Professional Documents
Culture Documents
PROJECT
NAME:
PROPOSED
03
-
STORIED
(WITH
4-
STORIED
FOUNDATION)
ZILA
MODEL
MASJID ISLAMIC FOUNDATION BANGLADESH
AND LEGEND
1. Sink :
Establishing 560 Model Mosque And
Islamic Cultural center project
PROJECT NAME
ISLAMIC 2. Basin :
PROPOSED 03 - STORIED
(WITH 4- STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
BANGLADESH.
CULTURAL
CONSULTANT
3. Long Pan :
4. Commod :
PLUMBING DESIGNER
AT
NOTE
7. 2" Vent Pipe : THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
( for Basin ww ) (IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.
PLAIN
COPYRIGHT
10. Water Supply Pipe Layout : WITH APPROPRIATE PROFESSIONAL FEE TO THE
ENGINEER.
01
02
03
DRAWING TITLE
DATE
.................. 2020 04
05
06
NO. DATE
DATE :- FOR
NOVEMBER - 2020 SCALE - AS SHOWN
13. 4"Ø Waste Water Stack :
FOUNDATION
BANGLADESH.
TYPE - B
EAST ENTRY
T1
Rain
Water
Soil Pipe
WWP
SOIL & WASTE WATER PIPE LAYOUT
TOILET
Co
4'-0" hight wall
TOILET
SHOWER
MALE ABLUTION
3'-0" hight wall
½"Ø
TOILET
WATER SUPPLY PIPE LAYOUT
1"Ø
1½"Ø
¾"Ø
TOILET SHOWER
¾"Ø
¾"Ø
MALE ABLUTION
3'-0" hight wall
¾"Ø
1"ØDrop
ISLAMIC FOUNDATION BANGLADESH
PROJECT NAME
PROPOSED 03 - STORIED
(WITH 4- STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
BANGLADESH.
CONSULTANT
PLUMBING DESIGNER
1¼ "Ø ¾"Ø
1¼"Ø Concealed
¾"Ø NOTE
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
COPYRIGHT
REVISION
NO. DATE NO. DATE
01 .................. 2020 04
03 06
T2 KITCHEN KITCHEN
½"Ø
DRAWING TITLE
PROJECT NAME
Rain Water
Soil Pipe
Water
Rain
WWP
Water
WWP
Rain
WASH
T1
1'-0"
1'-7"
CONSULTANT
VOID (OPEN TO SKY)
PROJECT NAME
PLUMBING DESIGNER
SL. NO. SOIL & WASTE WATER PIPE LAYOUT WATER SUPPLY PIPE LAYOUT PROPOSED 03 - STORIED
(WITH 4- STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
RAIN WATER BANGLADESH.
1¼"Ø
1¼ "Ø Concealed MALE
MALE TOILET ABLUTION
T3 PLUMBING DESIGNER
PUBLIC (MUSULLI)
ABLUTION
NOTE TOILET
Car Parking NCF
Underground
Wheel car
ENTRY FOR
PUMP ROOM
stoper
COPYRIGHT
WAITING COPYRIGHT DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF
SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
TOILET FOR
TOILET FOR
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
DISABLE
DISABLE
DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF
PERSON
PERSON
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WITH APPROPRIATE PROFESSIONAL FEE TO THE
14'-0" WIDE DRIVE WAY
Mortuary
Mortuary
Washing
Washing
NO. DATE NO. DATE
Soil Pipe
TOILET FOR
GREEN
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
T4 01 .................. 2020 04
bed
bed
DISABLE
T3 ¾"Ø
PERSON
ENGINEER.
