SCOPE OF WORK
1. INCOMING INSPECTION
2. CLEANING
4. NON-DESTRUCTIVE TEST
a. Penetrant Test
b. Ultrasonic Test
5. DESTRUCTIVE TEST
a. Hardness Test
b. Coating Thickness Test
6. FINAL INSPECTION
7. INSPECTION REPORT
1. PURPOSE
This process routine provides paint instruction for the prevention of heat scaling, oxidation,
abration, erosion and corrosion by using Sermetel "W" Coating.
Applicability : # 1 st thru # 11 th stage Compressor Disk
# 3 rd thru # 11 th Compressor Stator
# 4 th thru # 11 th Compressor Spacer
IGV, 1st and 2nd Variable Vanes Stator
2. SCOPE
2.1.1 Masking area not to be coated on compressor disk
2.1.2 Applying sermetel W and sermeseal to the disks as shown
2.2.1 Masking area not to be coated on compressor stator
2.2.2 Applying sermetel W and sermeseal to the stators
2.3.1 Masking area not to be coated on compressor spacer
2.3.2 Applying sermetel W and sermeseal to the spacers
2.4.1 Masking area not to be coated on stator vanes.
2.4.2 Applying sermetel W and sermeseal to the stator vanes
3. REFERENCES
3.1 Overhaul inspection standard No. CCR-I-101
3.2 Overhaul repair standard No. CPT-R-101-1-4-1
4. MATERIAL REQUIREMENTS
4.1 Sermetel 'W'
4.2 120-240 Aluminum Oxide
4.3 Masking Tape
4.4 Plastic plugs, cups, etc.
4.5 Clean, dry shop air
5. EQUIPTMENT, TOOLING :
5.1 Spray Gun
5.2 Oven with temperature recorder.
5.3 Rubber Gloves
5.4 Isolated spray booth arrestor type.
5.5 Compressed air ( dry )
5.6 Grit blast machine
5.7 Mechanical agitator or paint shaker
5.8 Humidity and temperature indicator
Note : Prepared by:
B. ACCOMPLISHMENT INSTRUCTION
1 Chemical Cleaning
2 Stripping old coating
3 Non-Destructive Test
4 Masking area not to be coated ( Disk, Stator, Space and Vanes)
5 Apply SERMETEL W (0.0010 - 0.0030 inch)
6 Baking the part per PMP no. PS-001 step 6.2.4
7 Thickness Measurment on Coating
A. GENERAL
1 PURPOSE
This process routine provides paint instruction for the prevention of heat scaling, oxidation,
abration, erosion and corrosion by using AMDRY Coating.
Applicability : # 1 st Nozzle
# 2 nd Nozzle
# 3 th Nozzle
2 SCOPE
2.1.1 Masking area not to be coated on nozzle
2.1.2 Applying Amdry to nozzle stg #1
2.2.1 Masking area not to be coated on nozzle
2.2.2 Applying Amdry to nozzle stg #2
2.3.1 Masking area not to be coated on nozzle
2.3.2 Applying Amdry to nozzle stg #3
3 REFERENCES By User
4 MATERIAL REQUIREMENTS
4.1 METCO 962 AMDRY FRAXAIR N1Z11
4.2 120-240 Aluminum Oxide
4.3 Masking Tape
4.4 Plastic plugs, cups, etc.
4.5 Clean, dry shop air
5 EQUIPTMENT, TOOL
5.1 Plasma spray machine
5.2 Rubber Gloves
5.3 Grit blast machine
5.4 Compressed air ( dry )
B. ACCOMPLISHMENT INSTRUCTION
1 Chemical Cleaning
2 Stripping old coating
3 Non-Destructive Test
4 Masking area not to be coated
5 Apply METCO 962 AMDRY
1 Argon 80 psi
2 Hidrogen 60 psi
3 Flow argon 120 psi for bond coat
4 Flow argon 90 psi for top coat
5 Volt 75 ±5
6 Ampere 500
7 Carrier gas flow 10±/-1 @40 psi
8 Powder fort number 6 p/n ( 3mb 288 )
9 Vibrator pressure 25 ± 5
10 Primary gas argon flow 120±/-2 SCFH@80psi
11 Hydrogen flow 2-20 SCFH @60psi
A. SCOPE OF WORK
1 Chemical Cleaning
2 Dimensional Inspection
3 Creating production drawing
4 Prepare for coating process
5 Masking areas not to be coated
6 Applied coating on the taper hub
7 Finish grinding
8 Inspection :
a Dimensional Inspection
b Mechanical Run out
c NDT ( FPI/MPI and UT)
d Check taper contact
9 Engineering Report
10 Packaging and delivery
INSPECTION SUMMARY
WORK
NO DESCRIPTION QTY GOOD REPAIR
INSTRUCTION
Welding (21ea),
7 Nozzle stg #1 22 1 21 Coating. Replace
Cooling Cup (8)
Welding (20ea),
8 Nozzle stg #2 22 2 20
Coating
Welding (6ea),
9 Nozzle stg #3 13 7 6
Coating
INSPECTION RESULT :
Inspected by : :
PENETRANT TESTING LEVEL
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 08 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 09 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
INSPECTION RESULT :
Inspected by : :
PENETRANT TESTING LEVEL II
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 10 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 11 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
INSPECTION RESULT :
Inspected by : :
PENETRANT TESTING LEVEL II
