Mega Projects in
Bangladesh and its
Impact on National
Economy
Author
Abu Hasnat
Undergraduate Student
Jahangirnagar University, Bangladesh
Page 2 of 41
Table of Content
Particulars Page
Part - 9 Conclusion 29
Reference 38
Page 3 of 41
Chapter: ONE
Introduction Part
Page 4 of 41
Introduction
Therefore, a more general definition is "Megaprojects are temporary endeavours (i.e. projects)
characterized by: large investment commitment, vast complexity (especially in organizational
terms), and long lasting impact on the economy, the environment, and society".
Page 5 of 41
Karnaphuli Tunnel
Padma Bridge is the highest priority and largest investment project of Bangladesh. It is a
multipurpose road-rail bridge across the Padma River, the main distributary of Ganges, under
construction in Bangladesh with its own resources. It connects Louhajong,Munshiganj to
Shariatpur and Madaripur, linking the south-west of the country, to northern and eastern
regions.
It has removed the last major physical barrier in the road connection between Dhaka
and the Southwest region of Bangladesh.
It has also reduced the problem of limited ferry capacity and long waiting time. Because
ferry services are sometimes interrupted for days during fog and high floods.
Through the construction of the Padma Bridge the unreliable and unsafe ferry
connection will be replaced by a reliable and safe fixed river crossing.
Increased cargo movement between Dhaka and the Mongla Port will also reduce
congestion in the port of Chattogram.
The bridge will help to increase the annual GDP of the south by 2 percent and the overall GDP
of the country by more than 1 percent.
It will also connect the port of Mongla and the port of Payra, respectively the second and
thirdlargest ports in the country, with the capital.
Agriculture and industry will be benefited from new business opportunities brought about by
improved transportation. New industrial units will be established, creating a large number of
job possibilities.
World Bank predicted that the poverty reduction rate will increase by 1 percentage point in the
region and by 0.8 percentage points at the national level.
It is expected that the travel time between the Dhaka division and the south-western region will
be saved by about two hours for cars and buses and over 10 hours for trucks. A 10 per cent
Page 11 of 41
reduction in travel time to and from Dhaka will lead to a rise in the region's economic output
by 5.5 per cent.
The bridge could be the source of energy where solar and wind are the major element,
this would help the countries power generation lacking.
Loss of land and Involuntary resettlement.
Loss of aquatic biodiversity, terrestrial biodiversity, vegetation.
Air and Noise Pollution.
Improve accessibility to the Dhaka city with Munshiganj, Shariatpur, Madaripur and
Narail districts.
Connectivity between Dhaka-Jessore-Khulna with 212.05 km shorter route.
A higher quality of service and better amenities to passengers.
It will create opportunity to construct 2nd line in this route and connect Barisal & Payra
Deep Sea Port in future.
Over 15 million people of the city may get rid of the curse of the traffic jams by the
giant metro rail project.
The entire route will be able to be travelled in less than 40 minutes while the normal
public buses require three to 3-and-half hours on travel between Uttara and
Motijheel/Kamalapur.
It will reduce the number of private cars on Dhaka's streets as well as their potentially
7-hour-long standstills.
The system plans to use magnetic contactless Integrated Circuit that will increase safety
and increase efficiency.
Metro Rail project will save $2.4 Billion each year. which is equal to 1.5% of the
national GDP and 17% of the total tax revenue of Bangladesh, citing a government
estimation.
The traffic congestion in Dhaka is causing a loss of $4.4 billion annually, also 3.8
million working hours are being wasted every day. Metro project will change the look
of Dhaka city and play a revolutionary role in the city's traffic system.
The rail has capacity of carrying 60,000 passengers per hour, that will reduce the usage
of Buses. In this way it will reduce air pollution, Crowd, Dust and fume.
It will also reduce traffic jam.
Page 13 of 41
Realistic Impact:
Economic Impact:
Realistic Impact:
Economic Impact:
the dual-gauge double-track railway bridge will save at least 20 minutes of commute
time as no train will have to wait for line crossing.
the trains will run at a speed of 100kmph to 120kmph on the railway bridge compared
to the present speed of 10kmph on the Bangabandhu Bridge.
