PLUMBING DRAWING

PROJECT
NAME:
PROPOSED
03
-
STORIED
(WITH
4-
STORIED
FOUNDATION)
ZILA
MODEL
MASJID ISLAMIC FOUNDATION BANGLADESH

AND LEGEND

1. Sink :
Establishing 560 Model Mosque And
Islamic Cultural center project

PROJECT NAME

ISLAMIC 2. Basin :
PROPOSED 03 - STORIED
(WITH 4- STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
BANGLADESH.

CULTURAL
CONSULTANT

3. Long Pan :

4. Commod :
PLUMBING DESIGNER

CENTER 5. 4" Soil Pipe :

6. 4" Waste Water Pipe :


ENGR. MD. NAZIBAR RAHMAN

AT
NOTE
7. 2" Vent Pipe : THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:

1. PLEASE DO NOT SCALE FROM THIS DRAWING.


2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
8. 1¼" Concealed Pipe :
ISLAMIC FOUNDATION BANGLADESH
DIMENSIONS AT THE SITE.
3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY
DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING

( for Basin ww ) (IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.

PLAIN
COPYRIGHT

9. 4" Rain Water Down Pipe : DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF

Establishing 560 Model Mosque And Islamic Cultural center project


SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND

10. Water Supply Pipe Layout : WITH APPROPRIATE PROFESSIONAL FEE TO THE
ENGINEER.

LAND 11. Floor Gratings :

12. 4"Ø Soil Stack :


REVISION
NO.

01

02

03

DRAWING TITLE
DATE

.................. 2020 04

05

06
NO. DATE

DATE :- FOR
NOVEMBER - 2020 SCALE - AS SHOWN
13. 4"Ø Waste Water Stack :

14. Under Ground Soil Pipe, Waste Water Pipe,


GENERAL NOTE

Rain Water Pipe : 6"Ø, Slop : 12" Per 100'-0"

ISLAMIC CAD DESIGNED BY

MOHAMMAD ABDUR RAHIM

DATE NOV.-2020 SHEET NO. P-02

FOUNDATION
BANGLADESH.

TYPE - B
EAST ENTRY

03 storied SL. NO.

T1
Rain
Water
Soil Pipe
WWP
SOIL & WASTE WATER PIPE LAYOUT

TOILET
Co
4'-0" hight wall

TOILET
SHOWER

MALE ABLUTION
3'-0" hight wall

½"Ø
TOILET
WATER SUPPLY PIPE LAYOUT

4'-0" hight wall

1"Ø
1½"Ø
¾"Ø

TOILET SHOWER

¾"Ø
¾"Ø

MALE ABLUTION
3'-0" hight wall

¾"Ø

1"ØDrop
ISLAMIC FOUNDATION BANGLADESH

Establishing 560 Model Mosque And


Islamic Cultural center project

PROJECT NAME

PROPOSED 03 - STORIED
(WITH 4- STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
BANGLADESH.

CONSULTANT

PLUMBING DESIGNER

ENGR. MD. NAZIBAR RAHMAN


R1 R1

1¼ "Ø ¾"Ø
1¼"Ø Concealed
¾"Ø NOTE
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:

1. PLEASE DO NOT SCALE FROM THIS DRAWING.


2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
DIMENSIONS AT THE SITE.
¾"Ø 1"Ø ¾"ØDrop 3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY
DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.

COPYRIGHT

DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF


SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
Rain Water NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WWP Soil Pipe WITH APPROPRIATE PROFESSIONAL FEE TO THE
WWP ENGINEER.

REVISION
NO. DATE NO. DATE

01 .................. 2020 04

ISLAMIC FOUNDATION BANGLADESH TOILET TOILET 02 05

03 06

T2 KITCHEN KITCHEN
½"Ø
DRAWING TITLE

TOILET WASH TOILET ¾"Ø WASH ¾"ØDrop


Details of Soil,
Waste & Rain Water
Establishing 560 Model Mosque And Pipe Connection
Islamic Cultural center project ½ "Ø
R2
¾"ØDrop
CAD DESIGNED BY

