ARD10 A.Y.

2022-2023
TIMELINE AND REQUIREMENTS

A. TIMELINE
NO. ACTIVITY DATE
Schematic Plans Feb 22 – 23
II & III
(SDP, Floor plans) March 1 – 2
IV Elevations & Sections March 8 - 9
V & VI Architectural Details & Structural Concepts March 15 - 16
VII Perspectives March 22 - 23
Walkthrough & Scale model
VIII & IX April 12 - 13
(75% Accomplished)
All Requirements
April 19 - 20
(100% Accomplished)
Submission of Boards April 24
Thesis Deliberation April 24 - 28

B. DRAWING REQUIREMENTS
1. Materials Show from ground (contour) up to building
— 30” x 40” foam board 1 Cross; 1 Longitudinal
— Walk-through Presentation
Site Elevation
2. Drawings/Board Content Show from road up to building
I. CONCEPT BOARD 1 Front; 1 Side/Rear (whichever)
(Short write-ups & illustrations)
Statement of the Problem (Brief) V. ARCHITECTURAL DETAILS
Design Philosophy Details:
Design Objectives Architectural features
Design Concept — New elements
Design Considerations — New technologies
Evolution of Concept/Design — New materials/finishes
— Bay section ex. for canopy designs
II. SDP & VICINITY MAP
Scale: Depends as long as FIT to board with VI. STRUCTURAL CONCEPT
minimum of 1” border all sides Details:
Bay section (roof down to foundation)
III. FLOOR PLANS
Scale: 1:200 mts. VII. PERSPECTIVES
Details: Details:
Per building Exterior
With furniture, fixture, equipment — Site Aerial Perspective (1)
— Spot Perspective of Important Buildings
IV. SECTIONS & ELEVATIONS
Scale: 1:200mts. Interior
Details: — Show important parts of the building
Main Building — Minimum of 4
2 Sections (1 Cross; 1 Longitudinal)
4 Elevations VIII. WALKTHROUGH
IX. SCALE MODEL (GROUP THESIS ONLY)
Site Section
Scale: Same with SDP