Environmental Impact:
Due to its construction, many people will be able to reach together by using one train,
which will reduce bus traffic, reduce environmental pollution and save fuel oil.
As a result, the river Yamuna will have to be controlled and the water level will rise as
a result.
Dhaka Elevated Expressway is Bangladesh's first elevated expressway project, which will
connect from Hazrat Shahjalal International Airport and end at Dhaka-Chittagong Highway
near Kutubkhali. It is one of the largest infrastructure projects taken up by the incumbent
Page 15 of 41
government to ease traffic congestion in the capital. It will be 46.73 km (153,300 ft) long
including the connecting roads and will cost around ৳122 billion (US$1.3 billion)
The main objective of this project is to bypass Dhaka vertically in the fastest possible
way, which would significantly reduce the traffic load inside the capital.
The four lane Elevated Expressway will improve accessibility to the Shahjalal airport
with Kutubkhali via Mohakhali, Tejgaon and Kamalapur of Dhaka, BangladeshThis
expressway will allowing the private cars and motorbikes to travel from north to south
in just 20 minutes.
Ahmed Shaaek, scheduling and office engineer, said, "The traffic in Dhaka is a
nightmare at the moment.
the project will have a positive impact on GDP, growing annually by between 5-7% for
the last decade.
Its overall progress was recorded 44.8% since its commencement in January 2020.
The way green spaces are declining is alarming. The green spaces with dense forest
declined from 17 percent to 2 percent.
This has an adverse impact on the lives of the city residents.
The decline in green spaces causes a top contributor to the rising temperature of Dhaka
city.
It’s create employment for 4000 people during the railway construction period and
12500 people are fields related job.
It also contribute social and economic benefit, The estimated benefit – cost ratio (BCR)
was 1.23 that net present value was 762.34 million USD.
Karnaphuli Tunnel
Economic impact :
The tunnel will essentially transform Chittagong into a ‘one city, two towns’ model like
Shanghai, China. Once the tunnel is built, the communication system will become faster and
easier in Cox’s Bazar district, including Anwara, Banshkhali, Patia, and Chandanish with
Chittagong city. The distance from Shah Amanat International Airport, which is located in the
main city of Chittagong, to Anwara Upazila via Chittagong-Cox’s Bazar highway is about 34.6
km which takes 2 to 3 hours to travel. On the other hand, the distance of Bangabandhu Tunnel
from the airport is only 2 km, and after becoming fully functional, it will take only 30 minutes
to reach Anwara from the airport. After completion of the project, Chittagong Airport,
Chittagong Port, and Patenga-Anwara link, as well as the under-construction bay terminal,
Mirsarai Economic Zone, CUFL, Karnaphuli Fertilizer Company Limited, China EPZ, and
Cox’s Bazar coal power plant will also be served via the tunnel and its approach road, which
Page 17 of 41
will simultaneously reduce both travel time and cost. On the other hand, the distance of two
different routes from Chittagong city to the tourist city Cox’s Bazar is 148 km, and 152 km,
respectively. Moreover, the distance from Dhaka to Cox’s Bazar by road is 398 km which takes
about 9 hours to cover. By using the Bangabandhu Tunnel, the distance from Dhaka to Cox’s
Bazar will be reduced by at least 50 km. Cox’s Bazar district is located in the southernmost
part of the country, and it is recognized as the tourist city of Bangladesh. Because, Cox’s Bazar,
the world’s largest natural beach, attracts about 10 million tourists every year, of which 17
percent are local tourists. However, one has to travel a long way to reach this tourist city from
Dhaka or the north-western part of the country. Besides, since there is no international airport
in Cox’s Bazar, and there is no direct flight from Chittagong Airport to Cox’s Bazar, foreign
tourists often have to reach Cox’s Bazar by road from Chittagong Airport, which is quite
timeconsuming. According to a source from Bangladesh Bridge Authority, if the Karnaphuli
tunnel is fully functional, the distance from Chittagong city to Cox’s Bazar will be reduced by
about 15 km, which will further reduce the time of tourists as well as traffic congestion.
