You are on page 1of 6

Supplier Name: Calidus

Date: 20 October 2020

Potential
Item Description
Points
NOTE: Evidence must be submitted with this tender in support of the
response to each of the items in the scoring sheet, as stated below for each
individual item. Failure to submit adequate documentary proof of the item,
will result in a zero score for the particular item.

Number of years of supplying HD cellulosic power TRFR insulation


1
material to Eskom and/or Rotek
Provide a list of orders/projects over the stated period below, on the format
provided
Never - 1 years 0
1 - 2 years 1
2 - 5 years 2
5 years and longer 3

Number of years of supplying HD cellulosic power TRFR insulation


2
material to South African based power TRFR manufacturers
Provide a list of orders/projects over the stated period below, on the format
provided
Never - 1 years 0
1 - 2 years 1
2 - 5 years 2
5 years and longer 3

Insulation processing facillity (cutting, punching, forming, ect. Of


3
insulation material) in South Africa
Provide a profile of the insulation processing facility, that describes the
layout and capabillity of the facillity. This profile must include at least the
following information namely…
- Address of the facillity
- Photo's of the facillity, inside and outside
- List of plant and machinery together with their purpose and capabillity,
age of equipment
- Factory layout
- Production capacity of the facillity
- Storage, packaging and delivery methodology
- A factory visit may be conducted to verify the submitted documentation
against the actual facillity, at ERI's discretion
none submitted 0

minimalistic information supplied and/or facillity is basic, etc. 1

detailed information supplied but the facillity is basic, etc. 2


detailed information supplied and facillity is advanced, etc. 4

4 Delivery time from task order for boards, t-sticks, clacks


More than 30days 0
More than 14 and up to than 30days 1
More than 7 and up to 14days 2
Up to 7 days 3

5 Guarantee on quality and performance of materail and workmanship


none 0
3 months 1
6 months 2
12 months or longer 3

Number of years that the original manufacturer has been manufacturing


6
and supplying power transformer cellulosic insulation materials
Provide a company profile of the original equipment manufacturer
Never - 5 years 0
5 - 20 years 1
20 - 50 years 2
50 years and longer 3

Information about the insulation materials (from the original


7
manufacturer)
- Complete the A&B schedule
- Include a company profile of the original equipment manufacturer
- State the brand name of material being offered
- State the country of manufacture
- Product brochures for boards, paper, moulded components, etc.
- Product type test certificates
- Material application notes, etc.
nothing submitted 0
minimalistic information supplied 1
detailed information supplied (multiple brochures, type test certificates,
4
application notes, etc.)

8 Samples
Samples provided are not within specified tolerances 0
Samples provided are within specified tolerances 1

Gatekeepers
1 Samples UoM
The following samples must be submitted together with the tender
submission. The samples will form part of the technical evaluation of the
submission. The samples provided will be compared to the criteria specified
in the A&B schedules. NB! Failure to submit samples will result in complete
disqualification of the tender submission.
1.1 Pre-compressed high density cellulosic transformer board mm
1.2 T-stick transformer pre-compressed high density cellulose mm
Insulation clack strip transformer pre-compressed high density cellulose,
1.3 mm
calibrated
1.4 Transformer paper, creped mm

2 Completion of A&B Schedules


Technical data for each material item such as boards, cylinders, sticks,
clacks, paper, etc. must be stated in the A&B Schedule for the particular
item being offered. Material deviation from the stated specification will
result in disqualification.
NB! Failure to complete the information in the A&B Schedules will result in
complete disqualification of the tender submission.

A final score of 70% or higher, together with meeting the two gatekeepers,
3
is required to pass the functional evaluation of this tender.

Calculation of final score


The final score is calculated as follows:
(Actual points / Max possible points) X Weighting%
Sum of the individual weighted percentages of all items

Evaluator's Name: Johann Venter


Evaluator's Signature : Johann Venter
Final
Mark with "X" Weight
Score

10% 10.0%

10% 10.0%

40% 40.0%
40% 40.0%

5% 5.0%

5% 5.0%

10% 10.0%

10% 10.0%
x

10% 10.0%
x

Total 100% 100.0%

Dimensions Qty
100X100X0.4 2
1040X26.4X7.0 2
1960X50X2.0 2
100mX50X0.3 2

You might also like