Competent Person, will be used to
provide a safe transition from the access point to the scaffold platform and to maintain the
integrity of the scaffold’s guardrail system.
The scaffold must be plumb and level; supported scaffold poles, legs, posts, frames, and uprights
will bear on base plates and mud sills or base plates and other adequate foundation such as
concrete slab flooring.
Where leveling of a scaffold is necessary, screw jacks or other equivalent stable means will be
used.
When erecting or dismantling scaffolds, safety harnesses and lanyards must be used at the 6-foot
(1.8-meter) working level whenever feasible, if performing work at a stationary location for a
period of time, and where components will be used for tie-off are deemed strong and stable
enough to allow their use.
Scaffolds must be placed as close to the work as possible. If fall protection is provided by the
structure on which the work is being performed (such as a building or wall), no more than
14 inches (35.6 centimeters) will be allowed between the scaffold platform and the structure.
Each platform on all working levels of scaffolds will be fully planked or decked between the front
uprights and the guardrail supports.
Each platform unit will be installed so that the space between adjacent units and the space
between the platform and the uprights is no more than 1 inch wide (2.5 centimeters) except
where it can be demonstrated that a wider space is necessary.
Each platform must be secured. The platform ends must be extended 6 inches to 12 inches
(15.2 centimeters to 30.5 centimeters) past the centerline of their supports unless restrained by
hooks, cleats, or other means.
At all points of a scaffold where the platform changes direction, any platform that rests on a
bearer at an angle other than a right angle will be laid first, and platforms that rest at right angles
over the same bearer will be laid second.
Where a scaffold’s height exceeds 4 times its smallest base dimension, guy, tie, or otherwise
brace the scaffold at the closest horizontal member to the 4:1 height. Repeat every 26 feet
(7.9 meters) vertically (20 feet [6.1 meters] for those scaffolds less than or equal to 3 feet
[0.9 meter] in width) and 30 feet (9.1 meters) horizontally.
Protection will be installed (such as toe boards, netting, or fencing) where employees located on
or below a scaffold are exposed to the possibility of objects falling from overhead.
Access:
Portable, hook-on, and attachable ladders are positioned so as not to tip the scaffold.
Hook-on and attachable ladders are positioned so that their bottom rung is not more than
24 inches (61 centimeters) above the scaffold supporting level.
When hook-on and attachable ladders are used on a supported scaffold more than 35 feet
(10.7 meters) high, they have rest platforms at 35 feet (10.7 meters) maximum vertical
intervals.
Hook-on and attachable ladders are specifically designed for use with the type of scaffold
used.
Hook-on and attachable ladders have a minimum rung length of 11-1/2 inches
(29.2 centimeters).
Hook-on and attachable ladders have uniformly spaced rungs with a maximum spacing
between rungs of 16-3/4 inches (42.6 centimeters).
Stairway-type ladders:
Are positioned such that their bottom step is not more than 24 inches (61 centimeters) above
the scaffold supporting level.
Are provided with rest platforms at 12-foot (3.7-meter) maximum vertical intervals.
Have a minimum step width of 16 inches (40.6 centimeters) except that mobile scaffolds
stairway-type ladders have a minimum step width of 11-1/2 inches (29.2 centimeters).
Stair towers are positioned such that their bottom step is not more than 24 inches
(61 centimeters) above the scaffold supporting level.
A stair rail consisting of a toprail and a midrail is provided on each side of each scaffold
stairway.
The toprail of each stair-rail system is capable of serving as a handrail, unless a separate
handrail is provided.
Handrails and toprails that serve as handrails will provide an adequate handhold for
employees grasping them to avoid falling.
Stair-rail systems and handrails will be surfaced to prevent injury to employees from
punctures or lacerations and to prevent snagging of clothing.
The ends of stair-rail systems and handrails are constructed so that they do not constitute a
projection hazard.
Handrails and toprails that are used as handrails are at least 3 inches (7.6 centimeters) from
other objects.
