ZTE Representation : ;
EMR Representation : ;
Check the position of FAT is installed according to the Design plan □passed □fail □N/A
Check the stability of FAT and or pedestal fixed on
1 Position □passed □fail □N/A
pole/pedestal/wall as per the Design plan
Check the pedestal foundation according to the standard design
□passed □fail □N/A
plan
Ensure the Pedestal and or FAT body is not damage □passed □fail □N/A
Ensure the FAT adapters are not damage □passed □fail □N/A
2 Condition Ensure the FAT pigtails not damage □passed □fail □N/A
Ensure the FAT adapters & connectors are using SC/APC □passed □fail □N/A
Ensure the FAT and or pedestal can be open and locked properly □passed □fail □N/A
Check the FAT label and numbering according MR numbering plan □passed □fail □N/A
4 Label FAT
Check the cable label and pigtail label □passed □fail □N/A
Comments :
N/A
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID : ID :
Signature : Signature :
Date : Date :
Acceptance Test Procedure
Checklist for Fiber Distribution Terminal (FDT)
Check the position of FDT is installed according to the Design plan □passed □fail □N/A
Check the stability of FDT fixed on the concrete foundation as per
1 Position □passed □fail □N/A
Design plan
Check the FDT foundation according to the standard Design plan □passed □fail □N/A
Ensure the FDT adapters are not damage □passed □fail □N/A
Ensure the FDT splitters, adapters & connectors are using SC/APC □passed □fail □N/A
Ensure the FDT door can be open and locked properly □passed □fail □N/A
Ensure cable route are installed neat & properly □passed □fail □N/A
Check the FDT label and numbering according MR numbering plan □passed □fail □N/A
4 Label FDT
Check the cable label and pigtail label □passed □fail □N/A
Comments :
SMG 100-0201
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID : ID :
Signature : Signature :
Date : Date :
Acceptance Test Procedure
Checklist for Civil work- Trench & HDPE laying
N/A
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID : ID :
Signature : Signature :
Date : Date :
Acceptance Test Procedure
Checklist for Road and Railway Crossing
N/A
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID : ID :
Signature : Signature :
Date : Date :
Acceptance Test Procedure
Check List for Bridges Crossing
N/A
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID : ID :
Signature : Signature :
Date : Date :
Acceptance Test Procedure
Check List for Precast Handhole/Precast Handhole Pit
(Visual Checking)
Size Measurement
Inner : Outer :
L
W
D
N/A
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID : ID :
Signature : Signature :
Date : Date :
Acceptance Test Procedure
Check List for Handhole/Handhole Pit
(Visual Checking)
Size Measurement
Inner : Outer :
L
W
D
N/A
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID : ID :
Signature : Signature :
Date : Date :
Acceptance Test Procedure
Checklist for Boring Rojok Manual (BRM)
N/A
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID : ID :
Signature : Signature :
Date : Date :
Acceptance Test Procedure
Check List for Building Cable Access
Panggung kidul RW 01
Region : Semarang Inner Subfeeder :
N/A
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID:
ID :
Signature : Signature :
Date : Date :
Acceptance Test Procedure
Check List for Pole Erection with Accessories
Region : Semarang Inner Subfeeder/Route : Panggung Kidul RW 01
Link From : OLT Gajahmungkur To :
Address : Kecamatan Semarang Utara Address : Panggung Kidul RW 01
Inspection Item
Pole to Pole Span Height of Pole installed Pole Depth Solution Pole Labelling Pole Accessories Installation Area Clean ATP Result
Pole height (7Mtr/9Mtr) If hole depth can't reach to the
and hole depth comply standard requirement
Pole Accessories
with standard Pole have label Pole Foundation and near
Cut pole to like - Hanger, Pole Wise ATP Output
DESCRIPTION => (1.4m/1.8m), Move to another pole ID & EMR by area should be neat
keep same Clamps & Etc should result
differentiation veticality proposed name labeling and clean
clearance with follow the Specs.
pole note more than 2 location
Degree other pole
Pole 001 □pass □fail □Need Repair
Pole 002 □pass □fail □Need Repair
Pole 003 □pass □fail □Need Repair
Pole 004 □pass □fail □Need Repair
Pole 005 □pass □fail □Need Repair
Pole 006 □pass □fail □Need Repair
Pole 007 □pass □fail □Need Repair
Pole 008 □pass □fail □Need Repair
Pole 009 □pass □fail □Need Repair
Pole 010 □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Pole ... □pass □fail □Need Repair
Comments :
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name :
ID : ID :
Signature : Signature :
Date: Date:
Acceptance Test Procedure
Checklist for Cable Installation in HH,HH Pit and OTB
(Visual Inspection)
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik 7
Name : Name :
ID : ID :
Signature : Signature :
Date : Date :
RECORD OF PUNCH LIST
CW ATP
Project Name : EMR-ZTE FTTH TURNKEY PROJECT
Subfeeder Name : Panggung Kidul RW 01
Subfeeder ID : SF29-99-064
ATP Date :
Sign
No Defect Item Target Date Repaired Date
(customer)
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name : Name : Name :
ID : ID : ID : ID :
Signature : Signature : Signature : Signature :
FDT No. No. Defect Item Defect Description Punchpoint Result Date Of Clearence
Signatures :
PT. ZTE Indonesia PT. Eka Mas Republik PT. ZTE Indonesia PT. Eka Mas Republik
Name : Name : Name : Name :
ID : ID : ID : ID :
Signature : Signature : Signature : Signature :
Pada hari ini, tanggal , bulan , tahun , kami yang bertanda tangan di bawah ini :
Nama :
Nama :
Telah melaksanakan pengecekan ulang untuk hasil rektifikasi punch list Civil Work seperti dibawah ini dengan hasil
BAIK dan DITERIMA.
Cluster ID : SF29-99-064
ATP Date :
FDT No Defect Item Defect Description Punch Point Type Result Date of Clearence
Nama : Nama :
Site Photo
For
ZTE Representation : ;
EMR Representation : ;