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 12 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 13 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
INSPECTION RESULT :
Inspected by : :
PENETRANT TESTING LEVEL II
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 14 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 15 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 9. Penetrant Application on Comp Fig 10. Penetrant Inspection on Comp Stg
Stg #8, Dwell Time : 15 Minute #8, Using Black Light (UV 365nm)
Fig 11. Penetrant Application on Comp Fig 12. Penetrant Inspection on Comp Stg
Stg #9, Dwell Time : 15 Minute #9, Using Black Light (UV 365nm)
Fig 13. Penetrant Application on Comp Fig 14. Penetrant Inspection on Comp Stg
Stg #10, Dwell Time : 15 Minute #10, Using Black Light (UV 365nm)
Fig 15. Penetrant Application on Comp Fig 16. Penetrant Inspection on Comp Stg
Stg #11, Dwell Time : 15 Minute #11, Using Black Light (UV 365nm)
Page : 16 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
INSPECTION RESULT :
Inspected by : :
PENETRANT TESTING LEVEL II
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 17 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 18 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 9. Penetrant Application on Comp Fig 10. Penetrant Inspection on Comp Stg
Stg #7, Dwell Time : 15 Minute #7, Using Black Light (UV 365nm)
Fig 11. Penetrant Application on Comp Fig 12. Penetrant Inspection on Comp Stg
Stg #8, Dwell Time : 15 Minute #8, Using Black Light (UV 365nm)
Page : 19 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 13. Penetrant Application on Comp Fig 14. Penetrant Inspection on Comp Stg
Stg #9, Dwell Time : 15 Minute #9, Using Black Light (UV 365nm)
Fig 15. Penetrant Application on Comp Fig 16. Penetrant Inspection on Comp Stg
Stg #10, Dwell Time : 15 Minute #10, Using Black Light (UV 365nm)
Fig 17. Penetrant Application on Comp Fig 18. Penetrant Inspection on Comp Stg
Stg #11, Dwell Time : 15 Minute #11, Using Black Light (UV 365nm)
Page : 20 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
INSPECTION RESULT :
Inspected by : :
PENETRANT TESTING LEVEL II
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 21 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 22 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 9. Penetrant Application on Comp Fig 10. Penetrant Inspection on Comp Stg
Stg #5, Dwell Time : 15 Minute #5, Using Black Light (UV 365nm)
Fig 11. Penetrant Application on Comp Fig 12. Penetrant Inspection on Comp Stg
Stg #6, Dwell Time : 15 Minute #6, Using Black Light (UV 365nm)
Fig 13. Penetrant Application on Comp Fig 14. Penetrant Inspection on Comp Stg
Stg #7, Dwell Time : 15 Minute #7, Using Black Light (UV 365nm)
Page : 23 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 15. Penetrant Application on Comp Fig 16. Penetrant Inspection on Comp Stg
Stg #8, Dwell Time : 15 Minute #8, Using Black Light (UV 365nm)
Fig 17. Penetrant Application on Comp Fig 18. Penetrant Inspection on Comp Stg
Stg #9, Dwell Time : 15 Minute #9, Using Black Light (UV 365nm)
Fig 19. Penetrant Application on Comp Fig 20. Penetrant Inspection on Comp Stg
Stg #10, Dwell Time : 15 Minute #10, Using Black Light (UV 365nm)
Fig 21. Penetrant Application on Comp Fig 22. Penetrant Inspection on Comp Stg
Stg #11, Dwell Time : 15 Minute #11, Using Black Light (UV 365nm)
Page : 24 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
REPAIR
8 EA - SPACER STAGE 4 -11 FINAL
PROCEDURE
ASTM E 144 - API 687/616
012/NDT-UT/PRD-GT/II//22
TEST AREA : ACCESIBLE AREA
INSTRUMENT Part Disposition According to AMPLITUDE
MFG : RIGOR NDT Specification GAIN (DBS) 42 db
TYPE : RFD1000 Accepted Rejected Review AMPL. (%FSH ) 80%
S.N : A00214110806 TRANSDUCER
UT - OK
CALIBRATION BLOCK SINGLE DUAL
ASTM CERT. F.B. H.: 5/64 ULTRASONIC METHOD STRAIGHT WAVE SHEAR WAVE
V2 BLOCK CONTACT FREQ.(MHZ) 4 -
IIW BLOCK IMMERSSION DIA. (mm) 10 -
STEP WEDGE ANGLE 0 -
INSPECTION RESULT :
Inspected by : :
ULTRASONIC TESTING LEVEL II
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 25 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 26 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
REPAIR
11 EA - COMP. DISK STAGE 1 -11 FINAL