MOHAMMAD ABDUR RAHIM

PROJECT NAME
Rain Water

DATE NOV.-2020 SHEET NO. P-7


Soil Pipe

Soil Pipe
Water
Rain
WWP

Water
WWP

Rain

PROPOSED 03 - STORIED (WITH 4-


STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
TOILET SHOWER CULTURAL CENTER AT PLAIN
STAIR ELECTRICAL/ LAND FOR ISLAMIC FOUNDATION
GENERATOR ROOM
KITCHEN T2 TOILET TOILET BANGLADESH.
UP
TOILET
GREEN

WASH
T1

1'-0"
1'-7"
CONSULTANT
VOID (OPEN TO SKY)

IMAM TRAINING CENTER OUT


ISLAMIC FOUNDATION BANGLADESH

14'-0" WIDE DRIVE WAY


RAMP SLOPE 1:12
INDIVIDUAL TOILET DETAIL
( FIXTURES AND FITTINGS , SOIL , WASTE WATER & WATER SUPPLY PIPE )
Establishing 560 Model Mosque And
DINING Islamic Cultural center project

PROJECT NAME
PLUMBING DESIGNER
SL. NO. SOIL & WASTE WATER PIPE LAYOUT WATER SUPPLY PIPE LAYOUT PROPOSED 03 - STORIED
(WITH 4- STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
RAIN WATER BANGLADESH.

ENGR. MD. NAZIBAR RAHMAN CONSULTANT

1¼"Ø
1¼ "Ø Concealed MALE
MALE TOILET ABLUTION

T3 PLUMBING DESIGNER

PUBLIC (MUSULLI)
ABLUTION
NOTE TOILET
Car Parking NCF

Underground
Wheel car

ENTRY FOR
PUMP ROOM
stoper

THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT: 1"Ø


RAMP SLOPE 1:12 STORE FOR MASS ENGR. MD. NAZIBAR RAHMAN

AUTISM CORNER 1"Ø


EDUCATION PROGRAME 1. PLEASE DO NOT SCALE FROM THIS DRAWING.
2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL NOTE
DIMENSIONS AT THE SITE.
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY
1. PLEASE DO NOT SCALE FROM THIS DRAWING.
COFFINE CARRIER CAR DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING 2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
DIMENSIONS AT THE SITE.
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.
LOADING/UNLOADING 3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY
DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.

COPYRIGHT
WAITING COPYRIGHT DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF
SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT

TOILET FOR

TOILET FOR
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS

DISABLE

DISABLE
DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF

PERSON

PERSON
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WITH APPROPRIATE PROFESSIONAL FEE TO THE
14'-0" WIDE DRIVE WAY

SERVICE ARE AND SHALL REMAIN THE PROPERTY OF ENGINEER.

WWP MASS EDUCATION ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT


Electrical REVISION
PROJECT Duct WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE

Mortuary

Mortuary
Washing

Washing
NO. DATE NO. DATE
Soil Pipe
TOILET FOR

GREEN
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
T4 01 .................. 2020 04

bed

bed
DISABLE

T3 ¾"Ø
PERSON

Rain TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND 02 05

Water PRAYER SPACE FOR WITH APPROPRIATE PROFESSIONAL FEE TO THE 03 06

ENGINEER.
MALE
DISABLE PERSON DRAWING TITLE
Washing
Mortuary

ABLUTION
T4
bed

REVISION
Rain Water

DEAD BODY WASHING Room DEAD BODY WASHING Room Details of Soil,
Soil Pipe

DATE Waste & Rain Water


TOILET NO. NO. DATE
Pipe Connection
WWP

1"Ø
¾"Ø
DEAD BODY WASHING Room GREEN 01 .................. 2020 04 Under ground
CAD DESIGNED BY
02 05

MOHAMMAD ABDUR RAHIM


¾"Ø

¾"Ø

03 06
1"Ø

GUARD
WWP
Soil Pipe

RAMP SLOPE 1:12 1¼ "Ø WATER SUPPLY PIPE 1"Ø ¾"Ø DRAWING TITLE DATE NOV.-2020 SHEET NO. P-8

OFFICE STAFF
ENTRY FOR
Soil Pipe
WWP

WWP

RAMP SLOPE 1:12

TOILET MARKING
& FIXTURE LAY OUT

GROUND FLOOR

N CAD DESIGNED BY
W E GROUND FLOOR PLAN
S MOHAMMAD ABDUR RAHIM
INDIVIDUAL TOILET DETAIL
ISLAMIC FOUNDATION BANGLADESH

( FIXTURES AND FITTINGS , SOIL , WASTE WATER & WATER SUPPLY PIPE )
Establishing 560 Model Mosque And
Islamic Cultural center project

