You are on page 1of 2

INTERNAL INSPECTION REPORT

(QAP CODE – D11)


Date: 23.06.2020

1. CUSTOMER : M/S MECON LIMITED, RANCHI - 834002

2. PURCHASE ORDER NO. : 11.51.10KH/HYDRAULIC SYSTEMS/9513


DATED – 15.07.2019

3. DRAWING NO. : MEC/11/24/10KH/H/DE/0010


: MEC/11/24/10KH/H/GA/0020

4. NAME OF EQUIPMENT : HYDRAULIC SYSTEM FOR BOWL CLEANING


MACHINE

5. POWER PACK SL. NO. : HE/MEC/PU/001 & HE/MEC/PU/002.

6. VALVE STAND SL. NO. : HE/MEC/VS/001 & HE/MEC/VS/002.

1. OVERALL DIMENSIONS ARE IN MM:


a) TANK DIMENSION : 1400 x 900 x 950 (H)
b) BASE FRAME DIMENSION : 2050 x 1400
c) POWER PACK OVERALL DIMENSION : 2050 x 1400 x 1820 (H)
d) POWER PACK FOUNDATION DIMENSION : 100 x 900 x 950 x 100 x 1330
e) VALVE STAND OVERALL DIMENSION : 2116 x 440
f) VALVE STAND FOUNDATION DIMENSION : 1975 x 360
g) JUNCTION BOX SIZE : 600 x 200 x 80
h) FOUNDATION HOLE SIZE : Ø20 clear hole

2. SYSTEM PRESSURE AS SPECIFIED:


a) WORKING PRESSURE : 120 BAR.
b) TEST PRESSURE : 180 BAR.

3. PUMP FLOW:
a) PUMP FLOW : 32 LPM

(Contd. Page - 02)


(PAGE - 02)

INTERNAL INSPECTION REPORT


(QAP CODE – D11)

4. ELECTRICAL MOTOR:
a) 15HP x 1500 RPM, B35 MTG : ABB MAKE

5. IDENTIFICATION MARKS:
a) ITEM NOS : FIXED.
b) MODEL NAME PLATE : FIXED.

6. OBSERVATION:
a) ALL THE ITEMS ARE FITTED AS PER DRAWING.
b) ALL FUNCTIONS ARE TESTED THROUGH TEST CONTROL UNIT AND
FOUND TO BE SATISFACTORY.

FOR HYDROCRAFT ENGINEERS

(Authorized Signatory)