Stair rails will not be less than 28 inches (71.1 centimeters) nor more than 37 inches
(94 centimeters) from the upper surface of the stair rail to the surface of the tread, in line with
the face of the riser at the forward edge of the tread.
Each scaffold stairway is at least 18 inches (45.7 centimeters) between stair rails.
Guardrails meeting requirements are provided on the open sides and ends of each landing.
Riser heights are uniform, within 1/4 inch (0.6 centimeters) for each flight of stairs.
Tread depth is uniform, within 1/4 inch (0.6 centimeters for each flight of stairs.
Ramps and walkways 6 feet (1.8 meters) or more above lower levels must have guardrail
systems.
If the slope of a ramp or a walkway is steeper than 8 horizontal to 1 vertical (8:1), the ramp
or walkway will have cleats not more than 14 inches (35.6 centimeters) apart that are
securely fastened to the planks to provide footing.
Steps and rungs of ladder and stairway-type access will line up vertically with each other between
rest platforms.
Direct access to or from another surface will be used only when the scaffold is not more than
1 inch (2.5 centimeters) horizontally and not more than 24 inches (61 centimeters) vertically from
the other surface.
Access for employees erecting and dismantling supported scaffolds must be in accordance with
the following:
Provide a safe means of access for each employee erecting or dismantling a scaffold where
the provision of safe access is feasible and does not create a greater hazard. Have a
Competent Person determine whether it is feasible or would pose a greater hazard to
provide, and have employees use a safe means of access. This determination will be based
on project/site conditions and the type of scaffold being erected or dismantled.
Hook-on or attachable ladders are installed as soon as scaffold erection has progressed to a
point that permits safe installation and use.
When erecting or dismantling tubular welded frame scaffolds, end frames with horizontal
members that are parallel, level, and not more than 22 inches (55.9 centimeters) apart
vertically, may be used as climbing devices, provided they are erected in a manner that
creates a usable ladder and provides good handhold and foot space.
Scaffold areas will be marked or posted with warning flags or barriers where vehicular traffic is
present.
A completed scaffold status tag will be attached near the access point of any scaffold being used,
erected, or dismantled, as follows:
Red Tag (Form HSEF0304) – KEEP OFF/DO NOT USE – prohibits use of the scaffold, as
the unit is undergoing some stage of erection, alteration, or dismantling.
The scaffold must be dismantled shortly after being notified that the work requiring the scaffold is
complete.
In addition to wearing hard hats, each employee on a scaffold will be provided with
additional protection from falling hand tools, debris, and other small objects through the
installation of toeboards, screens, or guardrail systems, or through the erection of debris
nets, catch platforms, or canopy structures that contain or deflect the falling objects.
Where there is danger of tools, material, or equipment falling from a scaffold and striking
employees below, the following provisions apply:
P6022MAB.000.51S.067 - Scaffolds.docx Page 8 of 19
KNPC CFP - MAB2 Project
FDH JV Site HSE Manual
Scaffolds
Revision No.: O1, 15-Jan-15
The area below the scaffold where objects can fall will be barricaded, and
employees will not be permitted to enter the hazard area.
A toeboard will be erected along the edge of the platforms more than 6 feet
(1.8 meters) above lower levels for a distance sufficient to protect employees below.
Where tools, materials, or equipment are piled to a height higher than the top edge
of the toeboard, paneling, or screening extending from the toeboard or platform to
the top of the guardrail will be erected for a distance sufficient to protect employees
below.
Canopies, when used for falling object protection, will comply with the following criteria:
Canopies will be installed between the falling object hazard and the employees.
When canopies are used on suspension scaffolds for falling object protection, the
scaffold will be equipped with additional independent support lines equal in number
to the number of points supported and equivalent in strength to the strength of the
suspension ropes.
Independent support lines and suspension ropes will not be attached to the same
points of anchorage.
