The graphs above are reprinted from a report of the investigation into the effects of misalignment
on power consumption that was carried out at the ICI Rocksavage Site, Runcorn from 4th July–
16th August 1994.
The pump was installed to circulate water through a closed loop of piping with the motor running
at 3000 rpm. The motor rating was 7.5 KW. Pure horizontal offsets and angular misalignment
were introduced into the machine set, and the current drawn by the motor was recorded.
Data in yellow boxes can be modified to suit plant details and costs
Number of
Alignment Data KW Rating Units
Total additional cost of power consumed across plant 594.00 Total cost of power los
Page 1 of 16
Seal replacement cost (for cartridge seals at average costs from seal manufacturers)
In this graph, the lower threshold values are taken from the Durametallic Intec Training Handbook.
Failure is defined when the seal starts to leak. In practise, the seals are not replaced immediately
but continued to be used for some time. Based on data from AES Seals, the upper threshold values
show seal life based on typical industry practice. For the purposes of this purchase justification, the
more conservative upper curve is used.
75 KW 244.00
125 KW 325.00
Total additional cost of seals consumed across plant per year 732.93
this is the additional cost of seals over the expected annual cost when m'cs aligned to 0.05mm
Annual cost of seals
Page 2 of 16
Number of pumps per
Bearing replacement cost for motor only (based on average costs from bearing distributers) Total cost of seals cons
this is the additional cost of bearings over the expected annual cost when machines are aligned to 0.05mm
75 KW 60.00 Pu
125 KW 72.00
300 KW 230.00
aring cost
Total additional cost of bearings consumed across plant per year 432.46
125 KW 28
250 KW 39
Page 3 of 16
Summary
** these cost are additional to the expected annual running cost 1395.96
of the asset when aligned to 0.05 mm
Page 4 of 16
Boxes filled yellow can be modified
(based on figure 1)
Pump rating
nual cost of power loss per pump GBP15.61 GBP36.42 GBP78.04 ###
Total cost of power loss per year GBP0.00 GBP0.00 ### GBP0.00
Total cost of extra power consumed across plant with measured offset
Total cost of extra power consumed across plant when offset = 0.05 mm
Page 5 of 16
(based on figure 2)
Pump rating
30 mm shaft diameter
50 mm shaft diameter
75 mm shaft diameter
###
###
Page 6 of 16
Number of pumps per unit rating 0 0 10 0
Pump rating
30 mm shaft diameter
50 mm shaft diameter
75 mm shaft diameter
00 mm shaft diameter
50 mm shaft diameter
Page 7 of 16
Pump rating
otal cost of pump repairs per year GBP0.00 GBP0.00 ### GBP0.00
Page 8 of 16
###
GBP0.00
GBP780.36
GBP186.36
Page 9 of 16
###
Page 10 of 16
0
GBP0.00
GBP1,025.73
GBP292.80
###
GBP0.00
GBP504.46
GBP72.00
Page 11 of 16
###
GBP0.00
GBP2,959.50
GBP844.80
Page 12 of 16
Best case example
t of power loss per pump per year GBP3.73 GBP8.70 GBP18.64 GBP31.06 GBP74.55
Total cost of power loss per year GBP0.00 GBP0.00 ### GBP0.00 GBP0.00
Total cost of extra power consumed across plant when offset = 0.05 mm GBP186.36
Seal replacement cost (for cartridge seals at average costs from seal manufacturers)
15 KW ###
35 KW 210.00 210
Annual cost of seals per pump GBP21.60 GBP25.20 GBP29.28 GBP39.00 GBP51.60
Total cost of seals per year GBP0.00 GBP0.00 ### GBP0.00 GBP0.00
Total cost of seals consumed across plant when offset = 0.05 mm GBP292.80
Page 1 of 16
Replacement interval in months 100.00
15 KW GBP21.00
35 KW 22.00 GBP22.00
Annual cost of bearings per pump GBP2.52 GBP2.64 GBP7.20 GBP8.64 GBP27.60
Total cost of bearings per year GBP0.00 GBP0.00 GBP72.00 GBP0.00 GBP0.00
Total cost of bearings consumed across plant when offset = 0.05 mm GBP72.00
Annual repair costs per pump GBP46.08 GBP53.76 GBP84.48 ### ###
Total cost of pump repairs per year GBP0.00 GBP0.00 ### GBP0.00 GBP0.00
Total pump repair costs across plant when offset = 0.05 mm GBP844.80
total yearly cost of repair and power waste when aligned to +/- 0.05 MM OFFSET 1395.96