DATE NOV.-2020 SHEET NO. P-03 PROJECT NAME


SOIL & WASTE WATER PIPE WATER SUPPLY PIPE
SL. NO. LAYOUT LAYOUT PROPOSED 03 - STORIED
(WITH 4- STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
BANGLADESH.

½"Ø CONSULTANT

½"ØDrop
1¼"Ø Concealed
T5 TOILET TOILET

Toilet for
PLUMBING DESIGNER

Toilet for
½ "Ø Dsable Person
TOILET Dsable Person TOILET 1"Ø Run Over False Slab ENGR. MD. NAZIBAR RAHMAN
½ "ØDrop ¾"Ø Run

D2
NOTE
½ "Ø ½"ØDrop ½"Ø
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:

1. PLEASE DO NOT SCALE FROM THIS DRAWING.


2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
DIMENSIONS AT THE SITE.
4'-0" hight wall 3'-0" hight wall 3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY
DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.

1"ØDrop
¾"Ø ¾"Ø COPYRIGHT

½"Ø DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF


SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
SHOWER SHOWER
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
TOILET TOILET
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WITH APPROPRIATE PROFESSIONAL FEE TO THE

MALE ABLUTION
ENGINEER.

MALE ABLUTION
¾"Ø
1"Ø Run Over False Slab
REVISION
1½"Ø Run NO. DATE NO. DATE

T6 D1 1¼"Ø Run
1"ØDrop
01

02
.................. 2020 04

05

TOILET TOILET 03 06
TOILET
TOILET ¾"Ø
DRAWING TITLE

Details of Soil,
½"Ø
¾"ØDrop Waste & Rain Water
Pipe Connection

CAD DESIGNED BY

MOHAMMAD ABDUR RAHIM

DATE NOV.-2020 SHEET NO. P-9

ISLAMIC FOUNDATION BANGLADESH

Establishing 560 Model Mosque And


Islamic Cultural center project
option-03 with w-c

PROJECT NAME
5"w-4'h 5"w-4'h

SHOWER
4'-3"x4'-6"
STAIR

Toilet T5 TOILET TOILET PROPOSED 03 - STORIED


(WITH 4- STORIED FOUNDATION)
ISLAMIC FOUNDATION BANGLADESH

Toilet for UP 9'-9"


ZILA MODEL MASJID AND ISLAMIC INDIVIDUAL TOILET DETAIL
Toilet Dsable MALE ABLUTION CULTURAL CENTER AT PLAIN ( FIXTURES AND FITTINGS , SOIL , WASTE WATER & WATER SUPPLY PIPE )
10"w-3'h

Person +L=5" Establishing 560 Model Mosque And


LAND FOR ISLAMIC FOUNDATION
TOILET TOILET
T1 BANGLADESH.
Islamic Cultural center project

PROJECT NAME

SOIL & WASTE WATER PIPE WATER SUPPLY PIPE


SL. NO. LAYOUT LAYOUT PROPOSED 03 - STORIED
VOID (OPEN TO SKY)

Accounts CONSULTANT
(WITH 4- STORIED FOUNDATION)
8"

ZILA MODEL MASJID AND ISLAMIC


KITAB SHELF

RAMP SLOPE 1:12 CULTURAL CENTER AT PLAIN


Deputy Director. +L=0.00
UP LAND FOR ISLAMIC FOUNDATION
BANGLADESH.
ENTRY

STAIR
CONSULTANT
Electrical
Duct

½"ØDrop

T7
3
1'-716" TOILET TOILET
10"
PLUMBING DESIGNER ¾"Ø
PLUMBING DESIGNER
TOILET FOR DISABLE
TOILET FOR
DISABLE
½ "Ø PERSON

¾"ØØDrop
TOILET TOILET
PERSON 1"Ø
ISLAMIC FOUNDATION ½ "ØDrop ¾"Ø Run
D2
ENGR. MD. NAZIBAR RAHMAN

GRNERAL STAFF
MAIN PRAYER HALL ENGR. MD. NAZIBAR RAHMAN NOTE
VERANDAH ½ "Ø ½"ØDrop ½ "Ø ¾"Ø Run
LOBBY
ENTRY

THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:

MEHRAB 1. PLEASE DO NOT SCALE FROM THIS DRAWING.