Moreover, it will also help to further enrich the tourism of Cox’s Bazar.
Apart from Cox’s Bazar, the Karnaphuli Tunnel Feasibility Report has proposed recreational
activities at Parkir Char on the eastern side of the Karnaphuli River and South Patenga on the
western side, which is under the latest development. Coastal-related tourist facility
development, existing Patenga sea beach upgradation, and new site development on about 1700
acres of land in the Char area of Parki are also highlighted in this report. An area on the west
side of the beach will be reserved only for camping, picnics, annual sporting events, and other
community events. On the other hand, certain areas on the eastern side of Patenga Road have
been allocated for amusement parks. Apart from turning the area between the Chittagong
airport and the industrial area into a water-based tourist site, the report also suggested
developing a 1-km harbourfront public promenade from the airport to the naval installation.
Chittagong will also become a tourist destination if the initiatives being taken for new
development along with further upgrading of the existing tourist spots around the Bangabandhu
Tunnel are completed, and it will further enrich the tourism sector of the country.
Realistic Impact :
Due to the Bangabandhu Tunnel, special industrial development activities are also going on in
Page 18 of 41
Chittagong. According to the Bangabandhu Tunnel Feasibility Test report, out of the 6055
acres of industrial area in Chittagong city, 5,188 acres of land is west of the Karnaphuli river,
and only 867 acres is on the east bank.
Of the 6055 acres of industrial area in Chittagong city, 5,188 acres of land is west of the
Karnaphuli river, and only 867 acres is on the east bank.
As against 47 percent agricultural land in Anwara and surrounding areas on the east bank of
Karnaphuli River, less than 2 (1.7%) percent of the land is used for industrial purposes
(Manufacturing & Processing). However, about 9 thousand (8,981) acres of land can be
developed as an industrial zone in the Anwara only after the tunnel is opened. Meanwhile, the
Mustafa Hakim Group has set up a steel plant and an oxygen plant on the south bank of the
Karnaphuli River at the cost of BDT 1500 crore surrounding the tunnel, which currently
employs around 2,000 people. Apart from this, several companies such as Super
Pharmaceutical Limited, Partex Petro Limited, Acorn Infrastructure Service Limited, and BN
Lubricant are currently operational in the Juldha area of Karnaphuli. On the other hand,
Bellamy Textiles, ATP International Limited, GSL Exports, Benchmark Apparel, and USA
Battery Factory have already started their production in Khwajanagar and Ichanagar. Apart
from this, a garment factory named “HS Composite Textile” is being constructed near the
approach road for the tunnel, which is likely to provide employment to at least three to five
thousand people. Besides, the country’s leading industrial companies like Akiz Group, Four H
Group, Diamond Cement, S Alam Group, and Pertex Group
have already purchased land in Anwara and Karnaphuli areas to set up their factories. Besides,
the work of establishing the country’s first specialized G-2-G Economic Zone Chinese
Economic Zone on 781 acres of land in Chittagong’s Anwara Upazila is underway, which will
create employment for at least 2 lakh people after its completion. Moreover, according to a
source from Bangladesh Economic Zones Authority, more than 60 local and foreign companies
have already shown interest in investing about 280 million dollars in this economic zone. By
doing this, massive industrialization will happen on both sides of the entire Karnaphuli river
around the tunnel. It will simultaneously turn Chittagong into a business hub and create massive
employment for the people of Anwara and Patenga.
The Karnaphuli Tunnel transformed Chittagong into a business hub and has massively
improvement employment.
Page 19 of 41
Besides, the Karnaphuli tunnel will play an important role in Chittagong as well as the overall
economy of the country. According to the feasibility report of the tunnel, the tunnel will directly
contribute 0.166 percent to the country’s GDP every year for the next 50 years. Because, once
the tunnel is completed, Chittagong port, one of the country’s commercial ports, and Matarbari
deep sea port will benefit directly. According to the Karnaphuli Tunnel Feasibility Report, the
cargo handling capacity of the port will increase to 320 million tonnes per annum by 2055 after
the Matarbari Deep Sea Port becomes operational. From there, the Dhaka-Chittagong highway
has to be used to transport these goods by trucks to different parts of the country.