At least 3-1/2 inches (8.9 centimeters) high from the top edge of the toeboard to the
level of the walking/working surface. Toeboards will be securely fastened in place at
the outermost edge of the platform and have no more than 1/4-inch
(0.6 centimeters) clearance above the walking/working surface. Toeboards will be
solid or with openings not over 1 inch (2.5 centimeters) in the greatest dimension.
The Competent Person will inspect scaffolds (and their components, including gin wheels/safety
pulleys) to be used before the start of each work shift, and after any event that could affect the
structural integrity of the equipment. Results of inspections must be documented on Form
HSEF0303, Scaffold Inspection Tag (or equal); the tag will remain affixed to the scaffold.
Note: Refer to Attachment 01, Scaffold Checklist – User, for scaffold use criteria.
Ladders, unstable objects, or makeshift devices will not be used to increase the working height of
scaffolds.
Exception: Ladders may be used on large area scaffolds when certain criteria are met and
only with written approval from the Competent Person.
Mobile scaffolds will be used on firm, level surfaces. Lock the casters or wheels before using. To
move, apply force as close to the base as practical, but not more than 5 feet (1.5 meters) above
the supporting surface.
Employees will not “ride” on a scaffold while it is being moved; remove or secure tools/materials
on the platform.
Only approved access means will be used to ascend and descend scaffolds (stairs, attached
ladder, or specially designed end frame); do not use crossbracing or siderails.
Note: Scaffold framing may be used for access only if its horizontal members have been
specifically designed and constructed for such use.
Only tools and materials necessary to perform the task will be kept on the scaffold platform.
Slipping or tripping hazards will be controlled by removing or securing the tools/materials.
Scaffolds and scaffold components will not be loaded in excess of their maximum intended loads
or rated capacities, whichever is less.
Fall arrest (PFAS) must be used wherever feasible when working 6 feet (1.8 meters) or more
above a lower level; this requirement is in addition to the requirement for guardrails.
Work can be conducted only from scaffolds having a completed yellow or green scaffold status
tag and a current scaffold inspection tag affixed. Special conditions/additional controls noted on
the tag(s) must be complied with.
A scaffold system/component or scaffold status tag must not be modified or removed. Notify
supervision immediately if a scaffold is damaged, weakened, or otherwise deficient.
Employees will not position themselves or use tools/equipment where there is a possibility of
contact with energized overhead electrical lines. When scheduled to work within 20 feet
(6.1 meters) of the centerline of the nearest conductor, contact the electric utilities organization
having jurisdiction 48 hours in advance. They will specify requirements and clearance distances
for the work activity.
Makeshift work platforms such as, but not limited to, boxes and barrels, will not be used on top of
scaffold platforms to increase the work height level of employees.
Ladders must not be used on scaffolds to increase the working level height of employees, except
on large area scaffolds where employees have satisfied the following criteria:
When the ladder is placed against a structure that is not part of the scaffold, the scaffold is
secured against the sideways thrust exerted by the ladder.
The platform units are secured to the scaffold to prevent their movement.
The ladder legs are be on the same platform, or other means will be provided to stabilize the
ladder against unequal platform deflection.
The ladder legs are secured to prevent them from slipping or being pushed off the platform.
The platform will not deflect more than 1/60 of the span when loaded.
Any part of a scaffold damaged or weakened so that its strength is less than that required by this
procedure must be immediately repaired or replaced, braced to meet those provisions, or
removed from service until repaired.
5.0 TRAINING
A Competent Person will provide training on erection, maintenance, inspection, use, and
dismantling of scaffolds as outlined below. Training must be documented.
5.1 Erectors
5.2 Users
Scaffold users will be trained in hazard recognition and control measures associated with
the type of scaffold being used, including the following:
The nature of electrical, fall, and falling object hazards and the correct procedures
for dealing with these hazards
Use of fall protection and fall protection systems (erecting, maintaining, and
disassembling)
Employees who erect, dismantle, or use scaffolds will be retrained when necessary to
ensure their proficiency or provide updated information on hazards or changes.