2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
DIMENSIONS AT THE SITE.
3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY

LEVEL+ 13'-0" 10"


LEVEL+ 12'-3" OPEN COURTYARD DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.

( SHAHAN) NOTE COPYRIGHT


option-01 DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF

THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT: SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
1¼"Ø Concealed ½"ØDrop ¾"ØDrop
ISLAMIC REACHERS CENTER 1. PLEASE DO NOT SCALE FROM THIS DRAWING.
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS

1¼"Ø Concealed
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND

AND E. CENTER 2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL


WITH APPROPRIATE PROFESSIONAL FEE TO THE
ENGINEER.

DIMENSIONS AT THE SITE.


COFFINE

1'-6"

3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY REVISION


D2 ½"Ø
EQUIPMENT BOX.

NO. DATE NO. DATE


1'-3" DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
T8 ½"ØDrop
½"Ø
EQUIPMENT BOX.

01 .................. 2020 04
FIRE FIGHTING

(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK. TOILET TOILET TOILET TOILET
¾"Ø
10" TOILET FOR 02 05
FIRE FIGHTING

FIRE/ STAIR TOILET FOR


DISABLE
EXIT

DISABLE 03 06
Electrical PERSON
PERSON
Duct COPYRIGHT ½"Ø DRAWING TITLE

Electrical UP DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF Details of Soil,


Duct
8"1'-0"

1'-3" SERVICE ARE AND SHALL REMAIN THE PROPERTY OF Waste & Rain Water
1'-0"

4"

ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT Pipe Connection


WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
LIFT TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND CAD DESIGNED BY
WITH APPROPRIATE PROFESSIONAL FEE TO THE

WATER SUPPLY PIPE TOILET TOILET


T1/1 +L=5"
ENGINEER.
MOHAMMAD ABDUR RAHIM

MALE ABLUTION REVISION


UP

FIRE/STAIR

Pipe Run Bottom of DATE NOV.-2020 SHEET NO. P-10


NO. DATE NO. DATE
1st Floor Slab.
TOILET TOILET 01 .................. 2020 04

4'-3"x4'-6" 02 05
SHOWER
4'-6" 4'-6"
03 06

WWP
DRAWING TITLE
Soil Pipe
N Rain Water

W E
1st FLOOR PLAN TOILET MARKING
& FIXTURE LAY OUT
S 1ST FLOOR

CAD DESIGNED BY

MOHAMMAD ABDUR RAHIM

DATE NOV.-2020 SHEET NO. P-04

ISLAMIC FOUNDATION BANGLADESH

Pipe Run Bottom of Pipe Run Bottom of


2nd Floor Slab. 2nd Floor Slab. Establishing 560 Model Mosque And
Islamic Cultural center project
5"w-4'h 5"w-4'h

TOILET SHOWER STAIR PROJECT NAME


VOID (OPEN TO SKY)

MALE ABLUTION

TOILET FOR T7 UP
PROPOSED 03 - STORIED
DISABLE
TOILET PERSON T6 (WITH 4- STORIED FOUNDATION)
10"w-3'h
KITAB SHELF

ZILA MODEL MASJID AND ISLAMIC


+L=5"
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
TOILET TOILET BANGLADESH.

UP CONSULTANT

STAIR
Electrical Duct

ISLAMIC FOUNDATION BANGLADESH

PLUMBING DESIGNER
MALE PRAYER HALL

Establishing 560 Model Mosque And


Islamic Cultural center project
PIPE
GATE VALVE
2" Ø PIPE
ROOF PROJECT NAME
LEVEL ROOF TOP
ENGR. MD. NAZIBAR RAHMAN
GATE VALVE
PROPOSED 03 - STORIED
1 ½ " Ø PIPE ABOVE FALSE CEILING
MEETING HALL F. SLAB
(WITH 4- STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
ISLAMIC LIBRARY CULTURAL CENTER AT PLAIN

MEHRAB LAND FOR ISLAMIC FOUNDATION


BANGLADESH.