Environmental Impact :
In every mega project , there are used lots of plastic , iron , chemical materials . Certainly ,
there must be used those materials which may caused a great pollution in river which is
alarming for the people of the country.
Economic Impact :
Links of the Expressway are to be constructedover very busy roads of the city. There are 31
entry and exit ramps of the Expressway, which connect it with major existing roads of the city.
Significant traffic disruption is likely duringconstruction of Expressway over roads/
flyovers/foot overpasses, construction of the twoelevated Links along busy roads, and
construction of the entry and exit ramps on busy roads.Temporary traffic congestion during the
construction phase may result from increased movement of vehicles carrying materials and
equipment to and from the site. Traffic congestion may be aggravated if materials (e.g.,
construction materials) are stored on the street and equipment /machines/vehicles are
kept/parked on the street.As noted earlier, the Expressway would passes over a number of
major roads, levelcrossings, flyover/ elevated road and foot over-bridge. In addition to regular
safety measures, special construction methodology would have to be followed to ensure safety
during construction of Expressway over live railway tracks, over and along major busy roads.
Occupational health and safety is an important issue during construction
phase.Generalconstruction activities pose safety risks, which should be addressed as part of
occupational health and safety plan.
Realistic Impact :
According to a recent BUET study, in 2022, over 6 million working hours are being wasted
on Dhaka roads every day. The unbearable traffic mess in the capital Dhaka is not only ruining
people's suffering and working hours but also GDP and per capita income. According to a
research report by BIDS, the annual loss due to traffic mess in Dhaka alone is 2.9 percent of
the gross domestic product(GDP).
As a new base year, the fall in financial value is Tk 101,036crore. Besides, five million working
hours are being wasted daily in Dhaka alone due to snarl-up whose financial loss is about thirty.
six thousands crore taka a year
In addition, the immense suffering and wastage of time of people moving from one place to
another in Dhaka city has now reached a paranormal level where one has to wait for hours to
Every day when you get on the road, you have to fall into miserable traffic tie-up. The traffic
Page 21 of 41
congestion, the hours of public transport being stuck for hours, will change in a few months.
The mammoth project of the government to alleviate traffic mess in the capital is the
construction of Dhaka Elevated Expressway.
Starting from Shahjalal International Airport it will end at Kutubkhali on the Dhaka-Chittagong
Highway. A leading part of the colossal project from the airport to Tejgaon Railgate will be
launched in coming out this December.
With the opening of this expressway, the road-scenario in the capital will be changed. Traffic
congestion will be consolidated, people's suffering on the street will be waned. About 60,000
vehicles will be able to pass through it every day.
Once the project is accomplished, Jatrabari can be reached in just fifteen to twenty minutes
from the airport. While it is fully operational, the snarl-up scene in the capital Dhaka will be
attenuated. The government has taken miscellaneous initiatives to make the capital Dhaka a
modern city. If the project is substantiated, the city dwellers will be relieved from the misery
of the endurance. The project will work like a silver bullet to build a latter Dhaka free from
traffic congestion. This will augment the connectivity and traffic capacity of the north-south
part of Dhaka City. Furthermore, establishing advanced services in the Asian
HighwayCorridor, it will also enhance regional connectivity. After the implementation, the
project will have a significant impact on GDP.The elevated expressway will serve as an
alternative road north-south of Dhaka. It will connect Hemayetpur-Kadamtali-Nimtali-
SirajdikhanMadanganj-Dhaka-Chittagong Highway-Madanpur directly.
