You are on page 1of 1

MAPA

MAINTENANCE DEPARTMENT
TITLE: BOILER CHECKLIST
PREVENTIVE MAINTENANCE CHECKLIST
(Hourly)

Boiler : 1 2 4 5 Month:

Year: 2023

DATE:
Weeks 6am 7am 8am 9am 10am 11am 12pm 1pm 2pm 3pm 4pm 5pm 6pm 7pm 8pm 9pm 10pm11pm12am 1am 2am 3am 4am 5am Remarks
Task
Boiler Online ( )
Steam Pressure (Bar)
Steam Flow Rate (kg)

Boiler Water Level


(3/4,1/2,Low)
Feed Water Pump
Pressure (Bar)
Burner Flame Rate (%)

Feedtank water level


(Full,3/4,1/2,Low)
CRU Pump Running No
Abnormalities
CRU Tank Pressure (Bar)

Feed Tank Temperature


(Deg C)
Stack Temperature (Deg
C)
Blowdown Chemical 7204 7205 7209
Feed water pipe Strainer Rec.Dosage
Cleaning
Chemical Dosage
Water Gauge Glass
(Testing)
Supervisor (Check
& Review)

Remarks:

PF MT 72 - B

You might also like