NOTE
2 " Ø PIPE

CONSULTANT
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT: 3RD FLOOR
LEVEL 3RD FLOOR
1. PLEASE DO NOT SCALE FROM THIS DRAWING. GATE VALVE
2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL 1 ½ " Ø PIPE ABOVE FALSE CEILING
DIMENSIONS AT THE SITE. F. SLAB
3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY PLUMBING DESIGNER
DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.
FIRE FIGHTING
EQUIPMENT BOX.
VOID (OPEN TO SKY)

ENGR. MD. NAZIBAR RAHMAN


COPYRIGHT 2ND FLOOR
LEVEL 2ND FLOOR
FIRE/ STAIR DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF GATE VALVE NOTE
SERVICE ARE AND SHALL REMAIN THE PROPERTY OF 1 ½ "Ø PIPE ABOVE FALSE CEILING
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT F. SLAB
7'-0'' HEIGHT WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
1. PLEASE DO NOT SCALE FROM THIS DRAWING.
2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
FIRE FIGHTING
1½" Ø PIPE

PARTITION NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS DIMENSIONS AT THE SITE.


1'-3"

Electrical Duct 3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY

EQUIPMENT BOX. TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
10"

UP (IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.


WITH APPROPRIATE PROFESSIONAL FEE TO THE
ENGINEER.
COPYRIGHT
KITAB SHELF

FEMALE PRAYER HALL

1ST FLOOR
6'-0"

LIFT LEVEL 1ST FLOOR DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF

REVISION
FEMALE ABLUTION

SERVICE ARE AND SHALL REMAIN THE PROPERTY OF

STORE 6'-0" GATE VALVE


ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
10" NO. DATE NO. DATE
TOILET
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
TOILET 1 ½ "Ø PIPE ABOVE FALSE CEILING TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WITH APPROPRIATE PROFESSIONAL FEE TO THE
F. SLAB ENGINEER.
01 .................. 2020 04

REVISION
02 05 NO. DATE NO. DATE

T6/1
UP

01 .................. 2020 04
PLUG - OFF
FIRE/STAIR

Vent Pipe
LOBBY

03 06 02 05

GROUND FLOOR 03 06

DRAWING TITLE LEVEL GROUND FLOOR


TOILET DRAWING TITLE
CHANGE
4'-6" 4'-6"
SCHEMATIC DIAGRAM
( WATER DISTRIBUTION SYSTEM )

TOILET MARKING DETAILS -D1

& FIXTURE LAY OUT


SCHEMATIC DIAGRAM ( WATER DISTRIBUTION SYSTEM ) - D1 CAD DESIGNED BY
Pipe Run Bottom of 2ND FLOOR
2nd Floor Slab. MOHAMMAD ABDUR RAHIM
N
W E
2ND FLOOR PLAN CAD DESIGNED BY DATE NOV.-2020 SHEET NO. P-11

S MOHAMMAD ABDUR RAHIM

DATE NOV.-2020 SHEET NO. P-05

ISLAMIC FOUNDATION BANGLADESH

Establishing 560 Model Mosque And


Islamic Cultural center project
GATE VALVE PIPE
2" Ø PIPE
ROOF PROJECT NAME
LEVEL ROOF TOP
GATE VALVE
PROPOSED 03 - STORIED
1 ½ " Ø PIPE ABOVE FALSE CEILING
(WITH 4- STORIED FOUNDATION)
F. SLAB ZILA MODEL MASJID AND ISLAMIC
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
BANGLADESH.
2 " Ø PIPE

CONSULTANT
3RD FLOOR
LEVEL 3RD FLOOR
GATE VALVE
1 ½ " Ø PIPE ABOVE FALSE CEILING
F. SLAB
PLUMBING DESIGNER

ENGR. MD. NAZIBAR RAHMAN

2ND FLOOR
LEVEL 2ND FLOOR
GATE VALVE NOTE
1 ½ "Ø PIPE ABOVE FALSE CEILING
ISLAMIC FOUNDATION BANGLADESH F. SLAB
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:

1. PLEASE DO NOT SCALE FROM THIS DRAWING.


2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
DIMENSIONS AT THE SITE.
1¼"Ø PIPE

3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY


DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.