Environmental Impact :
Page 22 of 41
Phase Ecological Impacts:The project activities are likely to have minor impact on the
ecological parameters. Areasalong Tranche-1 of the Expressway have moderate number of
planted trees beside the railline (Kawla to Khilkhat and Banani area) that have economic and
aesthetic values. InTranche-2, there is a park a small park (on the western side of Pan Pacific
Sonargaon Hotel /near Panthopath area) with varieties of planted floral species; this entire park
will be usedfor construction of DEE infrastructure. In Tranche-3, notable number of planted
trees also exists (Kamalapur Rail Station Area) In Tranche -1, fish culture is practiced in
some pondsthat have few native fish species; these ponds are likely to be filled up during
constructionphase of the DEE. Cutting of trees for clearing the right of way would be necessary
in somesections of the DEE. However, construction of the DEE is not likely to affect the
overallecology of the area in any significant manner
Economic Impact :
The existing yearly container handling capacity of the Chattogram Port is 3.1 million
Twentyfoot Equivalent Units (TEUs) container. The growing demand will exceed the existing
handling capacity within next year. We have to increase the handling capacity by more 4 billion
TEUs within 2033. Mongla and Payra port will not able to meet the growing demand. So,
Matarbari and Bay Terminal are likely to be the solution. The Matarbari Port is likely to add 2
to 3 percent GDP in the country's economy.
Realistic Impact :
This port will minimize the pressure on the Chattogram Port alongside meeting the growing
demand of the country's import and export activities. Goods transportation to and from the
potential industrial estates at Matarbari and Moheshkhali will also be facilitated once this port
is established.
Environmental Impact :
The deep sea port was proposed to receive imported coal for the proposed 1,200 MW Matarbari
power station. The surrundings of matarbari deep sea –port will may face a hazardous
environment due to coal . Eventually , there is a huge risk about environment because of
importing coal for the powerplant.
Page 24 of 41
Page 25 of 41
We believe that the planning and organization of a project sets the stage or blueprint for
everything. During planning and organization, we set a course for the project and make a
course correction. The planning of megaprojects should consider project management
variables, while also accepting complexity and non-linearity, addressing the power of the
context, as well as the influence of the stakeholders involved, reflecting the actual criteria used
in the decision-making process. We turn our attention to the first phase of mega-project
management by the eight best practices of early planning and organizing.
Page 28 of 41
Early planning and organizing will pay off: You can’t manage a mega-project simply by
drawing on industry experience, following project management principles, and applying
technology. A successful mega-project is the result, in part, of an effective planning and
organizing effort. Bangladesh brings her own unique sets of complexities to projects, and
having a thorough understanding of this through effective early-stage project management will
greatly facilitate a smooth-running mega-project, minimizing the potential ‘mega risk’.
Page 30 of 41
The budget is your plan, which acts as a baseline to measure your performance as you collect
the actual costs once the Megaproject has been started. So, A Megaproject budget is the total
projected costs needed to complete a megaproject over a defined period of time. It’s used to
estimate what the costs of the megaproject will be for every phase of the megaproject. The
project budget will include such things as labor costs, material procurement costs and operating
costs. A megaproject without a budget is like a car without fuel. Funding is essential to get the
megaproject started and set all resources in motion. If we don’t have the funds, we’re not going
Page 31 of 41
to complete the megaproject successfully. Because of this reason project planning and budget
is so important and it’s the lifeblood of any types of projects.
In Megaproject budgeting there are many components necessary to build a budget, including
direct and indirect costs, fixed and variable costs, labor and materials, travel, equipment and
space, licenses and whatever else may impact on our project expenses.
To meet all the financial needs of our megaproject, a project budget must be created thoroughly,
not missing any aspect that requires funding. To do this, we should have follow seven essential
steps, those are describe in bellow:
Use Historical Data: Your project is likely not the first to try and accomplish a specific
objective or goal. Looking back at similar projects and their budgets is a great way to
get a head start on building your budget.
Reference Lessons Learned: To further elaborate on historical data, we can learn from
their successes and mistakes. It provides a clear path that leads to more accurate
estimates. We also can learn about how they responded to changes and kept their budget
under control.
Leverage Your Experts: Another resource to build a project budget is to tap those
who have experience and knowledge—be they mentors, other project managers or
experts in the field. Reaching out to those who have created budgets can help you stay
on track and avoid unnecessary pitfalls.
Confirm Accuracy: Once you have your budget, you’re not done. You want to take a
look at it and make sure your figures are accurate. You can also seek those experts and
other project team members to check the budget and make sure it’s right.
