You are on page 1of 1

Rate Analysis

Provinding and fixing of 2 way bib cock (Jaquar Model No. : CON - 041KN) with all tools, tackles,
labour, equipment complete as directed by EIC.

Details N L B D /H Qty. Unit Unit Rate Total


Amount

2 Way Bib Cock


1 1.00 Each 1644.50 1644.50
(Jaquar Model No. : CON - 041KN)
2 Labour
Plumber
(Sor 15-16, Sr. No. 25 Code No. L025 0.50 Each 303.00 151.50
)

Total 1796

3 Water Charge 1% 17.96


4 Cess Charge 1% 18.14

Add: contractor profit 20% 336.12


From (Sr no 1,3-4)
Total for 1 Nos. 3964.22