Professional Documents
Culture Documents
25%
1 Rental Workshop 100,000,000.00 125,000,000.00
2 Engineering Support Dokument to CIB 40,000,000.00 50,000,000.00
3 Supply Material & Fabrikasi Modifikasi Bracket Cremona WT. Crane Semi Gantry Crane 1800 64,800,000.00 81,000,000.00
- Cutting & Drilling hole Cremona H400 x 200 x 200 LG, qty 38 item
- Cutting & Drilling Top Runway H400 x 200 x 100 LG, qty 16 item
- Supply Bracket Plate 12mm untuk cremona Joint, Qty 38 item
- Supply Bracket Plate 12mm untuk runway Joint, Qty 16 item
5 Modifikasi Support Electrical Cable & Utility Air Line, Kolomn B32, B33 4,500,000.00 5,625,000.00