P6022MAB.000.51S.067 - Scaffolds.docx Page 11 of 19
KNPC CFP - MAB2 Project
FDH JV Site HSE Manual
Scaffolds
Revision No.: O1, 15-Jan-15
5.3 Inspectors
All suspension scaffold support devices, such as outrigger beams, cornice hooks,
parapet clamps, and similar devices, will rest on surfaces capable of supporting at least
4 times the load imposed on them by the scaffold operating at the rated load of the hoist.
Suspension scaffold outrigger beams, when used, will be made of structural metal or
equivalent strength materials and will be restrained to prevent movement.
The stall load of scaffold hoists will not exceed 3 times its rated load.
Inboard ends of suspension scaffold outrigger beams will be stabilized by bolts or other
direct connections to the floor or roof deck; or they will have their inboard ends stabilized
by counterweights, except for masons' multi-point, adjustable, suspension scaffold
outrigger beams, which will be stabilized by counterweights.
Securely fastened together with the flanges turned out when channel iron beams are
used in place of I-beams.
When an outrigger beam is used, the shackle or clevis with which the rope is
attached to the outrigger beam will be placed directly over the centerline of the
stirrup.
Suspension scaffolds support devices such as cornice hooks, roof hooks, roof irons,
parapet clamps, or similar devices will be:
Secured against movement by tiebacks installed at right angles to the face of the
building or structure, or opposing angle tiebacks will be installed and secured to a
structurally sound point of anchorage on the building or structure.
When winding drum hoists are used on a suspension scaffold, they will contain no
less than 4 wraps of the suspension rope at the lowest point of scaffold travel.
Wire suspension ropes will not be joined together except through the use of eye
splice thimbles connected with shackles or coverplates and bolts.
The load end of wire suspension ropes will be equipped with proper size thimbles
and secured by eye splicing or equivalent means.
Ropes will be inspected for defects by a Competent Person before each work shift
and after every occurrence, which could affect a rope’s integrity.
Swaged attachments or spliced eyes on wire suspension ropes will not be used
unless they are made by the wire rope manufacturer or Qualified Person.
There will be a minimum of 3 wire rope clips installed, with the clips a minimum of
6 rope diameters apart.
When U-bolt clips are used, the U-bolt will be placed over the dead end of the rope;
and the saddle will be placed over the live end of the rope.
Suspension scaffold power-operated hoists and manual hoists will be tested and listed by
a qualified testing laboratory.
In addition to the normal operating brake, suspension scaffold power-operated hoists and
manually operated hoists will have a braking device or locking pawl that engages
automatically when a hoist makes either of the following uncontrolled movements: an
instantaneous change in momentum or an accelerated over speed.
Suspension ropes will be shielded from heat-producing processes. When acids or other
corrosive substances are used on a scaffold, the ropes will be shielded, treated to protect
against the corrosive substances, or be of a material that will not be damaged by the
substance being used.
To reduce the possibility of welding current arcing through the suspension wire ropes
when performing welding from suspension scaffolds, the following precautions will be
taken, as applicable:
An insulated thimble is used to attach each suspension wire rope to its hanging
support. Excess suspension wire rope and any additional independent lines are
insulated.
The suspension wire rope is covered with insulating material extending at least
4 feet (1.2 meters) above the hoist.
If the scaffold grounding lead will be disconnected at any time, the welding operation
is discontinued.
An active welding rod or uninsulated welding lead must not be allowed to contact the
scaffold or its suspension system.
Devices whose sole function is to provide emergency escape and rescue will not be used
as working platforms.
Types of scaffolds that may be used on a project/site, but not specifically addressed by
this procedure include:
Pole scaffolds
Tube and coupler scaffolds
Fabricated frame scaffolds
Plasterers', decorators', and large area scaffolds
Bricklayers' square scaffolds
Horse scaffolds
Form scaffolds and carpenters' bracket scaffolds
Roof bracket scaffolds
Outrigger scaffolds
Pump jack scaffolds
The following are typical instructions/requirements — but always install and operate according to
the manufacturer’s recommendations.