COPYRIGHT
Establishing 560 Model Mosque And 1ST FLOOR
1ST FLOOR DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF

Islamic Cultural center project LEVEL SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WITH APPROPRIATE PROFESSIONAL FEE TO THE
F. SLAB ENGINEER.

PROJECT NAME REVISION


:250

NO. DATE NO. DATE

STAIR
PE-1

01 .................. 2020 04

02 05
SLO

SLOPE-1:250

-1:250 B PROPOSED 03 - STORIED GROUND FLOOR 03 06

LEVEL GROUND FLOOR


SLOPE
0 UP (WITH 4- STORIED FOUNDATION) DRAWING TITLE
:25
D2=1 ¼"Ø ZILA MODEL MASJID AND ISLAMIC GATE VALVE
SL

E-1
2"Ø PIPE
OP

OP 1¼ "Ø PIPE ABOVE FALSE CEILING


SL CULTURAL CENTER AT PLAIN
E-1

SCHEMATIC DIAGRAM
LAND FOR ISLAMIC FOUNDATION
:25

( WATER DISTRIBUTION SYSTEM )


SLOP
0

E-1:2 BANGLADESH.
DETAILS -D 1/1
50
DOME-3
VOID (OPEN TO SKY)

11' -0" DIA SCHEMATIC DIAGRAM ( WATER DISTRIBUTION SYSTEM ) - D1/1


RAIN WATER RAIN WATER CAD DESIGNED BY

DOWN PIPE WATER TANK -01 DOWN PIPE CONSULTANT MOHAMMAD ABDUR RAHIM
D1=2"Ø
50 DATE NOV.-2020 SHEET NO. P-12
E-1:2
B SLOP
0

SL
1:25

50

OP
SLOPE-1:250
1:2

E-1
PE-

PE-

:25
0
SLO

SLO

SLOPE-1:250
PLUMBING DESIGNER
SLOPE-1:250
0
1:25
PE-

50
1:2
SLO

PE-
SLO

SLOPE-1:250 SLO ENGR. MD. NAZIBAR RAHMAN


PE-
SL

1:25
OP

0
E-1
:25

RAIN WATER
0

DOME-1 DOME-2
DOWN PIPE NOTE
28' -0" DIA 14' -0" DIA
1 ½"Ø PIPE 50 THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
-1:2
PE
SLO 1. PLEASE DO NOT SCALE FROM THIS DRAWING.
SLOP 2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
E-1:2 DIMENSIONS AT THE SITE.

ROOF 3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY


50
SLOPE-

DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING


(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK. ISLAMIC FOUNDATION BANGLADESH
1:250

VOID (OPEN TO SKY)

COPYRIGHT
SLOPE-1:250 Establishing 560 Model Mosque And
Islamic Cultural center project
SLO

SLO

DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF GATE VALVE PIPE


PE-

PE-

SERVICE ARE AND SHALL REMAIN THE PROPERTY OF 1 ½" Ø PIPE


1:25

ROOF
1:2

PROJECT NAME
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
LEVEL ROOF TOP
SLOPE-1:250
50
0

WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE


NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS GATE VALVE
B PROPOSED 03 - STORIED
0
50

1" Ø PIPE ABOVE FALSE CEILING


1:25

0 TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND (WITH 4- STORIED FOUNDATION)


1:2

D1/1=2"Ø :25 WITH APPROPRIATE PROFESSIONAL FEE TO THE F. SLAB ZILA MODEL MASJID AND ISLAMIC
PE-
PE-

E-1 CULTURAL CENTER AT PLAIN


OP ENGINEER.
SLO
SLO

SL LAND FOR ISLAMIC FOUNDATION


BANGLADESH.
SLOPE-1:250 SLOP
E-1:2
50 REVISION
2" Ø PIPE

RAIN WATER 1 ½"Ø PIPE NO. DATE NO. DATE


CONSULTANT
3RD FLOOR
DOWN PIPE DOME-3 01 .................. 2020 04 LEVEL 3RD FLOOR
RAIN WATER 11' -0" DIA GATE VALVE
02 05 1" Ø PIPE ABOVE FALSE CEILING
WATER TANK -02 2"Ø PIPE DOWN PIPE
F. SLAB
FIRE/ STAIR

SLOP 03 06 PLUMBING DESIGNER


E-1:2
SL

50
OP
SLOPE-

DRAWING TITLE
E-1
:25

B ENGR. MD. NAZIBAR RAHMAN


0

1:250
DN.

