Surface Preparation for Application of External Epoxy
SAIC-H-2014 15-Jul-18 Coating-
Coating on Pipeline
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
Personnel involved in protective coating activities has been qualified and SAEP-316,
A1
certified to perfom their task. Para. 5.1
SAES-H-201,
The Vendor shall furnish chemical. analyses for all batches of abrasives
Para.8.2.5
A2 used to demonstrate compliance with these requirements.
SAES-H-001 Para
Note: Sand is prohibited to be used as abrasive as per GI-0006.021.
8.2.3
Weld and its adjacent areas are free of weld spatter, weld slag, sharp
SAES-H-201,
B2 edges, burrs, knurls and cold laps/laminations, deep corrosion pits,
Para. 7.2.2
gouges and any other sharp surface discontinuities.
C Surface Preparation
Abrasive blasting shall be carried out only when the steel surface is at SAES-H-001,
C1
least 3°C above the Dew Point. Para. 6.4.3
Compressed air quality is checked at the start and at mid point of each 8
hour shift.
- Attach a piece of blotter or absorbent paper to a clip board, then
- Reduce the nozzle pressure to 388 kpa (50 Psig) SAES-H-001,
C2 - Hold the blotter approximately 45-60 cm in front of the blast nozzle for Para. 6.5.1
one minute.
Blotter shall show no water or oil contamination.
Bare metal was blasted to near white metal cleanliness, SA 2-1/2. for
external and to white metal cleanliness, Sa 3, for internal. The surface
profile shall be 50 to 100 micrometers. For internal girth weld, it should be SAES-H-201,
C3
done by the Contractor, unless otherwise specified in the scope of work. Para. 8.2.3
Pipe bung shall be used to protected shop- applied pipe coating.
The first blasted girth weld in each shift shall be tested for chlorides.
Residual chloride on the surface shall not exceed 20 mg/m² in accordance
SAES-H-201,
with ISO 8502-6. Test one out of each successive 20 girth weld areas..
D1 Para. 8.2.6
Note: Chloride test methods needs prior approval in writing by RSA/CSD
Blasting abrasives shall comply with paragraphs 6.3 and 8.2 requirements
of SAES-H-001 and shall contain less than 50 ppm chlorides and sulfates.
SAES-H-201,
They shall be stored in a dry condition and maintained dry during use.
D2 Para. 8.2.5
Sand shall not be used as an abrasive. The Vendor shall furnish chemical
analyses for all batches of abrasives used to demonstrate compliance
with these requirements.
The edges of original coatings shall be feathered out 50mm around the
SAES-H-201,
E2 repair area and area shall be free from dust before application of Patch
Para. 9.5.2
coating
Remarks:
Reference Documents:
1. SAES-H-201: General Specifications for External and Internal FBE Coatings of Pipeline Field Girth Welds (31 May 2018)
2. SAES-H-001: Coating Selection & Application Requirements for Industrial Plants & Equipment, (21 February 2018).
3 . SAEP-316: Performance Qualification of coating personnel (31 July 2016)