You are on page 1of 5

Techno‐Commercial Offer

To

FOR

HEATED TYPE DRYER


Quotation
Ref No. : - SEPL/9368 Date: - 12.06.2017
Subject: - Quote for Heated type Nitrogen Gas dryer

To,
M/s BENZO CHEM INDUSTRIES PVT. LTD. Kind Attn: Mr. Sanis Mhatre
26/28 A, Cawasji Patel Street, Mobile : +91 8983277146
Fort, Mumbai - 400 001 E-mail : sanis@benzochem.co.in

Thank you for your enquiry for the subject equipment and take pleasure in submitting our Offer as under:

Sr. No. Item Description Qty Unit Rate Amount


(Rs) (Rs)
1
Design, manufacture & supply of Internally Heated Type
Nitrogen gas Dryer , 50 Nm3/hr. capacity with all accessories & 1 No. 3,95,000/- 3,95,000/-
first charge of Desiccants as per attached P & ID SEPL- 9368 -00

Note:
1) Dew point transmitter is included in our scope of supply
2) Any validation document require will be charged extra

I am an experienced chartered engineer from IIT Bombay and you can be assured of getting technically superior
products at correct prices.

Your early favorable response is eagerly awaited.

Rajendra Tahiliani Director - Technical (B.Tech - IIT Bombay)


Bhavesh R Thakkar (9324865178)
Encl : as above
The above Quotation shall be governed by attached Commercial Terms & Conditions and attached
warranty policy

1 INCOTERMS : Ex-works, unpacked, Freight Octroi ,unloading and transit Insurance to


be borne extra by customer
2 Freight : Extra at actuals
3 VALIDITY : Up to 60 days from date of Offer & subject to confirmation thereafter.
PACKING &
4 : Extra @ 3%
Forwarding

(a) Excise Duty : Extra @ 12.5 %


5 TAXES :
(b) VAT/CST : Extra @ 13.5 % ,2 % against form C

6 DELIVERY : Within 6 to 8 weeks from date of receipt of Order with advance


Supervision of starting of the Systems at your site after it is
satisfactorily installed as per our instructions will be charged extra at
7 START-UP :
Rs.15, 000/- per day per person plus reasonable traveling and other
expenses.

PAYMENT (a) 30% of basic price as advance with Order.


8 :
Terms (b) Balance against Performa invoice prior to dispatch

Our Commercial Details:


VAT NO : 27810801644 V WEF 16-11-2010
CST NO : 27810801644 C WEF 16-11-2010
PAN NO : AAOCS4600H
ECC NO : AAOCS4600HEM003
MSME : 27-021-11-06037 Part I

For SPANTECH ENGINEERS PVT.LTD.

Authorized Signatory
WARRANTY POLICY

SPANTECH ENGINEERS PVT. LTD. (hereafter referred to as SEPL) expressly extends warranty
to the Heatless Air Dryer against defects in materials and workmanship, under normal use and
operation, as per terms of the warranty listed below. If any Compressors are part of the Systems,
they will not be covered by this warranty but will be covered separately by the Original Equipment
Manufacturer's warranty.

The SEPL Warranty includes the following:

Free repair or replacement of component parts where defects occur within the first twelve
(12) months from date of commissioning or Fifteen (15) months from the date of Invoice,
whichever is earlier.

These warranties shall be null, void, inoperative, and not binding upon SEPL because of the
following:

1) If a defect or malfunction occurs due to incorrect maintenance of the Air Compressor due to
which the feed air quality, pressure and temp. is affected resulting in occurrence of fault in
the Equipment or any part thereof

2) Repair, attempted repair, adjustment or servicing by any party or person other than an
authorized representative of SEPL. This warranty shall extend and apply to the above-
referred equipment only while said system is owned and used exclusively by the original
purchaser.

3) Malfunctioning of any parts/equipment due to incorrect operation or maintenance which is not


in accordance with the recommendations mentioned in the Pre-Installation Instructions and
User Manual of SEPL.

4) Damage to any parts/equipment during transit, shifting, erection and storage

5) Operation of the System beyond its designed parameters of flow rate, pressure, temperature
and purity

6) Defects arising due to external circumstances beyond the control of SEPL and the User due
to occurrence of natural calamities and other acts of God, terrorist attacks, sabotage by
internal and external parties or
Annexure-1

Technical Data sheet

1. SYSTEM CAPACITY : 50 Nm3/hr.

2. NITROGEN INLET CONDITIONS (By Customer)

(a) Nitrogen Flow : 55 Nm3/hr.


(a) Pressure : 5.0 bar g
(b) Temperature : 40 o C

3. UTILITY REQUIREMENT (By Customer)


(a) 3 PH-415V AC ,50 Hz power supply for 1.5 KW Heater
(b) Instrument Air 0.2 Nm3/hr. @ 5.0 bar g

4. DRY NITROGEN OUTLET CONDITIONS


(a) Pressure : 4.8 bar
(b) Atmospheric Dew Point : - 70o C to -75o C
(c) Flow Rate : 50 Nm3/hr.

5. ADSORBENT : Molecular sieve

6. PRESSURE DROP : 0.2 bar in clean condition

7. CYCLE TIME : Adsorption 8 hrs./


Regeneration 4 hrs. + cooling 4 hrs.

8. SPACE REQUIREMENTS : 1200 mm L x 2100 mm W x 1900 mm H Approx

9. SCOPE OF SUPPLY : Complete package as shown in P & ID SEPL- 9368 -


00 duly assembled on common skid.
10. MATLS OF CONSTN
(a) Adsorbers/Filters : IS : 3589 / IS : 2062
(b) Pipes : IS : 1239 / CS
(c) Base Frame : M.S. channel
(d) Valves : Aluminum / Brass

11. DESIGN RATINGS


(a) Pressure : 6 bar g
(b) Temperature : 250 o C
(c) Atmosphere : Non-hazardous