You are on page 1of 1

Rate Analysis

Provinding and fixing of Metropole Valve (Jaquar Model No. : FLV-CHR-1093N) with all
tools, tackles, labour, equipment complete as directed by EIC.

Details N L B D /H Qty. Unit Unit Rate Total


Amount

1 Metropole Valve 1.00 Each 4922.50 4922.50


2 Labour
Plumber
(Sor 15-16, Sr. No. 25 1.00 Each 303.00 303.00
Code No. L025 )

Total 5225.5

3 Water Charge 1% 52.26

994.95
Add: contractor profit 20%
4 Cess Charge 1% 10.47

Total for 1 Nos. 6283.18


Per No

You might also like