SL# EPM RFI # DATE TIME LOCATION WBS/BI/JO NO ACTIVITY # INSPECTIO 2032 SAIC # ACTIVITY EQUIPMENT DESCRIPTION INSPECTOR DRAWING # STATUS PRIMARY SAPID REPLY
N LEVEL #
HUGRS- HWYH UNYZ GAS SATIP-H- Inspection of Top Coat Application GIP QC CATINSPECTION OF APCS-2C TOP COAT YOUSSEF M.
APPLIED ON 20 INCH 8 INCH PIPES AND JOINTS GIPSON
1404955815 2-Nov-23 8.30AM RESERVOIR 10-14224-0003 3.5 W SAIC-H-2031 VARIOUS RIAZ
COAT-6659 100-01 (Dry/Cured Coating) HASSAN
STORAGE GGM
HUGRS- HWYH UNYZ GAS SATIP-H- Inspection of Repair/Touch-up of GIP QC CAT TOUCH UP AND REPAIR OF APCS- YOUSSEF M.
COAT-6660
1404955835 2-Nov-23 7.40AM RESERVOIR 10-14224-0003 3.6 W
100-01
SAIC-H-2032
Coatings 2C, ON 20 INCH 8 INCH PIPES AND JOINTS GIPSON VARIOUS
HASSAN
RIAZ
STORAGE GGM
HUGRS- HWYH UNYZ GAS SATIP-H- SAIC-H-2029 Inspection of Primer Coat prior to top GIP QC CAT INSPECTION OF PRIMER COAT YOUSSEF M.
1404955780 2-Nov-23 8.50AM RESERVOIR 10-14224-0003 3.3 W PRIOR TO MID COAT OF APCS 1B ON 16 INCH GIPSON VARIOUS RIAZ
COAT-6661
STORAGE GGM 100-01 coating
AND 4 INCH JOINTS
HASSAN
HUGRS- HWYH UNYZ GAS SATIP-H- SAIC-H-2029 Inspection of Primer Coat prior to top GIP QC CAT INSPECTION OF PRIMER COAT YOUSSEF M.
1404955871 2-Nov-23 8.50AM RESERVOIR 10-14224-0003 3.3 W PRIOR TO MID COAT OF APCS 2C ON 20 INCH GIPSON VARIOUS RIAZ
COAT-6662
STORAGE GGM 100-01 coating
AND 8 INCH JOINTS