7.1 General
Use this type of equipment only on structures that are able to bear its weight and its
load.
Only use a gin wheel and rope if you have been properly trained to do so.
Only persons trained in scaffold erection will install/erect a gin wheel/safety pulley.
Note: A gin wheel/safety pulley must be inspected daily/each shift before use. If
the wheel/pulley is part of a scaffold, the inspection must be performed by a
Competent Person.
Make sure the landing area is unobstructed and able to accept the load in size and
weight.
Check the condition of the equipment before use. If it shows signs of damage or
excessive wear, tag it out using a Danger – Don’t Use It – Unsafe Tag
(Form HSEF0301).
Have safe working load (SWL) (for example, 110 pounds [50 kilograms]) marked on
the wheel.
Run freely and true, with no visible signs of corrosion, excessive wear, deformity, or
contamination from oil, paints, concrete, etc.
Have edges that are free from any sharp edges that could damage the rope.
Not be crimped, which will prevent the rope from running smoothly.
Have 2 split pins in place, unbroken, and not corroded (bent over nails is not an
acceptable alternative).
Have a center pin that does not show any signs of excessive wear.
Never push the equipment beyond its design limits. If it will not do what you want
with reasonable ease and speed, assume you have the wrong tool for the job.
When not in use, store the equipment somewhere clean, dry, and safe.
7.2 Setting Up
Double check that the equipment has a sufficient SWL for the item being lifted.
Make sure that you only use a suitable rope of either 0.71 or 0.79 inches (18 or
20 millimeters), which is also long enough for the required drop.
Check and confirm that the suspension/anchorage point is tested and certified to the
equivalent (or preferably greater) SWL of the wheel/pulley — allow a 10 percent
safety margin to accommodate dynamic forces that may arise during the course of a
lift.
Carefully select a safe area where coworkers and members of the public are not a
risk and barrier off a working zone on the ground/floor below the wheel.
Fix a gin wheel horizontal supporting tube with double couplers to 2 standards.
Use a sleeve coupler where a joint occurs on the inside standard between the
supporting tube and the working platform.
Suspend a gin wheel from its supporting tube no more than 2 feet (0.6 meter) from
the scaffold.
Ensure a load-bearing fitting is used on each side of the gin wheel on the horizontal
support tube.
Remove any obstructions (such as transoms) from the rope’s route of travel.
Use either a suitable shackle or slide the loop on the wheel’s bracket over a scaffold
pole and retain in place using a scaffold clip on either side.
Once secured, feed the rope over the wheel and continue until the rope reaches the
ground or the areas where the load is to be lifted from or lowered to.
Ensure that the load is balanced, stable, and that personnel stand clear of the raised
load.
Make sure that anyone in the immediate work area is warned of what you are doing.
Never stand directly under the load; keep others clear and concentrate at all times.
In addition to standard PPE, gloves appropriate for this work must be worn.
When lowering materials over the side, the top man must ensure that the person
below is holding the rope securely and is ready to receive the load.
If the item to be raised has a dedicated lifting eye, ensure that it is in good condition
before you attach the hook.
Make sure the load is properly secured; use the rolling hitch knot for tubes and the
timber hitch knot for boards.
Before lifting, ensure the load is free and not restrained by fixings, etc.
Lift the load a nominal distance to check balance and security of the load.
Assess the weight and shape of the system components before deciding on the
number of items to be attached at anyone time.
When raising/lowering more than 1 tube or board, use and additional half-hitch knot
to improve the grip on the load. The maximum amount of material to be lifted or
lowered:
Only lifting bags or baskets of sufficient size, strength, etc., are to be used for raising
fittings.
Once raised, lower as soon as possible. Do not leave the load suspended or
unattended for any reason.
Gently lower the load and then remove it from the rope.
Remove the rope from the wheel/pulley and remove from its mounting position.