PROCEDURE
ASTM E 144 - API 687/616
012/NDT-UT/PRD-GT/II//22
TEST AREA : ACCESIBLE AREA
INSTRUMENT Part Disposition According to AMPLITUDE
MFG : RIGOR NDT Specification GAIN (DBS) 40 db
TYPE : RFD1000 Accepted Rejected Review AMPL. (%FSH ) 80%
S.N : A00214110806 TRANSDUCER
UT - OK
CALIBRATION BLOCK SINGLE DUAL
ASTM CERT. F.B. H.: 5/64 ULTRASONIC METHOD STRAIGHT WAVE SHEAR WAVE
V2 BLOCK CONTACT FREQ.(MHZ) 4 -
IIW BLOCK IMMERSSION DIA. (mm) 10 -
STEP WEDGE ANGLE 0 -
INSPECTION RESULT :
Inspected by : :
ULTRASONIC TESTING LEVEL II
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 27 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 28 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 9. UT Inspection and Evaluation on Fig 10. UT Inspection and Evaluation on Internal
Internal Area of Comp. DIsk STG #9 Area of Comp. DIsk STG #10
Fig 11. UT Inspection and Evaluation on Fig 12. UT Inspection and Evaluation on Internal
Internal Area of Comp. DIsk STG #11 Area of Comp. DIsk STG #11
Page : 29 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
AS RECEIVED
REPAIR
FINAL
11 EA - COMP. DISK STG 1 - 11 RESIDUAL FIELD CHECK
MAGNETIZATION OTHER
PROCEDURE
ASTM E-1444
TEST AREA : ALL VISIBLE SURFACE 011/NDT-MT/PRD-GT/II/22
MAGNETIZER METHOD Part Disposition RESIDUAL MAGNETISM
INSPECTION RESULT :
Inspected by : :
MAGNETIC PARTICLE TESTING LEVEL II
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 30 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 31 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 11. MT Inspection and Evaluation Fig 12. MT Inspection and Evaluation on
on Com. Disk STG #11 Com. Disk STG #11
Page : 32 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
INSPECTION RESULT :
Nozzle Stg #2 2 20 -
Nozzle Stg #3 7 6 -
Inspected by : :
PENETRANT TESTING LEVEL
( Dadang Hermawan )
Note : Prepared by:
ARI HERDIANA
Page : 33 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 34 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 9. Found Crack Indication on Fig 10. Found Crack Indication on Nozzle
Nozzle STG #1 Segment 7 STG #1 Segment 8
Fig 11. Found Crack Indication on Fig 12. Found Crack Indication on Nozzle
Nozzle STG #1 Segment 9 STG #1 Segment 10
Fig 13. Found Crack Indication on Fig 14. Found Crack Indication on Nozzle
Nozzle STG #1 Segment 11 STG #1 Segment 12
Fig 15. Found Crack Indication on Fig 16. Found Crack Indication on Nozzle
Nozzle STG #1 Segment 13 STG #1 Segment 14
Page : 35 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 17. Found Crack Indication on Fig 18. Found Crack Indication on Nozzle
Nozzle STG #1 Segment 15 STG #1 Segment 16
Fig 19. Found Crack Indication on Fig 20. Found Crack Indication on Nozzle
Nozzle STG #1 Segment 17 STG #1 Segment 18
Fig 21. Found Crack Indication on Fig 22. Found Crack Indication on Nozzle
Nozzle STG #1 Segment 19 STG #1 Segment 20
Fig 23. Found Crack Indication on Fig 24. Found Damage on Cup Cooling
Nozzle STG #1 Segment 21 Hole 8 Segment Nozzle.
Page : 36 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 37 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 9. Found Crack Indication on Fig 10. Found Crack Indication on Nozzle
Nozzle STG #2 Segment 7 STG #2 Segment 8
Fig 11. Found Crack Indication on Fig 12. Found Crack Indication on Nozzle
Nozzle STG #2 Segment 9 STG #2 Segment 10
Fig 13. Found Crack Indication on Fig 14. Found Crack Indication on Nozzle
Nozzle STG #2 Segment 11 STG #2 Segment 12
Fig 15. Found Crack Indication on Fig 16. Found Crack Indication on Nozzle
Nozzle STG #2 Segment 13 STG #2 Segment 14
Page : 38 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Fig 17. Found Crack Indication on Fig 18. Found Crack Indication on Nozzle
Nozzle STG #2 Segment 15 STG #2 Segment 16
Fig 19. Found Crack Indication on Fig 20. Found Crack Indication on Nozzle
Nozzle STG #2 Segment 17 STG #2 Segment 18
Fig 21. Found Crack Indication on Fig 22. Found Crack Indication on Nozzle
Nozzle STG #2 Segment 19 STG #2 Segment 20
Page : 39 Form-005
INSPECTION DATA RECORDS FORM ID : 001-REV02
ENGINE TYPE - MODULE PART NO. - SERIAL NO. ISSUED BY : ARI H.
SOLAR TURBINE TURBINE ROTOR APPROVED BY :
CENTAUR 45 N/A DATE : 29-May-23
Page : 40 Form-005