Baseline and Re-Baseline the Budget: Your project budget is the baseline by which
you’ll measure your project’s progress once it has started. It is a tool to measure the
variance of the project. But, as stated above, you’ll want to re-baseline as changes occur
in your project. Once the change control board approves any change you need to
rebaseline.
Page 32 of 41
Update in Real Time: Speaking of changes, the sooner you know about them, the
better. If your project planning software isn’t cloud-based and updating as soon as your
team changes its status, then you’re wasting valuable and expensive time.
Get on Track: Things change and projects go off track all the time. It’s the projects
that get back on track faster that are successful. If you manage your project expenses
using these building blocks you’re going to have a sound foundation for your project’s
success.
Page 33 of 41
In Bangladesh there are 10 megaprojects. This megaproject help supply chain to make it
process fast. Some megaprojects are: Padma Bridge Rail Link, Dhaka Elevated Expressway,
Chittagong Cox’s Bazar Rail Link, Dhaka Airport Third Terminal Etc.
These megaprojects help supply chain to make in process fast. We know the supply chin
process. Suppose, we buy raw materials from Cox's Bazar. But we know that the road is not
well condition in this purpose we can not purchase raw materials quickly. So, the whole process
of supply chain slow down. Because, When we purchase lately then we produce it and sell it
lately that's why the whole process of supply chain slow down. Suppose we want to sell product
in Barisal or Khulna. But we know that there is no option to go to Barisal without ferry crossing
and ferry crossing is a matter of time. It also makes the process of supply chain slow.
But we know that, The Government of Bangladesh take some megaproject. These megaproject
help the supply chain. When there is a Padma Bridge, Rail line etc. Benefit so we can easily
and quickly purchase raw materials and sell the end goods to any area. So, We know, that
megaprojects help the process of supply chain. By using these megaproject we can easily
purchase product from any area and also sell this product to any area. Which means our supply
chain finish quickly.
Page 35 of 41
1) Bangabandhu Satellite-2
Bangabandhu Satellite-2 is the second geostationary communication and broadcasting satellite of
Bangladesh. Earlier in 2018 Bangabandhu-1 satellite was launched. It is scheduled to launch in 2023.
Type of campaign Communication and
Page 36 of 41
broadcasting
satellites
directo Bangladesh Communication
r
Satellite Company Limited
website Bangladesh Communication
Satellite company Limited
Khalid Mahmud also spoke about the government's consultation with the World Bank
regarding the proper management of the Jamuna River under a project named 'Jamuna
Economic Corridor'.
Afeasibility study will be carried out on the project. "If the survey shows positive results,
millions of hectares of land could be reclaimed, ending the long-standing riverbank erosion
problem. And a satellite city will be built on the land to be acquired in two phases -- Economic
Corridor-1 and Economic Corridor-2."
The state minister also spokeabout the government's plan to procure three world-class cruise
vessels with helipad facilities by the end of 2023.
Presided over by BSRF President Tapan Biswas, the event was moderated by forum General
Secretary Masudul Hoque.
section. The present river width, as measured on the satellite images (January 2003), is around
4.8 km including a sand bar. Distributaries from the right flow near the proposed site of the
bridge, the ferry ghaat of Dalutdia is located at one of those outlets.
The proposed bridge will connect National Highways at the Paturia and Goalundo Sides
respectively, which are linked by the ferry services. These connecting roads are both in good
conditions and do not require improvements.
A pre-feasibility study was conducted in 1999. After that, Japan International Cooperation
Agency (JICA) conducted a feasibility study of a fixed river crossing, incorporating road,
railway, telecommunication and gas across the Padma River. The study was completed in
January 2005 and the consultant had submitted the final report in May 2005. In the study, 4
Crossing sites; Paturia-Goalundo, Dohar-Charbhadrasan, Mawa- Janjira and
ChadpurBhedaraganj) were considered based on a plan-form of the Padma river. All four sites
were subject to initial screening following which, two preferred sites; Paturia-Goalundo and
Mawa- Janjira were selected based on the comparative studies from physical, technical,
economic, local infrastructure and social/environmental perspective. The Government has
already taken steps necessary for the construction of the 1st Padma Bridge at Mawa- Janjira
location.