The following are typical instructions/requirements — but always install and operate
according to the manufacturer’s recommendations:
An auto-braking unit is supplied with its own mounting tube that should be attached
to the scaffold using standard scaffold clips.
Before attaching the tube, ensure that the end fitted with a stop collar and spring pin
are outermost.
Feed the rope through the unit — start by feeding the rope between the rear spacer
and roller.
Next feed the rope between the main roller and the brake; if you find that the brake
gets in the way, press down on the brake rocker to hold it clear.
Finally, feed the rope so that it is between the main roller and counterweight.
Raise the unit and slide its rotating sleeve onto the mounting tube, ensuring it is
pushed beyond the spring pin.
You can now pull enough rope through the pulley to allow the rope to reach the
ground or the area where the load is to be lifted from or lowered to.
The safety pulley has a braking system that will grip the rope if you loose control. It
will only work if the counterweight is set correctly and the SWL is not exceeded.
The last adjustment to make is to the balancing counterweight. This should be set in
position according to the length of drop of the load side of the rope.
To adjust its position, insert the pin spanner into the end of the counterweight.
Loosen the counterweight by about 8 turns (counterclockwise) move the
counterweight to the required position and relock.
8.0 RESOURCES
9.0 REFERENCES
10.0 ATTACHMENTS
Work from tagged scaffolds only. Comply with special conditions or the additional controls
noted on the access tag. Do not modify or remove a scaffold system, component, or status tag.
Notify supervision immediately if a scaffold is damaged, weakened, or otherwise deficient.
Before it is used
On each work shift
Do not use unstable objects or makeshift devices to increase the working height of the
scaffolds. Use portable ladders to increase the working height only after a Competent Person
has determined that the stability of the structure has not been compromised and adequate fall
protection is in place.
Use mobile scaffolds only on firm, level surfaces. Lock the casters or wheels before using
mobile scaffolds.
Use designated access means to descend or ascend a scaffold (stairs, attached ladder, or
specially designed end frames). Do not climb crossbracing or side rails for access.
Keep only the tools and materials necessary to perform the task on the platform. Control
slipping and tripping hazards by removing or securing tools or materials.
Use fall protection systems (guardrail systems or personal fall arrest systems) when working
6 feet (1.8 meters) or more above a lower level.
Do not position yourself, or use tools or equipment where there is a possibility of contacting an
energized overhead line. Contact the electrical utilities organization having jurisdiction for
additional requirements if any portion of your body, the tools, or the materials may come within
20 feet (6.1 meters) of the energized line.
1. Attachment Ring
- Free of bends and twists.
- There will be 360-degree free movement.
- SWL-stamped.
- Split pin fitted.
2. Rope Retaining Guide
- Is free of bends and damage.
- Brick is color-coded.
- Split pin fitted.
3. Rope Housing
- Is free of bends and twists and suitable to house a 0.71-inch (18-millimeters) rope.
- There will be 360-degree movement.
- Bush and center hole are in good order.
- Split pin/washers are in good order.
- Center shaft is free of bends, wear, and tear.
4. Before Use Checks
- The wheel must have an identification number.
- The safe working load (SWL) (for example, 110 pounds [50 kilograms]) must be
marked on the wheel.
- The wheel will run freely and true, with no visible signs of corrosion, excessive wear,
deformity, or contamination from oil, paints, concrete, etc.
- The edge of the wheel must be free from any sharp edges that could damage the rope.
- The wheel must not be crimped, which will prevent the rope from running smoothly.
- The 2 split pins must be in place, unbroken, and not corroded (bent over nails are not
an acceptable alternative).
- The center pin must not show any signs of excessive wear.
- The supporting ring/hook must not be cracked, damaged, or deformed.
- The rope will have a means of identification (ID tag with SWL).
- The rope must be in sound condition and is not cut, frayed, worn, or damaged.
- The rope must not be kinked or contaminated by oil, paints, etc.
- The rope core must be firm and consistent along the rope length.
- The ends of the rope will be properly spliced.