ESTIMATE FOR MATERIALS

No Materials Qty Unit Unit Cost Total Grand Total


.
1. 10mm 66 Pcs 10.00USD 627.00USD
2. 6mm 35 Pcs 6.00USD 210.00USD
3. Blocks 2500 Pcs 80.00LD 1,333.00USD
4. 2 by 2 10 Pcs 350.00LD 25.00USD
5. Cement 100 Bags 8.50USD 850.00USD
6. Wire Nails 3 Ctn 20.00USD 60.00USD
7. Steel Nails 20 Packs 250.00LD 33.00USD
8. Grand Pole 20 Pcs 250.00LD 33.00USD
9. Tie Wire 2 Roll 10.00USD 20.00USD
10. Crush Rock 2 Blade 85.00USD 320.00USD
11. Sand 6 Blade 25.00USD 300.00USD
12. Wawa 30 Pcs 900.00LD 180.00USD
13. Line 6 Roll 150.00LD 5.00USD
14. Head Pan 4 Pcs 5.00USD 20.00USD
15. Total Materials Cost 4,016.00USD
16. Transportation 350.00USD
17. Contingency 380.00USD
18. Workmanship 1,700.00USD
19. Grand Total 6,486.00USD