Project: R-1068 - Hotel Staff Accommodation On Plot No. 811-1445 at Al Warsan 3, Dubai
Client : M/S WASL LLC
Consultsnt M/S Al Wasl Al Jajeed Engineer Consultant
Main cont.:M/S Ginco Contracting LLC
Irrigation Schedule & Valve size Calculation for Drip
First cycle
Valve (LPS) as Total Total First Cycle Water
cycle run
Valve No. size as per Groups Station duretio Demand
duretio dureti
S.No as per Type of valve per IFC revised Station Run n per for first
n on Start Stop cycle (Lit/
Drawing drawin shop Run flow day
(minute (minut
g drawin (LPS) (min) Day)
) e)
1 DV-1 EM 2'' 1.16
2 DV-2 EM 2'' 1.19
1 4.27 20 60 0:20 4:00 4:20 5127.70
3 DV-3 EM 2'' 1.08
4 DV-4 EM 2'' 0.85
5 DV-5 EM 2'' 0.85
6 DV-6 EM 2'' 0.85
2 3.39 20 60 0:20 4:20 4:40 4062.49
7 DV-7 EM 2'' 0.85
8 DV-8 EM 2'' 0.85
9 DV-9 EM 2'' 0.85
10 DV-10 EM 2'' 0.85
3 3.39 20 60 0:20 4:40 5:00 4062.49
11 DV-11 EM 2'' 0.85
12 DV-12 EM 2'' 0.85
13 DV-13 EM 2'' 0.85
14 DV-14 EM 2'' 0.82
4 4.63 20 60 0:20 5:00 5:20 5555.83
15 DV-15 EM 2'' 0.82
16 DV-16 EM 2'' 2.14
17 DV-17 EM 2'' 1.15
18 DV-18 EM 2'' 0.96
5 7.79 20 60 0:20 5:20 5:40 9342.75
19 DV-19 EM 2'' 2.67
20 DV-20 EM 2'' 3.01
21 DV-21 EM 2'' 1.46
6 1.6 20 60 0:20 5:20 0:00 1968.00
22 DV-22 EM 2'' 0.18
23 DV-23 EM 2'' 4.65
24 DV-24 EM 2'' 0.85 6 6.07 20 60 0:20 6:00 6:20 7285.00
25 DV-25 EM 2'' 0.57