MALE
DISABLE PERSON DRAWING TITLE
Washing
Mortuary
ABLUTION
T4
bed
REVISION
Rain Water
DEAD BODY WASHING Room DEAD BODY WASHING Room Details of Soil,
Soil Pipe
1"Ø
¾"Ø
DEAD BODY WASHING Room GREEN 01 .................. 2020 04 Under ground
CAD DESIGNED BY
02 05
¾"Ø
03 06
1"Ø
GUARD
WWP
Soil Pipe
RAMP SLOPE 1:12 1¼ "Ø WATER SUPPLY PIPE 1"Ø ¾"Ø DRAWING TITLE DATE NOV.-2020 SHEET NO. P-8
OFFICE STAFF
ENTRY FOR
Soil Pipe
WWP
WWP
TOILET MARKING
& FIXTURE LAY OUT
GROUND FLOOR
N CAD DESIGNED BY
W E GROUND FLOOR PLAN
S MOHAMMAD ABDUR RAHIM
INDIVIDUAL TOILET DETAIL
ISLAMIC FOUNDATION BANGLADESH
( FIXTURES AND FITTINGS , SOIL , WASTE WATER & WATER SUPPLY PIPE )
Establishing 560 Model Mosque And
Islamic Cultural center project
½"Ø CONSULTANT
½"ØDrop
1¼"Ø Concealed
T5 TOILET TOILET
Toilet for
PLUMBING DESIGNER
Toilet for
½ "Ø Dsable Person
TOILET Dsable Person TOILET 1"Ø Run Over False Slab ENGR. MD. NAZIBAR RAHMAN
½ "ØDrop ¾"Ø Run
D2
NOTE
½ "Ø ½"ØDrop ½"Ø
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
1"ØDrop
¾"Ø ¾"Ø COPYRIGHT
MALE ABLUTION
ENGINEER.
MALE ABLUTION
¾"Ø
1"Ø Run Over False Slab
REVISION
1½"Ø Run NO. DATE NO. DATE
T6 D1 1¼"Ø Run
1"ØDrop
01
02
.................. 2020 04
05
TOILET TOILET 03 06
TOILET
TOILET ¾"Ø
DRAWING TITLE
Details of Soil,
½"Ø
¾"ØDrop Waste & Rain Water
Pipe Connection
CAD DESIGNED BY
PROJECT NAME
5"w-4'h 5"w-4'h
SHOWER
4'-3"x4'-6"
STAIR
PROJECT NAME
Accounts CONSULTANT
(WITH 4- STORIED FOUNDATION)
8"
STAIR
CONSULTANT
Electrical
Duct
½"ØDrop
T7
3
1'-716" TOILET TOILET
10"
PLUMBING DESIGNER ¾"Ø
PLUMBING DESIGNER
TOILET FOR DISABLE
TOILET FOR
DISABLE
½ "Ø PERSON
¾"ØØDrop
TOILET TOILET
PERSON 1"Ø
ISLAMIC FOUNDATION ½ "ØDrop ¾"Ø Run
D2
ENGR. MD. NAZIBAR RAHMAN
GRNERAL STAFF
MAIN PRAYER HALL ENGR. MD. NAZIBAR RAHMAN NOTE
VERANDAH ½ "Ø ½"ØDrop ½ "Ø ¾"Ø Run
LOBBY
ENTRY
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT: SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
1¼"Ø Concealed ½"ØDrop ¾"ØDrop
ISLAMIC REACHERS CENTER 1. PLEASE DO NOT SCALE FROM THIS DRAWING.
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
1¼"Ø Concealed
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
1'-6"
01 .................. 2020 04
FIRE FIGHTING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK. TOILET TOILET TOILET TOILET
¾"Ø
10" TOILET FOR 02 05
FIRE FIGHTING
DISABLE 03 06
Electrical PERSON
PERSON
Duct COPYRIGHT ½"Ø DRAWING TITLE
1'-3" SERVICE ARE AND SHALL REMAIN THE PROPERTY OF Waste & Rain Water
1'-0"
4"
FIRE/STAIR
4'-3"x4'-6" 02 05
SHOWER
4'-6" 4'-6"
03 06
WWP
DRAWING TITLE
Soil Pipe
N Rain Water
W E
1st FLOOR PLAN TOILET MARKING
& FIXTURE LAY OUT
S 1ST FLOOR
CAD DESIGNED BY
MALE ABLUTION
TOILET FOR T7 UP
PROPOSED 03 - STORIED
DISABLE
TOILET PERSON T6 (WITH 4- STORIED FOUNDATION)
10"w-3'h
KITAB SHELF
UP CONSULTANT
STAIR
Electrical Duct
PLUMBING DESIGNER
MALE PRAYER HALL
NOTE
2 " Ø PIPE
CONSULTANT
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT: 3RD FLOOR
LEVEL 3RD FLOOR
1. PLEASE DO NOT SCALE FROM THIS DRAWING. GATE VALVE
2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL 1 ½ " Ø PIPE ABOVE FALSE CEILING
DIMENSIONS AT THE SITE. F. SLAB
3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY PLUMBING DESIGNER
DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.