2ND FLOOR
LEVEL 2ND FLOOR

WATER SUPPLY PIPE GATE VALVE


1"Ø PIPE ABOVE FALSE CEILING
NOTE
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:
LAYOUT ON ROOF F. SLAB
1. PLEASE DO NOT SCALE FROM THIS DRAWING.
2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
1 ½" Ø PIPE

DIMENSIONS AT THE SITE.


3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY
DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.

COPYRIGHT

N CAD DESIGNED BY
1ST FLOOR

WATER SUPPLY PIPE LAYOUT ON ROOF 1ST FLOOR DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF
LEVEL SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT

W E
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
GATE VALVE NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
1"Ø PIPE ABOVE FALSE CEILING TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WITH APPROPRIATE PROFESSIONAL FEE TO THE
F. SLAB ENGINEER.

MOHAMMAD ABDUR RAHIM


S REVISION
NO. DATE NO. DATE

01 .................. 2020 04
PLUG - OFF
02 05

GROUND FLOOR 03 06

LEVEL
DATE NOV.-2020 SHEET NO. P-06 GROUND FLOOR DRAWING TITLE

SCHEMATIC DIAGRAM
( WATER DISTRIBUTION SYSTEM )
DETAILS -D2

SCHEMATIC DIAGRAM ( WATER DISTRIBUTION SYSTEM ) - D2 CAD DESIGNED BY

MOHAMMAD ABDUR RAHIM

DATE NOV.-2020 SHEET NO. P-13

ISLAMIC FOUNDATION BANGLADESH

Establishing 560 Model Mosque And


Islamic Cultural center project

PROJECT NAME

PROPOSED 03 - STORIED (WITH 4-


STORIED FOUNDATION)
ZILA MODEL MASJID AND ISLAMIC
CULTURAL CENTER AT PLAIN
LAND FOR ISLAMIC FOUNDATION
BANGLADESH.

CONSULTANT

OVER FLOW PIPE


PLUMBING DESIGNER
WATER SUPPLY INLET PIPE

ENGR. MD. NAZIBAR RAHMAN

GATE VALVE INTER CANNECTION 1½ "Ø PIPE

NOTE
THIS NOTE IS VALID FOR DRAWINGS RELATED TO THIS PROJECT:

1. PLEASE DO NOT SCALE FROM THIS DRAWING.


2. CONTRACTORS AND SUB-CONTRACTORS ARE TO VERIFY ALL
DIMENSIONS AT THE SITE.
3. THE CONTRACTOR IS TO NOTIFY THE CONSULTANT ABOUT ANY
DIS CREPANCIES/DIFFERENCES CONTAINED IN THE DRAWING
(IN RELATION TO OTHER DRAWINGS) BEFORE STARTING THE WORK.

COPYRIGHT

DRAWINGS AND SPECIFICATIONS AS INSTRUMENTS OF


SERVICE ARE AND SHALL REMAIN THE PROPERTY OF
ENGINEER /CONSULTANT / FIRM WHETHER THE PROJECT
WHICH THEY ARE MADE IS EXECUTED OR NOT. THEY ARE
1 ½ "Ø PIPE 2 "Ø PIPE NOT TO BE USED ON OTHER PROJECTS OR EXTENSIONS
TO THE PROJECT EXCEPT BY WRITTEN AGREEMENT AND
WITH APPROPRIATE PROFESSIONAL FEE TO THE
D2 D1 ENGINEER.

REVISION
NO. DATE NO. DATE

01 .................. 2020 04
CC BLOCK MAIN ROOF
ON ROOF 02 05

WATER TANK -02 03 06

DRAWING TITLE
SECTION -B B

ROOF TOP OVER HEAD


WATER TANK

CAD DESIGNED BY

MOHAMMAD ABDUR RAHIM

DATE NOV.-2020 SHEET NO. P-14