Some districts of Mid and Northwest region will take some time to cross the Padma river
through Mawa-Janjira point than Paturia-Goalundo location. To shorten the distance between
Meherpur, Chuadanga, Kushtia, Jhenadaha, Magura, Rajbari, Faridpur and parts of Narail,
Gopalganj, Jessore and Madaripur Districts with Dhaka and Eastern part of the country it is
imperative to construct 2nd Padma Bridge at Paturia-Goalundo location.
As a step to construct the bridge at Paturia-Goalundo, Government has already approved the
Preliminary Development Project Proposal (PDPP) in-principle.
Negotiations are on to start the feasibility study for the project, concerned officials told the FE.
Page 38 of 41
Recently, the Road Transport and Highways Division had talks with the Korea International
Cooperation Agency (KOICA) for the survey.
The Korean government has agreed to fund the project titled "Transport master plan and
preliminary feasibility study for urban metro rail transit construction of Chattogram
Metropolitan area".
The port city having a population of around 7.5 million is facing severe traffic congestion in
most parts of its 156 square km area.
The project will start after signing the terms of reference (ToR) by both parties, officials said.
Dhaka Urban Transport Coordination Authority (DTCA) of the Road and Transport Division
is coordinating with the KOICA for finalising the project worth US$6.0 million.
According to the draft ToR, the transport master plan and the preliminary feasibility study will
be completed in two years and the implementation period is proposed to be from 2022 to 2024
Recommendation
Page 39 of 41
Providing recommendations for Mega Projects is a tough job indeed. As there are specialist
teams who are continuously working for the improvement of every process. It is quite difficult
for freshers like us to prepare recommendations, but according to us there is a step for which
we would like to recommend some point. These recommendations will definitely improve the
overall process if implemented efficiently.
• Company should monitor materials cost of the market and update actual cost from the
budgeted cost.
• Management can largely depend on the group or team of the company to establish their
own goals and make a decision the activities those are needed to accomplish these
goals, to identify their own problems and solve the problem.
• The executives should be more caring to the maintenance service after handover of the
projects.
• Political parties should be more responsible in declaring any political activities.
• Government should monitor all the activities through official agents from time to time
and reducing the bureaucratic ladders.
Page 40 of 41
Conclusion
We know that all that reality is very different from what we have learnt from our theory
books. A person can only recognize and get the idea of the world when he/she actually tries to
get involved in the processes.
For a country like Bangladesh, infrastructure-megaprojects are crucial drivers for accelerating
economic growth. The country has a higher GDP growth rate than other neighboring countries
like India, Sri Lanka, Pakistan and Bhutan.
In the last 12 years or so the country witnessed a good number of development projects which
can be termed as mega projects. The mega projects, whose completion is expected to raise
Bangladesh's GDP by as much as 4 per cent, are set to get about 48 per cent more allocation in
the upcoming fiscal year, as part of the government's push to ensure their timely
implementation Seven of the eight mega projects-- Padma bridge, Padma bridge rail link,
Dhaka mass rapid transit line-6 (Metro Rail), Chattogram-Cox's Bazar rail link, Rooppur
nuclear power plant, Matarbari 1200MW coal-fired power plant and the Payra deep sea port
are extremely crucial to the country's economic growth and hence the key focus of the
government now is their timely completion.
For such a developing economy, megaprojects are necessary for increasing GDP growth rate.
This growth rate in turn is important for capital accumulation and funding other megaprojects
in future.
Page 41 of 41
Reference
1. https://www.forecast.app/,
2. https://businessinspection.com.bd/top-7-ongoing-mega-projects/
3. https://en.m.wikipedia.org/wiki/Megaproject
4.https://en.m.wikipedia.org/wiki/List_of_megaprojects_in_Bangladesh
5.https://roadsonline.com.au/protecting-the-supply-chain-in-mega-
infrastructureprojects/