FIRE FIGHTING
EQUIPMENT BOX.
VOID (OPEN TO SKY)
EQUIPMENT BOX. TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
10"
1ST FLOOR
6'-0"
REVISION
FEMALE ABLUTION
REVISION
02 05 NO. DATE NO. DATE
T6/1
UP
01 .................. 2020 04
PLUG - OFF
FIRE/STAIR
Vent Pipe
LOBBY
03 06 02 05
GROUND FLOOR 03 06
CONSULTANT
3RD FLOOR
LEVEL 3RD FLOOR
GATE VALVE
1 ½ " Ø PIPE ABOVE FALSE CEILING
F. SLAB
PLUMBING DESIGNER
2ND FLOOR
LEVEL 2ND FLOOR
GATE VALVE NOTE
1 ½ "Ø PIPE ABOVE FALSE CEILING
ISLAMIC FOUNDATION BANGLADESH F. SLAB
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
COPYRIGHT
Establishing 560 Model Mosque And 1ST FLOOR
1ST FLOOR DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF
Islamic Cultural center project LEVEL SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WITH APPROPRIATE PROFESSIONAL FEE TO THE
F. SLAB ENGINEER.
STAIR
PE-1
01 .................. 2020 04
02 05
SLO
SLOPE-1:250
E-1
2"Ø PIPE
OP
SCHEMATIC DIAGRAM
LAND FOR ISLAMIC FOUNDATION
:25
E-1:2 BANGLADESH.
DETAILS -D 1/1
50
DOME-3
VOID (OPEN TO SKY)
DOWN PIPE WATER TANK -01 DOWN PIPE CONSULTANT MOHAMMAD ABDUR RAHIM
D1=2"Ø
50 DATE NOV.-2020 SHEET NO. P-12
E-1:2
B SLOP
0
SL
1:25
50
OP
SLOPE-1:250
1:2
E-1
PE-
PE-
:25
0
SLO
SLO
SLOPE-1:250
PLUMBING DESIGNER
SLOPE-1:250
0
1:25
PE-
50
1:2
SLO
PE-
SLO
1:25
OP
0
E-1
:25
RAIN WATER
0
DOME-1 DOME-2
DOWN PIPE NOTE
28' -0" DIA 14' -0" DIA
1 ½"Ø PIPE 50 THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
-1:2
PE
SLO 1. PLEASE DO NOT SCALE FROM THIS DRAWING.
SLOP 2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
E-1:2 DIMENSIONS AT THE SITE.
COPYRIGHT
SLOPE-1:250 Establishing 560 Model Mosque And
Islamic Cultural center project
SLO
SLO
PE-
ROOF
1:2
PROJECT NAME
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
LEVEL ROOF TOP
SLOPE-1:250
50
0
D1/1=2"Ø :25 WITH APPROPRIATE PROFESSIONAL FEE TO THE F. SLAB ZILA MODEL MASJID AND ISLAMIC
PE-
PE-
50
OP
SLOPE-
DRAWING TITLE
E-1
:25
1:250
DN.
2ND FLOOR
LEVEL 2ND FLOOR
COPYRIGHT
N CAD DESIGNED BY
1ST FLOOR
WATER SUPPLY PIPE LAYOUT ON ROOF 1ST FLOOR DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF
LEVEL SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
W E
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
GATE VALVE NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
1"Ø PIPE ABOVE FALSE CEILING TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WITH APPROPRIATE PROFESSIONAL FEE TO THE
F. SLAB ENGINEER.
01 .................. 2020 04
PLUG - OFF
02 05
GROUND FLOOR 03 06
LEVEL
DATE NOV.-2020 SHEET NO. P-06 GROUND FLOOR DRAWING TITLE
SCHEMATIC DIAGRAM
( WATER DISTRIBUTION SYSTEM )
DETAILS -D2
PROJECT NAME
CONSULTANT
NOTE
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
COPYRIGHT
REVISION
NO. DATE NO. DATE
01 .................. 2020 04
CC BLOCK MAIN ROOF
ON ROOF 02 05
DRAWING TITLE
SECTION -B B
CAD DESIGNED BY